Letter Sequence RAI |
---|
EPID:L-2021-LLR-0004, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Intervals (Approved, Closed) |
|
|
|
---|
Category:E-Mail
MONTHYEARML23349A0272023-12-15015 December 2023 Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification 5.5.2 ML23284A3322023-10-11011 October 2023 Request for Additional Information Alternative Request (RA-22-0174) (L-2022-LLR-0060) ML23270B8362023-09-26026 September 2023 Code Case N-752 Audit September 26, 2023, E-mail Providing Additional Information Regarding the Use of Owner'S Requirements and Engineering Judgment in Lieu of Code and Standards ML23267A0032023-09-21021 September 2023 RP Inspection Document Request ML23269A0412023-08-22022 August 2023 Code Case N-752 Audit; August 22, 2023, E-mail Providing Additional Information Regarding Design and Quality Program Requirements ML23172A0132023-06-20020 June 2023 Duke Fleet - Correction to June 2, 2023, Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23153A1892023-06-0202 June 2023 Duke Fleet - Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23144A0862023-05-24024 May 2023 Acceptance of Requested Licensing Action Proposed Relief Request (RA-23-0018) to Use ASME Code Case 853 ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23125A1452023-05-0505 May 2023 Change in Estimated Review Schedule and Level of Effort for Proposed Alternative to Use Code Case N-752 ML23124A1212023-05-0404 May 2023 Acceptance of Requested Licensing Action Duke Fleet Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23095A0052023-04-0404 April 2023 002 Radiation Safety Baseline Inspection Information Request ML23086C0362023-03-27027 March 2023 Request for Additional Information Steam Generator Tube Inspection Report (03R31) ML23073A2282023-03-13013 March 2023 Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review ML23058A0562023-02-27027 February 2023 Acceptance of Amendment to Revise Surveillance Frequencies for RCS Pressure Isolation Valve Operational Leakage Testing and Reactor Trip System Instrumentation ML23048A1512023-02-16016 February 2023 Acceptance Review - Proposed Alternative for Steam Generator Welds (L-2023-LLR-0003) ML23038A1832023-02-0707 February 2023 Request for Additional Information Alternative Request (RA-22-0174) to Use ASME Code Case N-752 ML23031A1552023-01-17017 January 2023 1/17/2023 Email from John Moses, Deputy Director, Division of Rulemaking, Environmental, and Financial Support, to Diane Curran, Counsel to Beyond Nuclear and the Sierra Club, Request for Extension of Scoping Comment Period for Oconee EIS ML22294A0812022-10-21021 October 2022 Nrc/Duke Steam Generator Inspection Call for November 8, 2022 NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) ML22251A2902022-09-0808 September 2022 Request for Additional Information Additional Mode Change Limitations Applicable to the Adoption of Technical Specifications Tasks Force Traveler (TSTF) No. 359, Revision 9 ML22235A6552022-08-23023 August 2022 Acceptance of Requested Licensing Action Proposed Alternative to Use ASME Code Case N-752 NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22234A1262022-07-0808 July 2022 Email from NRC to Duke - Feedback on Trp 76 RAI Responses - July 8, 2022 ML22234A1272022-06-14014 June 2022 Email from NRC to Duke - Feedback on Trp 76 RAI Responses - June 14, 2022 ML22154A2142022-06-0101 June 2022 Email from NRC (Angela Wu) to Duke (Paul Guill) - Oconee SLRA - 2nd Round RAI B2.1.7-4b ML22157A0012022-06-0101 June 2022 Email from NRC (Angela Wu) to Duke (Paul Guill) - Oconee SLRA - Additional NRC Comments on RAI 4.6.1-1a ML22124A2052022-05-0404 May 2022 Summary of May 4, 2022, Clarification Call with Duke Energy Carolinas, LLC, Application to Revise TS 3.7.7, Low Pressure Service Water (LPSW) System ML22124A1612022-05-0303 May 2022 Email from Angela Wu (NRC) to Steve Snider (Duke) - Oconee SLRA - 2nd Round RAI B2.1.7-4a ML22122A0192022-04-28028 April 2022 Email from Angela Wu (NRC) to Steve Snider (Duke) - Oconee SLRA - 2nd Round RAI B2.1.9-2a ML22122A1322022-04-27027 April 2022 Email from Angela Wu (NRC) to Steve Snider (Duke) - Oconee SLRA - 2nd Round Requests for Additional Information (FE 3.5.2.2.2.6 - Irradiation Structural) ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22130A0112022-04-25025 April 2022 Email: Oconee SLRA - RAI 4.6.1-1a - NRC Staff Comments ML22112A1892022-04-22022 April 2022 Acceptance Review for Additional Mode Change Limitations Applicable to the Adoption of TSTF- 359, Revision 9 ML22112A0072022-04-20020 April 2022 Email from Marieliz Johnson (NRC) to Steve Snider (Duke) - Oconee SLRA - Request for Confirmation of Information 3.5.2.2.2.6-L ML22113A0082022-04-20020 April 2022 Email from Marieliz Johnson (NRC) to Steve Snider (Duke) - Oconee SLRA - Request for Additional Information 3.1.2-1 ML22088A0452022-03-28028 March 2022 Radiation Safety Baseline Inspection Initial Information Request Inspection Report 2022002 ML22081A0052022-03-21021 March 2022 Email from Angela Wu (NRC) to Steve Snider (Duke) - Oconee SLRA - 2nd Round RAI B4.1-3 ML22080A0792022-03-16016 March 2022 Email from Angela Wu (NRC) to Steve Snider (Duke) - Oconee SLRA - Requests for Additional Information - Set 4 (2nd Round Rais) ML22075A2032022-03-11011 March 2022 Email from Duke to NRC - Follow-Up Items from March 7, 2022 Public Meeting ML22074A0022022-03-11011 March 2022 Email from Duke to NRC - Follow-up Item from March 7, 2022 Public Meeting - SSW Tendon AMP ML22069A0022022-03-0808 March 2022 Email from Angela Wu (NRC) to Steve Snider (Duke) - Oconee SLRA - Requests for Confirmation of Information - Set 4 ML22063A4502022-03-0404 March 2022 Request for Additional Information Application to Revise TS 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required Inoperable LPSW Pump ML22063A1152022-02-23023 February 2022 Email from Duke to NRC - Follow Up Item from February 17, 2022 Public Meeting ML22038A1572022-02-0707 February 2022 NRR E-mail Capture - Duke Energy Fleet - Acceptance of License Amendment Request Regarding Adoption of TSTF-541, Revision 2 ML22035A1892022-01-31031 January 2022 Email from NRC (Angela Wu) to Duke (Paul Guill) - Oconee SLRA - Request for Public Meeting ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML22019A1032022-01-18018 January 2022 Email from Angela Wu (NRC) to Steve Snider (Duke) - Oconee SLRA - Requests for Additional Information - Set 3 ML22012A0432022-01-11011 January 2022 SLRA - Requests for Additional Information - Set 2 2023-09-26
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23284A3322023-10-11011 October 2023 Request for Additional Information Alternative Request (RA-22-0174) (L-2022-LLR-0060) ML23178A0682023-07-0303 July 2023 Audit Plan Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 & 3 Systems Section XI, Division 1 ML23156A2452023-06-0505 June 2023 Audit Summary and RAI-RCI - Revised Enclosure ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23095A0052023-04-0404 April 2023 002 Radiation Safety Baseline Inspection Information Request ML23086C0362023-03-27027 March 2023 Request for Additional Information Steam Generator Tube Inspection Report (03R31) ML23039A1632023-02-0808 February 2023 Requalification Program Inspection ML23038A1832023-02-0707 February 2023 Request for Additional Information Alternative Request (RA-22-0174) to Use ASME Code Case N-752 ML23037A0772023-02-0606 February 2023 402 Cyber Notification and RFI Letter Final ML22251A2902022-09-0808 September 2022 Request for Additional Information Additional Mode Change Limitations Applicable to the Adoption of Technical Specifications Tasks Force Traveler (TSTF) No. 359, Revision 9 ML22234A0052022-08-30030 August 2022 SLRA - Feedback for RAI B2.1.7-4a to Duke - August 16, 2022 ML22157A0042022-06-0606 June 2022 10 CFR 50.59 Inspection Initial Information Request ML22157A0012022-06-0101 June 2022 Email from NRC (Angela Wu) to Duke (Paul Guill) - Oconee SLRA - Additional NRC Comments on RAI 4.6.1-1a ML22154A2122022-06-0101 June 2022 SLRA - 2nd Round RAI B2.1.7-4b ML22124A1632022-05-0303 May 2022 (Public) Oconee SLRA - 2nd Round RAI B2.1.7-4a ML22124A1612022-05-0303 May 2022 Email from Angela Wu (NRC) to Steve Snider (Duke) - Oconee SLRA - 2nd Round RAI B2.1.7-4a ML22122A0182022-04-28028 April 2022 Attachment: Oconee SLRA - 2nd Round RAI B2.1.9-2a ML22122A0192022-04-28028 April 2022 Email from Angela Wu (NRC) to Steve Snider (Duke) - Oconee SLRA - 2nd Round RAI B2.1.9-2a ML22122A1312022-04-27027 April 2022 (Public) Oconee SLRA - 2nd Round RAIs - Trp 76 (Irradiation Structural) - FE 3.5.2.2.2.6 Redacted ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22113A0092022-04-20020 April 2022 Attachment: Oconee SLRA - Final RAI 3.1.2-1 ML22112A0072022-04-20020 April 2022 Email from Marieliz Johnson (NRC) to Steve Snider (Duke) - Oconee SLRA - Request for Confirmation of Information 3.5.2.2.2.6-L ML22081A0062022-03-21021 March 2022 Attachment: Oconee SLRA - 2nd Round RAI B4.1-3 ML22081A0052022-03-21021 March 2022 Email from Angela Wu (NRC) to Steve Snider (Duke) - Oconee SLRA - 2nd Round RAI B4.1-3 ML22080A0772022-03-16016 March 2022 SLRA - RAI Set 4 (2nd Round Rais) ML22069A0012022-03-0808 March 2022 Attachment: Oconee SLRA - Final Requests for Confirmation of Information - Set 4 ML22063A4502022-03-0404 March 2022 Request for Additional Information Application to Revise TS 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required Inoperable LPSW Pump RA-22-0036, Responses to NRC Request for Additional Information Set 22022-02-14014 February 2022 Responses to NRC Request for Additional Information Set 2 ML22019A1042022-01-18018 January 2022 Attachment: Oconee SLRA - Final Requests for Additional Information - Set 3 ML22019A2442022-01-18018 January 2022 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000269/2022010, 05000270/2022010, 05000287/2022010) and Request for Information (RFI) ML22019A1032022-01-18018 January 2022 Email from Angela Wu (NRC) to Steve Snider (Duke) - Oconee SLRA - Requests for Additional Information - Set 3 ML22012A0422022-01-11011 January 2022 SLRA - Final Requests for Additional Information - Set 2 ML22010A1132022-01-0505 January 2022 SLRA - RCIs - Set 3 ML21333A0392021-11-29029 November 2021 RP Inspection Document Request ML21330A0192021-11-23023 November 2021 Attachment: Oconee SLRA - Final Requests for Confirmation of Information - Set 2 ML21327A2782021-11-23023 November 2021 Email from Angela Wu (NRC) to Steve Snider (Duke) - Oconee SLRA - Final RAIs (Set 1 and 2nd Round RAI B2.1.27-1a) ML21327A2792021-11-23023 November 2021 SLRA - Final Requests for Additional Information - Set 1 ML21327A2802021-11-23023 November 2021 SLRA - Final 2nd Round RAI - RAI B2.1.27-1a ML21313A2342021-11-0404 November 2021 Attachment: Oconee SLRA - Final Requests for Confirmation of Information - Set 1 ML21274A0682021-10-0101 October 2021 Request for Additional Information Alternative Request (RA-20-0334) Regarding Use of an Alternative to the ASME Code Case N-853 Acceptance Criteria ML21273A0492021-09-30030 September 2021 Request for Additional Information Alternative Request (ON-RPI-OMN-28) to Use Code Case OMN-28 ML21271A5892021-09-28028 September 2021 SLRA - RAI B2.1.27-1 (Draft) ML21271A5902021-09-28028 September 2021 SLRA - RAI B2.1.27-1 (Final) ML21271A5882021-09-22022 September 2021 SLRA - Request for Additional Information B2.1.27-1 - Email from Angela Wu (NRC) to Steve Snider (Duke) ML21217A1912021-08-0505 August 2021 Request for Additional Information Alternative Request (RA-20-0334) Regarding Use of an Alternative to the ASME Code Case N-853 Acceptance Criteria ML21190A0172021-07-0808 July 2021 NRR E-mail Capture - Oconee Nuclear Station, Units 1, 2, and 3 - Request for Additional Information Alternative for ISI RPV Weld Examination from 10 to 20 Years (EPID-L-2021-LLR-0004) ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML20323A4072020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) 2023-07-03
[Table view] |
Text
From: Stone, Zackary Sent: Thursday, July 8, 2021 4:12 PM To: Zaremba, Arthur H.
Cc: Vaughan, Jordan L; Williams, Shawn
Subject:
Oconee Nuclear Station, Units 1, 2, and 3 - Request for Additional Information RE: Alternative for ISI RPV Weld Examination from 10 to 20 years (EPID-L-2021-LLR-0004)
Attachments: July 8, 2021 - Oconee RR RAIs for RA-20-0328.docx
Dear Mr. Zaremba,
By letter dated January 19, 2021, Duke Energy Carolinas, LLC, submitted a relief request for Oconee Nuclear Station, Units 1, 2, and 3, to extend the inservice inspection interval for the reactor pressure vessel weld examinations from 10 to 20 years.
The U.S. Nuclear Regulatory Commission staff has determined that additional information is needed as discussed in the attached and a clarification call to ensure mutual understanding was conducted on July 6, 2021. Please respond within 30 days of the date of this e-mail.
If you have any questions, please contact me at 301-415-1009 or via e-mail at Shawn.Williams@nrc.gov.
Sincerely, Shawn Williams, Senior Project Manager Plant Licensing Branch, II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos: 50-269, 50-270, and 50-287 cc w/encl: Listserv
Hearing Identifier: NRR_DRMA Email Number: 1268 Mail Envelope Properties (BLAPR09MB635472ED2022988B02BE935FE1199)
Subject:
Oconee Nuclear Station, Units 1, 2, and 3 - Request for Additional Information RE: Alternative for ISI RPV Weld Examination from 10 to 20 years (EPID-L-2021-LLR-0004)
Sent Date: 7/8/2021 4:12:12 PM Received Date: 7/8/2021 4:12:00 PM From: Stone, Zackary Created By: Zackary.Stone@nrc.gov Recipients:
"Vaughan, Jordan L" <Jordan.Vaughan@duke-energy.com>
Tracking Status: None "Williams, Shawn" <Shawn.Williams@nrc.gov>
Tracking Status: None "Zaremba, Arthur H." <Arthur.Zaremba@duke-energy.com>
Tracking Status: None Post Office: BLAPR09MB6354.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 960 7/8/2021 4:12:00 PM July 8, 2021 - Oconee RR RAIs for RA-20-0328.docx 52749 Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION PROPOSED ALTERNATIVE REQUEST NO. RA-20-0328 REGARDING FIFTH AND SIXTH 10-YEAR INSERVICE INSPECTION PROGRAM INTERVALS OCONEE UNITS 1, 2, AND 3 DUKE ENERGY CAROLINAS, LLC DOCKET NOS. 50-269, 50-270, 50-287 EPID: L-2021-LLR-0004
Background
By letter dated January 19, 2021 (ADAMS Accession No. ML21019A276), Duke Energy Carolinas (Duke Energy or the licensee) requested an alternative from the requirements of the American Society of the Mechanical Engineers Boiler and Pressure Vessel, Division 1,Section XI (henceforth ASME Section XI) for Oconee Nuclear Station (ONS) Units 1, 2, and 3. The licensees Code alternative proposed in Relief Request No. RA-20-0328 requests NRC staff authorization to eliminate the performance of the inservice inspection (ISI) volumetric examinations that are required to be performed on pressure retaining welds in the heads, flanges, and shells of the reactor pressure vessel (RPV) and on associated RPV-to-nozzle welds and nozzle inside radius locations (i.e., ASME Code Section XI Category B-A and B-D required examinations) during the ASME-defined fifth 10-Year ISI interval for Oconee Units 1, 2, and 3. The licensee requests staff authorization to defer performance of these volumetric inspections until the sixth 10-Year ISI interval for each unit, by no later than 2034, based on a risk-informed methodology in WCAP-16168-NP-A, Revision 3, Risk-Informed Extension of the Reactor Vessel In-service Inspection Interval.
Regulatory Basis Title 10 of the Code of Federal Regulations (10 CFR) Part 50.55a(z) establishes a process for licensees to propose alternatives to codes and standard requirements. Specifically, for alternatives requested under the criteria in 10 CFR 50.55a(z)(1), the licensee must demonstrate that the proposed alternative would provide an acceptable level of quality and safety. The following requests for additional information (RAIs) are needed to reach a conclusion that the licensees proposed alternative achieves an acceptable level of quality and safety.
RAI 1
Table 3 in RA-20-0328 calculates through wall cracking frequency (TWCF) of reactor vessel beltline components based on methodology found in WCAP-16168-NP-A, Revision 3 (ADAMS Accession No. ML11306A084), and using inputs which include the neutron fluence at 60 years of operation. It is not apparent in the submittal whether this fluence considered the increased thermal power of the Measurement Uncertainty Uprate (MUR) request which was submitted on February 19, 2020 and supplemented by letters dated April 6, 2020, July 23, 2020, and August 17, 2020, (ADAMS Accession Nos. ML20050D379, ML20097E117, ML20205L403, and ML20230A127) and which was approved on January 26, 2021 (ADAMS Accession No. ML20335A001).
Request Please clarify whether the fluence inputs listed in Table 3 of RA-20-0328 were calculated considering the increased thermal power of the MUR request which was approved by the NRC staff on January 26, 2021.
RAI 2
Table 3 in RA-20-0328 calculates TWCF for reactor vessel components in the beltline. The NRC staff notes that no inlet nozzles, outlet nozzles, or nozzle to nozzle belt forging welds are included in Table 3. It also appears that beltline materials include all plate, forging and weld materials if the neutron fluence is greater than or equal to 1x1017 n/cm2 (E>1 MeV). It is not apparent whether the inlet nozzles, outlet nozzles, and nozzle to nozzle belt forging welds will be above or below this fluence threshold at the end of 60 years of operation.
Request Please clarify if the inlet nozzles, outlet nozzles, and nozzle to nozzle belt forging welds will be above or below the fluence threshold of 1x1017 n/cm2 (E>1 MeV) at the end of 60 years of operation. If any of these materials will be above the fluence threshold of 1x1017 n/cm2 (E>1 MeV) at the end of 60 years of operation, please calculate the TWCF for these materials as required by the methodology found in WCAP-16168-NP-A, Revision 3, and add the information for these materials to Table 3.
RAI 3
Table 2 in RA-20-0328 states that the licensee has performed four volumetric ISI examinations of the RPV pressure retaining welds. The licensee identifies that the following numbers of indications were detected within the inner 1/10th or inner 1 inch of the RPV wall thickness.
Unit 1: 10 indications Unit 2: 4 indications Unit 3: 5 indications It is not apparent whether the fourth volumetric ISI inspections of the welds containing these indications were the first inspections that revealed evidence of flaw indications or re-inspections
of the welds containing the flaw indications. Additional information relative to the risk-based assessments of these flaw indications is needed to confirm that any potential growth of the flaws is bounded by the fatigue flaw growth assumptions and values used in the WCAP-16168-NP-A, Rev. 3, methodology.
Request Please confirm whether the fourth volumetric ISI inspections were the first ISI inspections that detected the flaw indications and whether there is any site-specific flaw growth data for the flaw indications evaluated in Table 2 of RA-20-0328. If site-specific flaw growth data for the flaw indications is available, please identify the limiting site-specific flaw growth value that was calculated for the flaws evaluated in Table 2.
RAI 4 to the submittal showed a calculation summary that indicates that crack growth based on design transients (for 20 years) was bounded by crack growth based on 12 heat up/cool down cycles per year (for 20 years). Attachment 1 further specified cooldown, power change, and power loading as the top three design transients which contributed to ~90% of crack growth. However, the number of cycles assumed for the design transients was not stated.
Additional information on the design transients contributing most to crack growth is necessary to determine that the crack growth based on design transients is bounded by the crack growth based on the postulated 12 heat up/cool down cycles per year (Design Transients 1A and 1B respectively).
Request Please identify the number of cycles assumed for Design Transients 1B (cooldown 8% to 0%),
2A (power change (0% to 15%), 2B (power change (15% to 0%), and 3 (power loading 8% to 100%).