ML21259A230

From kanterella
Jump to navigation Jump to search

Enclosure 2 - SER Certificate of Compliance No. 9979, Revision No. 2, for the Model No. 9979 Package
ML21259A230
Person / Time
Site: 07109979
Issue date: 09/30/2021
From:
Office of Nuclear Material Safety and Safeguards
To:
Savannah River National Lab
P Saverot NRC/NMSS/DFM/STLB 3014157505
Shared Package
ML21259A227 List:
References
CoC No. 9979, EPID L-2021-RNW-0008
Download: ML21259A230 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION REPORT Docket No. 71-9979 Model No. 9979 Certificate of Compliance No. 9979 Revision No. 2

SUMMARY

By letter dated June 18, 2021 (ADAMS Accession No. ML21195A395), Savannah River National Laboratory (Savannah River Nuclear Solutions) requested the renewal of U.S. Nuclear Regulatory Commission Certificate of Compliance (CoC) No. 9979, for the Model No. 9979 Type A Fissile radioactive material shipping package.

By letter dated August 26, 2021 (ADAMS Accession No. ML21256A273), Savannah River Nuclear Solutions, LLC requested a change to the certificate holder from Savannah River Nuclear Solutions to Battelle Savannah River Alliance, LLC.

There have been no changes to the package since the last issuance of the CoC. The certificate has been renewed for an additional five years.

EVALUATION Savannah River National Laboratory (SRNL) requested renewal of CoC No. 9979 without changes to the package design, operating procedures, acceptance tests, and maintenance program of the package. SRNL separated from Savannah River Nuclear Solutions, LLC, on June 21, 2021, and, on that date, Battelle Savannah River Alliance, LLC became the new management and operating contractor of SRNL from the U.S. Department of Energy. By letter dated August 26, 2021, Battelle Savannah River Alliance, LLC stated it will assume all responsibilities of the CoC holder.

CONDITIONS The following changes have been made to the certificate:

Item No. 3.a was modified to reflect Battelle Savannah River Alliance, LLC, as the CoC holder.

Condition No. 13 was modified to reflect the new expiration date of the certificate.

CONCLUSION The certificate has been renewed for a five-year term. These changes do not affect the ability of the package to meet the requirements of 10 CFR Part 71.

Issued with Certificate of Compliance No. 9979, Revision No. 2.

JM PS WW

  • via email K Eberl DATE Certificate of Compliance No. 9979, Revision No. 2, for the Model No. 9979 Package September 20, 2021 OFFICE NMSS/DFM/STLB*

NMSS/DFM/STLB NMSS/DFM/STLB NAME WWheatley PSaverot JMcKirgan DATE Sep 16, 2021 Sep 16, 2021 Sep 20, 2021 OFFICIAL RECORD COPY 2