ND-21-0605, ITAAC Closure Notification on Completion of ITAAC 2.6.03.05d.i (Index Number 613)

From kanterella
(Redirected from ML21197A078)
Jump to navigation Jump to search
ITAAC Closure Notification on Completion of ITAAC 2.6.03.05d.i (Index Number 613)
ML21197A078
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 07/15/2021
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-21-0605
Download: ML21197A078 (6)


Text

,1 HI I Michael J. Vox 7825 River Road Southern Nuclear Regulatory Affairs Waynesboro, GA 30830 Vogtle 3 & 4 706-848-6459 tel JUL 1 5 2021 Docket No.: 52-025 ND-21-0605 10 CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC 2.6.03.05d.i (Index Number 6131 Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant(VEGP) Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) item 2.6.03.05d.i [Index Number 613]for verifying the IDS Divisions B and C regulating transformers supply their post-72-hour ac loads when powered from an ancillary diesel generator. The closure process for this ITAAC is based on the guidance described in NEI 08-01, "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52,"

which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Kelli Roberts at 706-848-6991.

Respectfully submitted, Michael J. Vox Regulatory Affairs Defector Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant(VEGP) Unit 3 Completion of ITAAC 2.6.03.05d.i [Index Number 613]

MJY/JMW/sfr

U.S. Nuclear Regulatory Commission ND-21-0605 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena III Mr. D. L. McKlnney Mr. M. D. Meier Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. M. J. Vox Mr. A. S. Parton Ms. K. A. Roberts Mr. C. T. Defnall Mr. C. E. Morrow Mr. J. M. Fisher Mr. R. L. Beiike Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Reoulatorv Commission Ms. M. Bailey Mr. M. King Mr. G. Bowman Ms. A. Veil M . C. P. Patel M . G. J. Khouri M . C. J. Even M B. J. Kemker Ms. N. C. Coovert M C. Welch M . J. Gaslevic M . O. Lopez-Santiago M G. Armstrong M M. Webb M T. Fredette M C. Santos M B. Davis M J. Vasquez M J. Eargle M E. Davidson M T. Fanelli Ms. K. McCurry M J. Parent M B. Griman

U.S. Nuclear Regulatory Commission ND-21-0605 Page 3 of 3 Oqlethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Dalton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Dr. L. Oriani Mr. D. 0. Durham Mr. M. M. Corletti Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. 8. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.

Mr. 8. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Balch BIngham

U.S. Nuclear Regulatory Commission ND-21-0605 Page 1 of 3 Southern Nuclear Operating Company ND-21-0605 Enclosure Vogtle Electric Generating Plant(VEGP) Unit 3 Completion of ITAAC 2.6.03.05d.i [Index Number 613]

U.S. Nuclear Regulatory Commission ND-21-0605 Page 2 of 3 ITAAC Statement Design Commitment 5.d) The IDS Divisions B and C regulating transformers supply their post-72-hour ac loads when powered from an ancillary diesel generator.

Inspections/Tests/Analvses Inspection of the as-built system will be performed.

Inspection of the as-built system will be performed.

Acceptance Criteria i) Ancillary diesel generator 1 is electrically connected to regulating transformer IDSC-DT-1 ii) Ancillary diesel generator 2 is electrically connected to regulating transformer IDSB-DT-1.

ITAAC Determination Basis Ancillary generators 1 and 2 are provided to supply power to the Class 1E direct current (dc) and Uninterruptible Power Supply System (IDS) Division C and B regulating transformers, respectively, to supply their post-72-hour alternating current (ac) loads. This ITAAC requires an as-built system inspection to verify that each ancillary generator is electrically connected to Its corresponding regulating transformer.

The cables from each ancillary diesel generator to its regulating transformer were installed in accordance with design drawings and specifications issued for construction and work package requirements. Cable continuity and completed cable terminations were inspected in accordance with the Construction Quality Verification Program (Reference 1). A review of the as-built circuit inspection records was performed to confirm ancillary diesel generator 1 is electrically connected to regulating transformer IDSC-DT-1 and ancillary diesel generator 2 is electrically connected to regulating transformer IDSB-DT-1.

The results of the inspection records are summarized in Unit 3 ITAAC 2.6.03.05d.i Technical Report(Reference 2) and confirm ancillary diesel generators 1 and 2 are electrically connected to regulating transformers IDSC-DT-1 and IDSB-DT-1, respectively.

The ITAAC Technical Report is available for NRC inspection as part of the Unit 3 ITAAC 2.6.03.05d.i Completion Package (Reference 3).

U.S. Nuclear Regulatory Commission ND-21-0605 Page 3 of 3 ITAAC Finding Review In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company(SNC)performed a review of all ITAAC findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the Vogtle Unit 3 ITAAC Completion Package for ITAAC 2.6.03.05d.i (Reference 3)and is available for NRC inspection.

ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 2.6.03.05d.i was performed for VEGP Unit 3 and that the prescribed acceptance criteria were met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References(available for NRC inspection)

1. 26139-000-4MP-T81C-N7101, Construction Quality Verification Program
2. SV3-IDS-ITR-800613, Rev. 0,"Unit 3 ITAAC 2.6.03.05d.i Technical Report"
3. 2.6.03.05d.i-U3-CP-Rev 0"Completion Package for Unit 3 ITAAC 2.6.03.05d.i[Index Number 613]"