ML21280A340
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 10/07/2021
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ITAAC 3.3.00.07d.iv.c, ND-21-0313
Download: ML21280A340 (6)


Text

i Michael J. Yox 7825 River Road C<-ki 4- Nil Regulatory Affairs Director Waynesboro, GA 30830 iOUtnern INUClear Voglle3S 4 706 848 6459 a OCT 0 7 21121 Docket Nos.: 52-025 ND-21-0313 10 CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC 3.3.00.07d.iv.c [Index Number 8081 Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the compietion of Vogtie Eiectric Generating Plant (VEGP)

Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 3.3.00.07d.iv.c

[Index Number 808]. This ITAAC verified that for the radioiogicaiiy controlled area of the auxiliary building where spatial separation between Class IE divisions and Non-Ciass IE raceway distance is less than specified, an analysis has been performed and demonstrates that the Class 1E cables will still perform their design function.

The closure process for this ITAAC is based on the guidance described in NEI-08-01, "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52" which is endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Kelli Roberts at 706-848-6991.

Respectfully submitted, 3- Voy Michael J. Yox Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 3.3.00.07d.iv.c [Index Number 808]

MJY/CMK/sfr

U.S. Nuclear Regulatory Commission ND-21-0313 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena III Mr. D. L. McKinney Mr. H. Nieh Mr. M. D. Meier Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Ms. J.M. Coleman Mr. C. T. Defnall Mr. C. E. Morrow Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beiike Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Regulatory Commission Ms. M. Bailey Mr. M. King Mr. G. Bowman Ms. A. Veil M . C. P. Patel M . G. J. Khouri M C. J. Even M B. J. Kemker Ms. N. C. Coovert M C. Welch M J. Gaslevic M O. Lopez-Santiago M G. Armstrong M M. Webb M T. Fredette M C. Santos M B. Davis M J. Vasquez M . J. Eargle M E. Davidson M . T. Fanelli Ms. K. McCurry M . J. Parent M . B. Griman

U.S. Nuclear Regulatory Commission ND-21-0313 Page 3 of 3 Oqlethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Dalton Utiiities Mr. T. Bundros Westinqhouse Electric Company. LLC Dr. L. Oriani Mr. D. C. Durham Mr. M. M. Corletti Mr. Z. S. Harper Mr. J. L. Coward Other Mr. 8. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, inc.

Mr. 8. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Baich Bingham

U.S. Nuclear Regulatory Commission ND-21-0313 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-21-0313 Enclosure Vogtle Electric Generating Plant(VEGP) Unit 3 ITAAC Closure Notification on Completion of ITAAC 3.3.00.07d.iv.c [Index Number 808]

U.S. Nuclear Regulatory Commission ND-21-0313 Enclosure Page 2 of 3 ITAAC Statement Design Commitment 7.d) Physical separation is maintained between Class 1E divisions and between Class 1E divisions and non-Class 1E cables.

Inspections. Tests. Analvses Inspections of the as-built raceways that route Class 1E cables will be performed to confirm that the separation between raceways that route Class 1E cables of different divisions, and between raceways that route Class 1E cables and raceways that route non-Class 1E cables is consistent with the following:

iv) Separation distances less than those specified above and not run in enclosed raceways or provided with barriers are based on analysis Acceptance Criteria Results of the inspection will confirm that the separation between raceways that route Class 1E cables of different divisions, and between raceways that route Class 1E cables and raceways that route non-Class 1E cables is consistent with the following:

iv.c) For areas in the radiologically controlled area of the auxiliary building, a report exists and concludes that separation distances less than those specified above and not provided with enclosed raceways or barriers have been analyzed.

ITAAC Determination Basis Multiple ITAAC are performed to ensure that physical separation is maintained between Class 1E divisions and between Class 1E divisions and non-Class 1E cables. In accordance with this ITAAC, separation distances for circuits that do not meet the criteria of ITAAC 3.3.00.07d.ii.c

[Index 802] or ITAAC 3.3.00.07d.iii.c [Index 805] may be based on analyses. For circuits that have separation distances based on analyses, the subject ITAAC requires inspections to confirm that separation distances have been analyzed. The Class 1E cables and raceways and non-Class1 E cables in the radiologically controlled area of the auxiliary building are designed to be appropriately separated in accordance with APP-GW-E1-001 (Reference 1). Installation specifications provided to the constructor identify separation criteria, consistent with the ITAAC commitment.

Class 1E electrical cables and raceways are installed in accordance with design drawings, installation specifications issued for construction and work package requirements. Completed raceway installation, in-progress and completed cable installation, and completed cable terminations are inspected to ensure the separation installation specifications are satisfied.

Inspections are performed in accordance with the Construction Quality Verification Program 26139-000-4MP-T81C-N7101 (Reference 2). ITAAC 3.3.00.07d.ii.c [Index 802] will confirm that inspection records are completed to document the satisfactory separation between raceways

U.S. Nuclear Regulatory Commission ND-21-0313 Enclosure Page 3 of 3 that route Class 1E cables of different divisions, and between raceways that route Class 1E cables and raceways that route non-Class 1E cables.

Cable Separation Report for Analyses (Reference 3)confirmed that the separation between raceways that route Class 1E cables of different divisions, and between raceways that route Class 1E cables and raceways that route non-Class 1E cables is consistent with the following:

For areas inside the radiologically controlled area of the auxiliary building, separation distances less than those specified above (i.e. in the COL)and not provided with enclosed raceways or barriers have been analyzed. The analysis performed for this ITAAC is performed in accordance with standard IEEE 384-1981, and demonstrates that the effects of lesser separation for non-Class 1E fiber optic linear heat detection system cables within safety related cable trays in the radiologically controlled area of the auxiliary building do not impact the ability of Class 1E circuits to perform their safety related functions (References 4 and 5).

Exceptions to the subject ITAAC are not included within the scope of this ITAAC and are addressed within the scope of ITAAC 3.3.00.07d.v.c [Index 811].

References 1 through 5 are available for NRC inspection, as well as the Unit 3 ITAAC 3.3.00.07d.iv.c Completion Package (Reference 6).

ITAAC Finding Review In accordance with plant procedures for ITAAC completion. Southern Nuclear Operating Company(SNC) performed a review of all ITAAC findings and associated corrective actions.

This review found no relevant ITAAC findings associated with this ITAAC.

ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 3.3.00.07d.iv.c was performed for VEGP Unit 3 and that the prescribed acceptance criteria are met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References(available for NRC inspection)

1. APP-GW-E1-001,"Electrical Systems Design Criteria"
2. 26139-000-4MP-T81C-N7101,"Bechtel Construction Quality Verification Program"
3. SV3-CSR-ITR-800808 Rev 0,"Unit 3 Cable Separation Report for Analyses"
4. APP-GW-EOR-006,"IEEE 384 Design Compliance Description"
5. APP-GW-GEF-850316,"Design Evaluations for Compliance with IEEE 384 Spatial Separation"