From:
Holonich, Joseph To:
"Yang Lu"; Steve Yang Cc:
Morey, Dennis; Waters, Michael; Johnston, Jeanne; Stattel, Richard; Zhao, Jack
Subject:
Draft Safety Evaluation for HFC Amendment 4 Date:
Thursday, November 5, 2020 8:45:56 AM Dr. Steve Yang Sr. Vice President HF Controls Corporation 1624 West Crosby Road Suite 124 Carrollton, TX 75006
Dear Dr. Yang;
By letter dated April 15, 2019 (Agencywide Document Access and Management System (ADAMS) Accession No. ML19109A158) HF Controls (HFC) submitted RR901-107-10-PI, Amendment for HFC-FPGA System of HFC-6000 Safety Platform, Revision F. Based on its review of the information submitted in the topical report (TR), the Nuclear Regulatory Commission (NRC) staff finds the TR acceptable for referencing subject to the limitations specified in the TR, and in the NRC safety evaluation (SE).
A copy of the draft SE has been placed in the box.com folder. Mr. Yang Yu of HFC has been given access to the folder. The draft SE is being provided for a proprietary information review. If HFC provides comments on other areas, the NRC staff will exercise its discretion on whether to address those comments.
Pursuant to Section 2.390 of Title 10 of the Code of Federal Regulations (10 CFR), we have determined that the draft SE may contain proprietary information. If you believe that any information in the draft SE is proprietary, please identify such information line-by-line and define the basis pursuant to the criteria of 10 CFR 2.390. Use brackets and yellow highlight to identify any [proprietary information]. After 10 working days, the draft SE will be made publicly available.
Your response must be via a letter from an authorized individual. In addition, please provide an electronic redline/strikeout Word version of the SE either via email or the box.com folder. It helps expedite the NRC staff response to comments if HFC provides in the formal transmittal and in a separate Word file, a table with the following columns; Comment No., PageNo., and Line No., Comment Type (if comments other than proprietary information are provided (i.e., clarity, accuracy)), Suggested Revision, and a blank column NRC Disposition. However, HFC may provide its comments in any format it chooses. The final SE will be issued after making any necessary changes.
Note that at this stage of the process, the NRC staff has completed its review of the submitted information and will not entertain technical arguments. The staff conclusions and conditions will not change unless new information is provided that was not available during our review. If HFC would like to discuss the draft SE in detail, we can do that in a noticed meeting that can be closed if proprietary information will be discussed.
Both this email and the draft SE have been placed in ADAMS and made Official Agency Records. The draft SE is declared as nonpublic because it may contain proprietary
information. This email is declared public.
If you have any questions, please feel free to contact me at 301-415-7297 or by email at jjh1@nrc.gov.
Joseph Holonich, Senior Project Manager Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Docket No.: 99902026 EPID: L-2018-TOP-0031