MONTHYEARRA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX2024-01-0808 January 2024 Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX RA-23-0320, Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency2023-12-14014 December 2023 Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0404 December 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0182, Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency2023-11-16016 November 2023 Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0304, Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 32 (Revision 0)2023-11-14014 November 2023 Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 32 (Revision 0) RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes2023-11-0101 November 2023 Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes RA-23-0275, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)2023-10-12012 October 2023 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) RA-23-0268, Transmittal of Sixth 10-Year Inservice Testing Interval Program Plan2023-09-29029 September 2023 Transmittal of Sixth 10-Year Inservice Testing Interval Program Plan RA-23-0234, Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS)2023-09-28028 September 2023 Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS) RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes2023-09-20020 September 2023 Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes RA-23-0228, Registration for Use of General License Spent Fuel Cask Number 1752023-09-14014 September 2023 Registration for Use of General License Spent Fuel Cask Number 175 RA-23-0223, Registration for Use of General License Spent Fuel Cask Numbers 173 and 1742023-08-23023 August 2023 Registration for Use of General License Spent Fuel Cask Numbers 173 and 174 RA-23-0222, On-Shift Staffing Analysis (Ossa), Revision 12023-08-23023 August 2023 On-Shift Staffing Analysis (Ossa), Revision 1 RA-23-0211, Reply to a Notice of Violation (NOV) 05000270/2023010-022023-08-17017 August 2023 Reply to a Notice of Violation (NOV) 05000270/2023010-02 RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0186, Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 31 (Revision 3)2023-07-18018 July 2023 Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 31 (Revision 3) RA-23-0184, Registration for Use of General License Spent Fuel Cask Numbers 171 and 1722023-07-10010 July 2023 Registration for Use of General License Spent Fuel Cask Numbers 171 and 172 RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require2023-07-0707 July 2023 Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require RA-23-0146, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)2023-06-20020 June 2023 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) RA-23-0135, Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory2023-06-0707 June 2023 Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory RA-23-0041, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-30030 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations RA-23-0128, Refuel 32 (O1R32) Steam Generator Tube Inspection Report2023-05-18018 May 2023 Refuel 32 (O1R32) Steam Generator Tube Inspection Report RA-23-0018, Relief Request (RA-23-0018) to Utilize Code Case N-853 PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material Susceptible to Primary Water Stress Corrosion Cracking Section XI, Division 12023-05-0404 May 2023 Relief Request (RA-23-0018) to Utilize Code Case N-853 PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material Susceptible to Primary Water Stress Corrosion Cracking Section XI, Division 1 RA-23-0111, Withdrawal of License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-04-27027 April 2023 Withdrawal of License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies RA-23-0104, Response to Request for Additional Information (RAI) Regarding Oconee Unit 3, Refuel 31 (O3R31) Steam Generator Tube Inspection Report2023-04-26026 April 2023 Response to Request for Additional Information (RAI) Regarding Oconee Unit 3, Refuel 31 (O3R31) Steam Generator Tube Inspection Report RA-23-0047, Duke Energy Annual Radiological Environmental Operating Report - 20222023-04-26026 April 2023 Duke Energy Annual Radiological Environmental Operating Report - 2022 RA-23-0044, Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.462023-04-26026 April 2023 Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.46 RA-23-0099, Subsequent License Renewal Application Second Annual Amendment to the License Renewal Application2023-04-25025 April 2023 Subsequent License Renewal Application Second Annual Amendment to the License Renewal Application RA-23-0046, Annual Radioactive Effluent Release Report - 20222023-04-24024 April 2023 Annual Radioactive Effluent Release Report - 2022 RA-22-0292, License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-04-0404 April 2023 License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies RA-23-0036, Biennial Decommissioning Financial Assurance Reports2023-03-30030 March 2023 Biennial Decommissioning Financial Assurance Reports RA-23-0040, Onsite Property Insurance Coverage2023-03-30030 March 2023 Onsite Property Insurance Coverage RA-23-0039, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2023-03-30030 March 2023 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums RA-23-0037, Duke Energy - Decommissioning Funding Plan for Independent Spent Fuel Storage Installations (Isfsis)2023-03-30030 March 2023 Duke Energy - Decommissioning Funding Plan for Independent Spent Fuel Storage Installations (Isfsis) RA-23-0051, Response to Request for Additional Information (RAI) Regarding Proposed Alternative to Use American Society of Mechanical Engineers Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities2023-03-0909 March 2023 Response to Request for Additional Information (RAI) Regarding Proposed Alternative to Use American Society of Mechanical Engineers Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities RA-23-0052, Refuel 32 (O1R32) Inservice Inspection (ISI) Report, Fifth 10-Year ISI Interval2023-02-22022 February 2023 Refuel 32 (O1R32) Inservice Inspection (ISI) Report, Fifth 10-Year ISI Interval RA-22-0257, Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-02-17017 February 2023 Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-23-0001, Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI2023-02-0202 February 2023 Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-22-0256, Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-01-23023 January 2023 Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-22-0335, Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab2022-12-0505 December 2022 Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab RA-22-0334, Refuel 31 (O3R31) Steam Generator Tube Inspection Report2022-11-21021 November 2022 Refuel 31 (O3R31) Steam Generator Tube Inspection Report RA-22-0329, Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 1 Cycle 33 (Revision 0 and Revision 1)2022-11-11011 November 2022 Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 1 Cycle 33 (Revision 0 and Revision 1) RA-22-0285, Subsequent License Renewal - Appendix E Environmental Report Supplement 22022-11-0707 November 2022 Subsequent License Renewal - Appendix E Environmental Report Supplement 2 RA-22-0313, Emergency Action Level (EAL) Technical Basis Document, Revision 4, EAL Wallchart, Revision 3 and Alternate TSC and OSC Renovations2022-10-27027 October 2022 Emergency Action Level (EAL) Technical Basis Document, Revision 4, EAL Wallchart, Revision 3 and Alternate TSC and OSC Renovations RA-22-0270, Response to Request for Additional Information Regarding License Amendment Request to Address Technical Specifications Mode Change Limitations2022-10-0707 October 2022 Response to Request for Additional Information Regarding License Amendment Request to Address Technical Specifications Mode Change Limitations RA-22-0192, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4a2022-09-0202 September 2022 Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4a 2024-01-08
[Table view] |
Text
( ~ DUKE J. Ed Burchfield, Jr.
ENERGY Vice President Oconee Nuclear Station Duke Energy ON01VP l 7800 Rochester Hwy Seneca, SC 29672 o: 864.873.3478 f: 864.873.5791 Ed.Burchfield@duke-energy.com RA-20-0113 10 CFR 50.90 April 6, 2020 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2 and 3 Renewed Facility Operating Licenses Numbers DPR-38, DPR-47, and DPR-55 Docket Numbers 50-269, 50-270, and 50-287
Subject:
Supplemental Information for Measurement Uncertainty Recapture Power Uprate License Amendment Request
References:
- 1. Duke Energy letter, License Amendment Request for Measurement Uncertainty Recapture Power Uprate, dated February 19, 2020 (ADAMS Accession No. ML20050D379)
- 2. Nuclear Regulatory Commission letter, Oconee Nuclear Station, Units 1, 2 and 3 -
Supplemental Information Needed for Acceptance of License Amendment Request for Measurement Uncertainty Recapture Power Uprate (EPID L-2020-LLS-0000), dated March 27, 2020 (ADAMS Accession No. ML20084G372)
By letter dated February 19, 2020 (Reference 1), Duke Energy Carolinas, LLC (Duke Energy) submitted a License Amendment Request (LAR) for Oconee Nuclear Station (ONS) Units 1, 2 and 3 to support a measurement uncertainty recapture (MUR) power uprate. The proposed amendment to the Technical Specifications (TS) of Renewed Facility Operating License Nos.
DPR-38, 47 and 55 would increase each unit's authorized core power level from 2568 megawatts thermal (MWt) to 2610 MWt; an increase of 42 MWt and approximately 1.64% of Rated Thermal Power (RTP).
The Nuclear Regulatory Commission (NRC) staff has requested supplemental information (Reference 2). Duke Energy is submitting the enclosed additional information to support acceptance review of the proposed amendment.
The content of this supplemental correspondence does not change the No Significant Hazards Consideration provided in the original submittal (Reference 1).
U.S. Nuclear Regulatory Commission RA-20-0113 Page2 No regulatory commitments are contained in this letter.
Please refer any questions regarding this submittal to Art Zaremba, Director - Fleet Licensing, at (980) 373-2062.
I declare under penalty of perjury that the foregoing is true and correct. Executed on April 6, 2020.
Very truly yours,
~£,/~I J. Ed Burchfield, Jr.
Vice President Oconee Nuclear Station Enclosure Supplemental Information Needed for Acceptance of License Amendment Request for ONS Measurement Uncertainty Power Uprate
U. S. Nuclear Regulatory Commission RA-20-0113 Page 3 cc w/enclosure:
Ms. Laura A. Dudes, Administrator, Region II U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Mr. Michael Mahoney, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8G9A 11555 Rockville Pike Rockville, Maryland 20852 Mr. Jared Nadel NRC Senior Resident Inspector Oconee Nuclear Station Ms. Anuradha Nair-Gimmi, Bureau Environmental Health Services Department of Health & Environmental Control 2600 Bull Street Columbia, SC 29201
U.S. Nuclear Regulatory Commission RA-20-0113 Enclosure SUPPLEMENTAL INFORMATION NEEDED FOR ACCEPTANCE OF LICENSE AMENDMENT REQUEST FOR ONS MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE Enclosure (2 pages including cover)
U.S. Nuclear Regulatory Commission RA-20-0113 Enclosure By letter dated February 19, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20050D379), Duke Energy Carolinas, LLC (Duke Energy, the licensee) submitted a license amendment request for the Oconee Nuclear Station, Units 1, 2 and 3. Duke Energy proposes to amend the Technical Specifications (TSs) of Renewed Facility Operating License Nos. DPR-38, DPR-47 and DPR-55 (Oconee, Units 1, 2, and 3, respectively), to support a measurement uncertainty recapture (MUR) power uprate.
The NRC staff reviews spent fuel pool criticality in consideration of the requirements of Title 10 of the Code of Federal Regulations, Part 50, Section 68 (10 CFR 50.68), Criticality accident requirements. In part, 10 CFR 50.68 requires for licensees that do not credit soluble boron in the criticality analyses, that the k-effective (keff) of the spent fuel pool (SFP) storage racks must not exceed 0.95 at a 95-percent probability, 95-percent confidence level.
Although the licensee addressed the systems effects of the proposed MUR on the Fuel Storage and Handling System in Section VI of Enclosure 2 of its license amendment request, the effects of the proposed MUR on the SFP criticality analyses are not addressed.
NRC Request for Supplemental Information The NRC staff reviewed the application and concluded that it needs the following information to make an independent assessment regarding the acceptability of the application in terms of regulatory requirements and the protection of public health and safety and the environment.
- 1. Describe the effects that the MUR would have on the SFP criticality analyses (burnup credit, burnable poison removal (BP-Pull) penalty, etc.), considering the content and formatting guidelines provided in Section II or III (analyses that are bounded or not bounded, respectively, by the proposed MUR) of Attachment 1 to Regulatory Issue Summary (RIS) 2002-03, Guidance on the Content of Measurement Uncertainty Recapture Power Uprate Applications (ADAMS Accession No. ML013530183).
Duke Energy Response The analysis of record for the criticality safety analysis of the ONS spent fuel pools was included in the ONS LAR to revise Technical Specifications to account for the degradation of Boraflex panels (Duke Energy letter to NRC dated December 28, 2000, ML010050297), which was approved by the NRC in the Safety Evaluation for that LAR dated April 22, 2002 (ML020930470). The criticality analysis of record was reviewed for the proposed MUR conditions and was determined to remain bounding. The effects of the MUR power uprate on SFP criticality safety, due to impacts to parameters such as fuel temperature, moderator temperature, and fuel power density changes, were evaluated using methods consistent with the NRC-reviewed analysis. The conclusion of this evaluation was that the anticipated fuel design for uprated cores remains less reactive in the SFP than the bounding fuel design, throughout the burnup of the fuel, in the analysis of record. There are no changes to burnup credit or allowable fuel assembly configurations in the SFP currently described in the Technical Specifications due to MUR uprate.