Westinghouse Electric Company, LLC, Information Submittal Related to the AP1000 Design Certification Extension
ML21081A024
Person / Time
Site: 05200006
Issue date: 03/19/2021
From: Corletti M
Westinghouse
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML21081A023 List:
References
DCP_NRC_003343
Download: ML21081A024 (2)


Text

Westinghouse Non-Proprietary Class 3 Westinghouse Electric Company Global Operations Services 1000 Westinghouse Drive Cranberry Township, Pennsylvania 16066 USA U.S. Nuclear Regulatory Commission Direct tel: 412-374-5355 Attention: Document Control Desk e-mail: corletmm@westinghouse.com Washington, DC 20555-0001 DCP_NRC_003343 March 19, 2021

References:

1. ML20178A640, AP1000 Design Certification Extension Request
2. ML20252A153, Rulemaking Plan to Extend the Duration of the AP1000 Design Certification
3. ML20322A047, Staff Requirements - SECY-20-0082 - Rulemaking Plan to Extend the Duration of the AP1000 Design Certification

Subject:

Information Submittal Related to the AP1000 Design Certification Extension By letter dated June 26, 2020 (reference 1), Westinghouse Electric Company LLC (Westinghouse) requested the U.S. Nuclear Regulatory Commission (NRC) extend the duration of the AP1000 design certification (DC). SECY-20-0082 (reference 2) recommended to extend the AP1000 DC an additional five years beyond the current expiration date of February 27, 2021 using the direct final rule process. Staff Requirements Memorandum - SECY-20-0082 (reference 3) approved the recommendation.

In order to enable the NRC staff to make the necessary safety findings under 10 CFR 52.54, Westinghouse hereby submits information that documents five previously resolved technical issues related to the AP1000 design certification. These technical issues were resolved as part of the Levy Nuclear Plant Units 1 & 2, William States Lee III Nuclear Station Units 1 & 2, and Turkey Point Units 6 & 7 AP1000 combined license (COL) applications, as well as the Vogtle Electric Generating Plant Units 3 & 4 COL. The purpose of this submittal is to provide the information necessary to update the generic certified design with the same information that NRC previously reviewed and approved.

This letter does not constitute a DC renewal application request per 10 CFR 52.57. Westinghouse is available to discuss if further clarification is needed. Questions can be directed to Zachary Harper at 412-374-5093 or harperzs@westinghouse.com.

Sincerely, Michael M. Corletti, Director Licensing and Advanced Reactors Engineering AP1000 is a trademark or registered trademark of Westinghouse Electric Company LLC, its affiliates and/or its subsidiaries in the United States of America and may be registered in other countries throughout the world. All rights reserved.

Unauthorized use is strictly prohibited. Other names may be trademarks of their respective owners

© 2021 Westinghouse Electric Company LLC All Rights Reserved

DCP_NRC_003343 Westinghouse Non-Proprietary Class 3

/Enclosures

1. Supplemental Information to Support the AP1000 Design Certification Extension (Non-Proprietary), APP-GW-GL-705
a. Summary Description
b. Design Control Document Markup Pages for Passive Core Cooling System (PXS) Condensate Return
c. Design Control Document Markup Pages for Main Control Room Emergency Habitability System (VES) Changes to Satisfy Post-Actuation Performance Requirements
d. Design Control Document Markup Pages for Improvements to Main Control Room (MCR) Post-Accident Radiological Consequences
e. Design Control Document Markup Pages for Hydrogen Venting from Passive Core Cooling System (PXS) Compartments
f. Design Control Document Markup Pages for PMS Logic Changes for Source Range Flux Doubling
g. Design Control Document Replacement Information
2. Supplemental Information to Support the AP1000 Design Certification Extension (Proprietary), APP-GW-GL-706
a. Proprietary Design Control Document Markups for Main Control Room Emergency Habitability System (VES) Changes to Satisfy Post-Actuation Performance Requirements
b. Proprietary Design Control Document Replacement Information for Main Control Room Emergency Habitability System (VES) Changes to Satisfy Post-Actuation Performance Requirements
3. Affidavit AW-21-5169
4. Security-Related Information, Withhold Under 10 CFR 2.390d cc: Anna Bradford Bob Caldwell Michael Dudek Bruce Bavol