Letter Sequence Request |
---|
|
|
MONTHYEARML21039A7192021-02-0808 February 2021 Request for Alternate Disposal Approval and Exemption for Specific Columbia Fuel Fabrication Waste Project stage: Request ML21153A0012021-06-0101 June 2021 Request for Exemptions Associated with Disposal and Transportation of Specified Columbia Fuel Fabrication Waste Project stage: Request ML21309A0952021-11-0505 November 2021 Westinghouse Electric Company, LLC - Request for Exemption Associated with Disposal of Specified Columbia Fuel Fabrication Facility Waste Project stage: Request ML21351A0382021-11-0505 November 2021 Us Ecology Letter of Support for Westinghouse ADR 4, Request for Exemptions Under 10CFR30.11 and 10CFR70.17 for Alternate Disposal of Wastes from Columbia Fuel Fabrication Facility Under 10CFR20.2002 Project stage: Request ML21336A4612021-12-0101 December 2021 Westinghouse Electric Company, LLC, Alternate Disposal Request Application Correction Project stage: Other ML22054A0472022-03-0404 March 2022 Enc: Safety Evaluation for ADR 4 for Westinghouse Project stage: Approval ML22054A0452022-03-0404 March 2022 Westinghouse ADR 4 Safety Evaluation Package Project stage: Request ML22054A0462022-03-0404 March 2022 Westinghouse Electric Co. LLC - Request for Alternate Disposal and Exemptions for Columbia Fuel Fabrication Facility Waste Disposal at the Us Ecology Idaho Facility (Enterprise Project Identifier L-2021-LLA-0204) Project stage: Other 2021-02-08
[Table View] |
|
---|
Category:Exemption from NRC Requirements
MONTHYEARML22068A0512022-03-24024 March 2022 Westinghouse ADR 4- Letter to Us Ecology ML21309A0952021-11-0505 November 2021 Westinghouse Electric Company, LLC - Request for Exemption Associated with Disposal of Specified Columbia Fuel Fabrication Facility Waste ML21351A0382021-11-0505 November 2021 Us Ecology Letter of Support for Westinghouse ADR 4, Request for Exemptions Under 10CFR30.11 and 10CFR70.17 for Alternate Disposal of Wastes from Columbia Fuel Fabrication Facility Under 10CFR20.2002 ML21257A4392021-09-14014 September 2021 Westinghouse Electric Company LLC - Request for Alternate Disposal Request Revised Scope Review and Approval (Docket No. 70-1151) ML21166A0922021-06-0303 June 2021 Request for Exemptions Under 10CFR30.11 and 10CFR70.17 for Alternate Disposal of Wastes from Columbia Fuel Fabrication Facility Under 10CFR20.2002 ML21153A0012021-06-0101 June 2021 Request for Exemptions Associated with Disposal and Transportation of Specified Columbia Fuel Fabrication Waste ML21061A2782021-03-11011 March 2021 Usei Exemption for Alternate Disposal of Wastes from Columbia Fuel Fabrication Facility Under 10CFR20.2002 ML21061A2732021-02-25025 February 2021 Request for Exemptions Under 10CFR30.11 and 10CFR70.17 for Alternate Disposal of Wastes from Columbia Fuel Fabrication Facility Under 10CFR20.2002 ML21039A7192021-02-0808 February 2021 Request for Alternate Disposal Approval and Exemption for Specific Columbia Fuel Fabrication Waste ML20304A3412020-12-0909 December 2020 Exemption for Alternate Disposal of Specific Waste from the Westinghouse Columbia Fuel Fabrication Facility Under 10 CFR 20.2002, 10 CFR 30.11 and 10 CFR 70.17 ML20302A0842020-12-0909 December 2020 Westinhouse Electric Company, LLC - Amendment 25 to Material License SNM-1107, Exemption for Alternate Disposal of Specific Waste (Enterprise Project Identifier L-2020-LLL-0009) 2022-03-24
[Table view] Category:Letter
MONTHYEARML24023A6952024-01-26026 January 2024 Westinghouse Columbia Fuel Fabrication Facility, U.S. Nuclear Regulatory Commission Inspection Report Number 07001151/2023004 ML24017A2252024-01-22022 January 2024 Westinghouse Electric Company, LLC, Conveyance of Revised Standby Trust Agreement to Support the Decommissioning Funding Plan (Enterprise Project Identifier L-2023-DFA-0009) ML23349A2722023-12-14014 December 2023 Westinghouse, Submittal of Monthly Progress Reports Under Consent Agreement 19-02-HW with the South Carolina Department of Health and Environmental Control ML23338A3372023-12-0404 December 2023 Submittal of Amendment 4 to Standby Trust Agreement (STA) for License Nu. SNM-1107, Replacement of Trust Fund with Additional Surety Bonds, and Certification of Financial Assurance for SNM-1107 ML23311A0032023-11-0606 November 2023 Westinghouse Columbia Fuel Fabrication Facility, U.S. Nuclear Regulatory Commission Inspection Report Number 70-1151/2023-402 (Cover Letter) ML23296A0362023-10-24024 October 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151/2023003 ML23240A5082023-08-28028 August 2023 Westinghouse Electric Company LLC - NRC Semi-Annual Discharge Report (January- June 2023) ML23230B2022023-08-18018 August 2023 Westinghouse, Supplemental Information for Request for Modification to Temporary License Conditions for Sampling, Analysis and Disposition of Hematite Ash Material ML23216A0712023-08-0404 August 2023 Westinghouse Columbia Fuel Fabrication Facility Physical Security Core Inspection Report 07001151/202340 ML23202A1472023-07-24024 July 2023 Westinghouse Columbia Fuel Fabrication Facility Integrated Inspection Report 07001151/2023002 ML23150A2362023-07-0303 July 2023 Letter to Westinghouse Regarding Effluent Testing Issue ML23184A1512023-06-29029 June 2023 Westinghouse Columbia Fuel 2023 Special Nuclear Material Inventory Summary Report Revision ML23171B1502023-06-20020 June 2023 Westinghouse Columbia Fuel 2023 Special Nuclear Material Inventory Summary Report ML23160A2612023-06-0909 June 2023 Westinghouse, Request for Modification to Temporary License Conditions for Sampling, Analysis and Disposition of Hematite Ash Material ML23139A1942023-06-0505 June 2023 Westinghouse Electric Company LLC - Approval of Environmental Sampling and Monitoring Program ML23138A3762023-05-18018 May 2023 Westinghouse Submittal of Columbia Fuel Fabrication Facility Site Emergency Plan, Revision 23 ML23096A2812023-05-15015 May 2023 Letter - Transfer of Control Approval 2023 ML23094A1582023-05-0505 May 2023 Westinghouse Electric Company, LLC - Revision to Temporarily Store Hematite Ash Above License Limits and Removal of Uranium Flywheel ML23115A2382023-04-26026 April 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151/2023001 ML23114A3592023-04-24024 April 2023 Westinghouse Submittal of Environmental Sampling and Monitoring Program for NRC Review and Approval ML23114A3612023-03-23023 March 2023 Enclosures 2 & 3 - SCDHEC Approval Letter of Westinghouse Ri Report, Dated March 23, 2023 and Environmental Sampling and Monitoring Program Section of SNM-1107 License Application ML23058A4482023-02-27027 February 2023 Request for Threshold Determination for Interim Transaction Included in December 20, 2022 Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals ML23058A2722023-02-27027 February 2023 Westinghouse, NRC Semiannual Discharge Report July - December 2022 ML23053A0712023-02-17017 February 2023 Westinghouse Electric Company LLC, Supplement to Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals and Request for Threshold Determination ML23053A0752023-02-17017 February 2023 Westinghouse Electric Co. - Supplement 2 to Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals and Request for Threshold Determination ML23047A4562023-02-16016 February 2023 Westinghouse, Response to Request for Additional Information - Request for Temporary License Amendment for Storage of Hematite Ash ML23030B8552023-01-30030 January 2023 Westinghouse 10CFR70.72 Facility Change Report ML23024A2312023-01-30030 January 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151//2022004 ML23013A2122023-01-27027 January 2023 Acceptance Letter for Westinghouse License Transfer - Cac/Epid L-2022-LLM-0004 ML23026A3642023-01-26026 January 2023 Westinghouse, January 2023 Updated Integrated Safety Analysis Summary ML22354A0732023-01-19019 January 2023 Response to Westinghouse Revised Funding Instrument in Support of the Decommissioning Funding Plan ML22363A0152022-12-29029 December 2022 Westinghouse Electric Co - 60-Day Report Regarding the November 1, 2022, Incident Reported Under 10 CFR 70 Appendix a 24-Hr Report, Columbia Fuel Fabrication Facility (License No. SNM-1107, Docket No. 70-1151) ML22354A2912022-12-20020 December 2022 Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals and Request for Threshold Determination ML22347A1162022-12-13013 December 2022 Westinghouse 2021-2022 Annual Groundwater Monitoring Report ML22336A1742022-12-0202 December 2022 Westinghouse Request for Temporary License Amendment for Storage of Hematite Ash ML22316A0052022-11-10010 November 2022 Westinghouse Electric Company LLC, Submittal of Amendment to Trust Agreement for License Number SNM-1107, Surety Bond Rider for SNM-1107, and Certification of Financial Assurance for SNM-1107 (Proprietary/Non-Proprietary) ML22298A0432022-10-28028 October 2022 Westinghouse Columbia Fuel Fabrication Facility Integrated Inspection Report 07001151/2022003 ML22294A1792022-10-21021 October 2022 Westinghouse, Request to Amend License SNM-1107 and Submittal of SNM-1107 License Application Page Changes ML22259A1802022-09-27027 September 2022 Letter -WEC 2022 DFP Approval MD ML22157A3492022-09-12012 September 2022 Westinghouse Electric Company, LLC - Renewal of Materials License SNM-1107 (Enterprise Project Identifier: L-2017-RNW-0016) ML22249A2252022-09-0606 September 2022 EPA Comments_Columbia Fuels Feis 2022 ML22228A1812022-08-16016 August 2022 Westinghouse, NRC Semi-Annual Discharge Report January - June 2022 ML22217A0422022-08-0505 August 2022 Response Ltr. to Mmitchum, Chief, Pine Hill Indian Tribe, the First People of Fort Jackson Re., Correspondence Related to the Proposed License Renewal for the WEC Cfff in Richland, Sc ML22214A1492022-08-0202 August 2022 Letter to Ms. Michelle Mitchum, Pine Hill Indian Tribe; Re. Westinghouse Cfff ML22215A1952022-08-0202 August 2022 Letter to USNRC and Schpo 8-2-22 from Pine Hill Indian Tribe Re Columbia Fuel Fabrication Facility ML22182A4352022-07-29029 July 2022 Letter to Applicant - Notice of Availability of the Final Environmental Impact Statement for Westinghouse Columbia Fuel Fabrication Facility 2024-01-26
[Table view] |
Text
WESTINGHOUSE NON-PROPRIETARY CLASS 3 Westinghouse Electric Company LLC Columbia Fuel Site 5801 Bluff Road Hopkins, South Carolina 29061-9121 USA Director, Office of Nuclear Material Safety and Direct tel: 803-647-2046 Safeguards U. S. Nuclear Regulatory Commission e-mail: malekem@westinghouse.com Document Control Desk 11555 Rockville Pike Your ref:
Rockville, Maryland 20852-2738 Our ref: LTR-RAC-21-18 February 8, 2021
SUBJECT:
Request for Alternate Disposal Approval and Exemption for Specific Columbia Fuel Fabrication Waste (Docket No. 70-1151, Material License SNM-1107)
REFERENCE:
- 1) NRC letter to Westinghouse, 12/9/2020, Westinghouse Electric Company, LLC-Amendment 25 to Material License SNM-1107, Exemption for Alternate Disposal of Specific Waste (Enterprise Project Identifier L-2020-LLL-0009) (ML20302A084)
- 2) Westinghouse letter to NRC, LTR-RAC-20-45, 5/8/2020, Request for Alternate Disposal Approval and Exemption for Specific Columbia Fuel Fabrication Waste (ML20129J934)
Westinghouse Electric Company, LLC (Westinghouse) requested NRC approval for alternate disposal of specified low-activity radioactive materials from the Columbia Fuel Fabrication Facility (CFFF), License No. SNM-1107, for certain waste containing byproduct material and special nuclear material (SNM) (Reference 2). That request was approved by the NRC on December 9, 2020 via NRC letter to Westinghouse (Reference 1).
In section 3.2 of Enclosure 1 to Reference 2, Westinghouse estimated there was 50,400 ft3 of Calcium Fluoride (CaF2) sludge previously dredged from the Calcium Fluoride Lagoons stored in a segregated area of the CaF2 storage pad. However, after moving the segregated pile of CaF2 it was discovered that the actual volume of material was less than the 50,400 ft3 assumed. Due to this discrepancy, Westinghouse cannot generate the waste aggregation characterized for disposal as described in Reference 2.
Following the submittal of Reference 2, lagoon dredging on site has continued and a second pile (Operations Pile) of CaF2 has been stored on the CaF2 storage pad separate from the previously segregated pile (Approved Pile). Material dredged from the lagoon has excess water removed via press. Two to three samples are taken per day of the material following water removal and are tested for moisture and Uranium content. Thirty-one radiological samples for Total Uranium were collected throughout the dredging operation from the material that makes up the Operations Pile and are representative of the contents of the pile. The sample results of the Operations Pile are included in Enclosure 1 to this letter. Westinghouse performed a statistical analysis of the results and has concluded that the Uranium content of the Operations Pile is bound by the sample
© 2021 Westinghouse Electric Company LLC All Rights Reserved
WESTINGHOUSE NON-PROPRIETARY CLASS 3 Our ref: LTR-RAC-21-18 February 8, 2021 results of the Approved Pile and, therefore, the analysis of the aggregated waste dose assessment characterized in Reference 2.
Westinghouse is therefore requesting approval to dispose of a portion of the Operations Pile such that, when combined with the CaF2 from the Approved Pile, a total of approximately 50,400 ft3 of CaF2 can be added to the waste material to meet the approved waste aggregation as characterized in section 4.0 of Enclosure 1 to Reference 2. The estimated volume of material required from the Operations pile is 25,900 ft3. This request incorporates by reference and is otherwise bound by the information provided to the NRC in support of Safety Condition S-11 of SNM-1107 as described in Reference 1. Westinghouse requests a decision to this alternate disposal request and exemption by March 15, 2021 to support the planned material transport schedule.
Please contact me at (803) 647-2046 should you have questions or need any additional information.
Elise Malek Elise Malek (Feb 8, 2021 14:50 EST)
Elise Malek Regulatory Affairs Manager Westinghouse Columbia Fuel Fabrication Facility Docket 70-1151 License SNM-1107 Enclosure 1: CaF2 PILE RADIOLOGICAL DATA SET (1 Page) cc:
Mr. Thomas Vukovinsky Mr. David Tiktinsky
WESTINGHOUSE NON-PROPRIETARY CLASS 3 Our ref: LTR-RAC-21-18 February 8, 2021 Enclosure 1 CaF2 PILE RADIOLOGICAL DATA SET Sample results of the Operations Pile of CaF2 material generated following dredging operations in 2020.
Sample # ppmU pCi/g U 1 11.31 31.78 2 11.50 32.32 3 12.30 34.56 4 13.13 36.90 5 13.22 37.15 6 13.75 38.64 7 14.00 39.34 8 15.26 42.88 9 15.30 42.99 10 15.63 43.92 11 17.14 48.16 12 18.23 51.23 13 18.28 51.37 14 18.35 51.56 15 18.60 52.27 16 18.79 52.80 17 20.91 58.76 18 21.15 59.43 19 21.29 59.82 20 21.75 61.12 21 21.82 61.31 22 22.77 63.98 23 23.10 64.91 24 23.82 66.93 25 24.12 67.78 26 24.24 68.11 27 24.49 68.82 28 25.06 70.42 29 26.30 73.90 30 30.51 85.73 31 34.33 96.47 Standard Deviation 5.5 15.4 Mean 19.7 55.3