UNITED STATES NUCLEAR REGULATORY COMMISSION

+++++

STRATEGIC PROGRAMMATIC OVERVIEW OF THE OPERATING REACTORS AND NEW REACTORS BUSINESS LINES AND RESULTS OF THE AGENCY ACTION REVIEW MEETING

+++++

WEDNESDAY, SEPTEMBER 30, 2020

+++++

ROCKVILLE, MARYLAND

+++++

The Commission met in the Commissioners' Hearing Room at the Nuclear Regulatory Commission, One White Flint North, 11555 Rockville Pike, at 9:00 a.m., Kristine L. Svinicki, Chairman, presiding.

COMMISSION MEMBERS:

KRISTINE L. SVINICKI, Chairman JEFF BARAN, Commissioner DAVID A. WRIGHT, Commissioner CHRISTOPHER T. HANSON, Commissioner ALSO PRESENT:

ANNETTE VIETTI-COOK, Secretary of the Commission MARIAN ZOBLER, General Counsel

2 NRC STAFF:

DAN DORMAN, Deputy Executive Director for Reactor and Preparedness Programs HO NIEH, Director, Office of Nuclear Reactor Regulation (NRR)

MAGGIE TOBIN, Senior Resident Inspector, North Anna Power Station, Region II STEPHANIE COFFIN, Deputy Director, Office of Nuclear Regulatory Research SHAUN ANDERSON, Managing Director, EMBARK Venture Studio, NRR KEVIN WILLIAMS, Director, Division of Materials Safety, Security, State, and Tribal Programs, Office of Nuclear Material Safety and Safeguards CHRIS MILLER, Director, Division of Reactor Oversight, Office of Nuclear Reactor Regulation MIKE KING, Director, Vogtle Project Office, Office of Nuclear Reactor Regulation

3 1 PROCEEDINGS 2 9:00 a.m.

3 CHAIRMAN SVINICKI: Well, good morning, everyone, and 4 welcome to the Commission's meeting today.

5 The Commission meets in public session this morning to 6 update on strategic considerations associated with a very large programmatic 7 area here, the operating reactors business line, as well as the new reactor 8 business line, including a highlight on recent activities taken to modernize and 9 improve the nuclear reactor safety program.

10 We will hear from two staff panels. And on these topics, we 11 traditionally would have had a separate meeting for this important reactor 12 safety program, the operating reactors and the new reactors activities.

13 And at a subsequent convening on another day, we would 14 have covered the second panel we will hear from today, which is again the 15 NRC staff, however, the topic is a briefing of the staff to the Commission on 16 this year's annual Agency Action Review Meeting.

17 Which is a very significant undertaking by the NRC staff, 18 looking very broadly at the safety and security performance of the operating 19 reactor fleet and also materials licensees, both looking at trends and things 20 that are happening with Agreement State licensees as well as NRC direct 21 materials licensees.

22 So, both topics are of great importance to the Commission, 23 but we had a period of suspending, in light of the public health emergency, our 24 public meetings as a Commission, so in the interest of kind of coming current

4 1 again and then taking on new topics and reviving our meeting agenda, we've 2 combined these today.

3 But I just wanted to remark upon the fact that it then 4 becomes a rather breathtaking set of activities that are being discussed, that 5 are among, I think, some of the most safety significant undertakings of the 6 NRC staff and the Commission. So, we will have a brief break in-between 7 hearing from each of the staff panels.

8 And very, very appropriately, we will be led off by Mr. Dan 9 Dorman, who is the deputy executive director for Reactor and Preparedness 10 Programs, who has a portfolio on both of these topics.

11 Before we turn to that, I'll just quickly survey and see if any 12 member of the Commission wanted to make any opening remarks? Okay, 13 with that, Dan, we will have you lead off for the first staff presentation. Thank 14 you.

15 MR. DORMAN: Thank you and good morning, Chairman 16 Svinicki and Commissioners.

17 The staff are pleased to be here today to provide a strategic 18 programmatic overview of the operating and new reactor business lines. The 19 staff in these business lines are doing incredible work, which we're proud to 20 be showcasing here today.

21 And as the Chairman indicated, in the second panel, we'll 22 discuss a summary of the results of the Agency Action Review Meeting.

23 The new and operating reactor business lines play key roles 24 in our safety and security mission.

5 1 To take advantage of the natural synergies between these 2 two business lines, at the beginning of this fiscal year we merged the Office of 3 New Reactors, formerly known as NRO, and the Office of Nuclear Reactor 4 Regulation, or NRR, in October of last year. This merger into a single office 5 has strengthened both business lines.

6 The combined office has achieved a great deal since the 7 last strategic programmatic overview of these business lines in 2018, including 8 the issuance of the first subsequent license renewals at two sites, laying the 9 foundation for safety-focused and efficient regulatory reviews of advanced 10 non-light water reactor technologies, including delivering on actions mandated 11 by the Nuclear Energy Innovation and Modernization Act, or NEIMA, and 12 completion of the NuScale small modular reactor design certification review.

13 Next slide, please.

14 During this panel, Ho Nieh, the director of NRR, will talk 15 about these and other accomplishments, as well as the vision and strategic 16 priorities for the nuclear reactor safety program and preparations to regulate 17 the nuclear technology of the future.

18 After Ho, Maggie Tobin, the senior resident inspector at the 19 North Anna site in Virginia in Region II, will provide a boots on the ground 20 perspective on our resident inspectors are maintaining their safety focus in a 21 dynamic environment.

22 The Office of Nuclear Regulatory Research plays a key role 23 in supporting the NRC's safety and security missions, and Stephanie Coffin, 24 the deputy director of research, will provide an overview of how the NRC is

6 1 benefitting from research partnerships with the Department of Energy, 2 international institutions, universities, and others, to better position ourselves 3 to review new nuclear technologies.

4 And finally, Shawn Anderson, the managing director in 5 NRR's EMBARK Venture Studio will discuss EMBARK's role in driving 6 advances within the business lines and building a culture that embraces 7 innovation. The improvements that EMBARK is setting in motion will help us 8 more efficiently carry out our mission and communicate the important work we 9 do with our stakeholders.

10 As discussed during the recent Commission briefings on the 11 agency's response to the COVID-19 public health emergency and on 12 transformation at the NRC, NRC staff have exhibited exemplary dedication 13 and focus while continuing to innovate and transform to execute our important 14 safety and security mission. Next slide, please.

15 This concludes my opening remarks and I'll turn the 16 presentation over to Ho Nieh.

17 MR. NIEH: Good morning, Chairman. Good morning, 18 Commissioners. Thank you, Dan, for the introduction.

19 And so, thank you for the opportunity to brief you on the 20 nuclear reactor safety program and my remarks this morning will focus on the 21 vision for the program, priorities, some recent successes, as well as what 22 we're doing to effectively regulate technologies in the future. May I have the 23 next slide, please?

24 I'd like to first start by acknowledging that all NRC offices

7 1 contribute to the success of this program, both corporate and technical.

2 A prime example of the great teamwork that goes on in this 3 program was evident during our response to the COVID-19 public health 4 emergency, and as Dan mentioned, the Commission was recently briefed on 5 the overall agency response. We had a chance to see what we did in the 6 reactor program in these times here.

7 And as head of NRR, I would like to personally thank the 8 women and men in the NRC regional offices and at headquarters for their 9 continued dedication and support to the program. Next slide, please.

10 As Dan mentioned, in October of 2019, NRR and NRO 11 reunified. And to support that reunification, the combined leadership of both 12 offices aligned on an aspirational vision and sense of purpose. And that 13 vision is, we make safe use of nuclear technology possible.

14 This unifying vision helps us in executing the safety and 15 security mission. The unified vision also helps us lead our people in 16 implementing the principles of good regulation and the NRC values, and it 17 serves as our North Star for our innovation and transformation efforts that 18 support overall agency transformation toward being a modern risk-informed 19 regulator. Can I have the next slide, please?

20 So, now, I'd like to shift to our current priorities, highlight 21 some of our recent successes. And I'd like to start first and foremost to say 22 that we continue to ensure the safety and security of the operating fleet 23 through robust and effective licensing, oversight, and incident response 24 programs.

8 1 And as Dan mentioned, you'll hear more about the results 2 of those programs during the second panel today. And safety and security 3 will always remain at the top of our priority list. Next slide, please.

4 With the reunification of NRR and NRO back in October, we 5 established the Vogtle Project Office. This project office was established to 6 provide focused attention, dedicated resources towards this nationally 7 significant project for the construction of two new AP1000 units at the Vogtle 8 site in Waynesboro, Georgia.

9 The Vogtle Project Office and NRC's Region II Office are 10 working very, very closely to ensure safe construction and commissioning of 11 these two new reactors for the United States.

12 And recently, we provided the Commission with a status 13 memo on an update on our essential licensing and oversight activities. Next 14 slide, please.

15 As Dan noted, in August of this year, the NRC staff 16 completed its review of the NuScale Small Modular Reactor design 17 certification application. And we're really proud of this accomplishment. We 18 believe we performed this review in a risk-informed manner and we did it on 19 schedule, and in fact, slightly ahead of schedule.

20 And as we get more experience in reviewing these new 21 technologies, we're really confident that we're going to be increasing our ability 22 to do risk-informed reviews on time. And this will help demonstrate 23 predictability in our regulatory processes. Next slide, please.

24 As also noted in Dan's opening remarks, this fiscal year, we

9 1 completed our reviews of the first two subsequent license renewal 2 applications. On the left is Turkey Point. On the right is the Peach Bottom 3 Atomic Power Station.

4 And the staff completed these safety-focused reviews 5 centered on the key technical issues to manage the effects of aging and long-6 term operations. And these reviews, again, were also done on schedule.

7 And now, we've made possible the long-term operation of 8 these two plants to support the national critical infrastructure for electricity out 9 to 80 years from the date of initial licensing. Next slide, please.

10 We've been actively working to ensure readiness for 11 licensing and safe deployment of advanced reactors in the United States.

12 As noted, we're implementing the direction in NEIMA, which 13 includes the development of a technology-inclusive and risk-informed 14 regulatory framework. And what we're doing is so-called the Part 53 15 rulemaking, which we presented a plan to the Commission that we 16 recommended be a high priority rulemaking.

17 Back in June of this year, we accepted for review the first 18 advanced non-light water reactor combined license application for the Aurora 19 powerhouse by Oklo, and that review is actively underway.

20 And we're also supporting two nationally significant projects.

21 The first, the DOE's, the Department of Energy's advanced reactor 22 demonstration program, as well as the Department of Defense's micro-23 reactor, Project Pele. Next slide, please.

24 Okay. The nuclear reactor safety program is really on the

10 1 leading edge of supporting the agency's overall efforts to become a modern 2 risk-informed regulator.

3 We've established an innovation accelerator called 4 EMBARK Venture Studio in NRR. And this organization, EMBARK, is really 5 empowering the future of the nuclear reactor safety program through creative 6 and innovative ways to do our mission better.

7 We're increasing our capacity to make better risk-informed 8 decisions by applying the Be riskSMART concept in a lot of what we do.

9 And we're also putting in place tools such as the Very Low 10 Safety Significance Issue Resolution process, which we put in place in 11 January. And this tool now gives our inspectors and our staff a mechanism 12 for transparently and timely dispositioning very low safety significance issues 13 without excessive use of resources.

14 We've also made great strides in developing data tools and 15 applying those tools in our licensing and oversight programs.

16 And during the transformation Commission briefing two 17 weeks ago, NRR's own Reed Anzalone gave you a demonstration of the 18 Mission Analytics Portal and Operation Rango, two really interesting projects 19 tied to our licensing and oversight programs that will help bring data to our 20 staff for improved analytical capability to help us work smarter, as well as 21 working on those external faces for these data projects, to show the external 22 community the value we add and the analytical capabilities we'd like to provide 23 and the data that we have in these programs.

24 And all these efforts in supporting agency transformation will

11 1 really help us focus our regulatory attention on the things that matter the most 2 and also to apply the most modern business tools and data technologies to 3 just help us work smarter. Next slide.

4 My final slide here is to say that we are proactively preparing 5 to regulate technologies of the future. I already mentioned our work in 6 advanced reactors.

7 In addition to that, we've taken our initiative to engage with 8 the Department of Energy's Light Water Reactor Sustainability program for a 9 potential major upgrade of a digital system and an operating nuclear power 10 plant. We are anticipating receipt of a license amendment request sometime 11 in 2021 in this regard.

12 We've also been diligently working with other federal 13 partners and the industry and fuel vendors to support the safe deployment of 14 accident-tolerant fuels in the mid-2020s.

15 And we're engaging with the external stakeholder 16 community on how advanced manufacturing technologies can impact our 17 regulatory programs and processes.

18 So, with that, Madam Chairman and Commissioners, thank 19 you for your attention. I would like to turn the presentation over to Maggie 20 Tobin.

21 MS. TOBIN: Good morning. My name is Maggie Tobin and 22 I'm the senior resident at North Anna Power Station, which is a station in 23 Region II near Richmond, Virginia. Prior to that, I was the resident inspector 24 at Arkansas Nuclear One near Russellville, Arkansas, in Region IV.

12 1 Before I was an inspector, I started my career off in the 2 agency at headquarters in the Office of Research as a reliability and risk 3 engineer. And I've been here for just about ten years. Next slide, please.

4 In this era of change for both our agency and the licensees, 5 it is important to reaffirm to the public, the Commission, and other stakeholders 6 that we, the resident inspectors and the agency's front line, have the focus 7 and dedication to ensure safety and security at our nation's operating nuclear 8 reactors.

9 Resident and regional inspectors execute the NRC mission 10 of ensuring safety and security by monitoring onsite activities. When 11 executing the Reactor Oversight Process, safety and security is our top 12 priority.

13 Since its inception, the ROP has continued to evolve to a 14 changing industry. For example, we have an improved focus on safety 15 culture, and we have added flex inspections to regular baseline inspections.

16 Next slide, please.

17 Even with all of the changes throughout the years, the ROP 18 has facilitated the ability to follow up on safety issues and inspectors will 19 always follow up on these issues.

20 And that's why I'm here today, to assure everyone that 21 within the always changing environment that we live in, the inspectors 22 continue to make risk-informed decisions and continue to have safety and 23 security as the overriding priority.

24 The ROP has increasing levels of oversight that allow for a

13 1 risk-informed and performance-based inspection program and this allows us 2 to always keep our focus on the things of greatest significance and to not lose 3 track of the forest for the trees, so to speak.

4 On the front lines -- next slide, please. On the front lines, 5 we have seen and experienced firsthand some of the recent changes that our 6 regional and headquarters staff are collaborating on to support and sustain 7 the Reactor Oversight Process.

8 For example, the agency periodically reviews the inspection 9 process to sharpen our focus and reduce the amount of overlap between 10 inspections, as well as the Very Low Safety Significance Issue Resolution, or 11 VLSSIR, process.

12 Ho mentioned it briefly as well, but this is a new process for 13 us that addresses issues of very low safety significance that otherwise would 14 require a great deal of research to close out and allows us to maintain our 15 focus.

16 These changes enable the inspectors and the agency to 17 better focus regulatory attention on matters of greater safety significance.

18 However, even with the changes, we continue to adapt while continuing our 19 focus on safety.

20 The Reactor Oversight Process continues to provide the 21 framework for risk-informed performance-based inspection and the dynamic 22 regulatory environment will continue to emphasize safety and facilitate our 23 focus on potentially safety-significant issues. Next slide, please.

24 With these changes, there have also been more tools

14 1 provided to us for better communications with our regional and headquarters 2 office staff that increase the efficiency of our inspection efforts.

3 A couple of examples, we have the table pilot program.

4 Currently, there are a number of inspectors using tablets out in the field. In 5 my opinion, these will provide a great deal of efficiency to our inspectors, 6 because we'll be out in the field and we'll have the information that we need 7 at our fingertips and the ability to take notes and pictures, to identify and 8 address questions in a prompt manner.

9 We also have Skype and now Microsoft Teams, which we 10 use every day to have video calls or group discussions with the Region or 11 Headquarters and it greatly facilitates our communication. This has been 12 especially vital since COVID-19 has many folks working from home, and it was 13 really vital in our process.

14 The Inspection Sample Tracking and Reporting tool, or 15 iSTAR, gives us a platform for more agile inspection report writing and allows 16 for more consistency across sites.

17 And the last thing I'd like to highlight on this slide is near and 18 dear to my heart, due to my background as a reliability and risk engineer in 19 the Office of Research. There are a number of risk tools available from both 20 the NRC and the licensee.

21 For example, the NRC and Idaho National Laboratories 22 have worked together to supply us with valuable tools, such as SAPHIRE, 23 which is the NRC's risk analysis tool, with individualized SPAR models in 24 SAPHIRE of each site.

15 1 As well as the licensee-provided tools, such as EOSP, or 2 the Equipment Out of Service Program, the maintenance rule database, and 3 the Plant Process Computer. All of these combine to give us a balanced and 4 truly risk-informed awareness of plant operations.

5 And all of these new tools combine to allow for some limited 6 remote inspection during the COVID-19 world crisis. We maintain an 7 awareness of what is going on onsite and continue to provide oversight, while 8 minimizing our personal risk. Next slide, please.

9 The value of being onsite, however, cannot be overstated.

10 Just by walking around and being available to talk to licensee employees, we 11 have a positive impact on safety every day.

12 On a daily or near daily basis, as resident inspectors, we 13 read control logs, tour the control room boards, discuss daily activities with 14 OPS personnel, attend licensee status meetings, turnover meetings, and we 15 communicate with the regional office every day to communicate the status of 16 the site.

17 We also use the available risk tools that I discussed earlier 18 to select inspection activities for the day and make risk-informed decisions.

19 Our presence onsite also allows us to learn the site such 20 that in the event we are needed to perform our incident response duties, we 21 understand how the systems should respond and how accidents can progress 22 under any set of hypothetical circumstances.

23 Our presence in the local community helps to reassure the 24 public that we maintain our oversight of the site. I've been called a number

16 1 of times out of the blue by members of the public who were looking to buy a 2 house on the lake, just looking for assurance that the site was being operated 3 safely.

4 The knowledge that not only do I work onsite, but that I also 5 live in the local area and that I have a personal incentive to make sure that the 6 site continues to be operated safely gave them great peace of mind.

7 Just as an aside, the picture on this slide is from when I was 8 at ANO at the Russellville Fall Festival. We set up a booth and borrowed a 9 Geiger counter and some uranium glass and let the local kids play with it. It 10 was a huge hit in the community. Next slide, please.

11 Before I close and hand it off to Stephanie, I'd like to just 12 discuss an example of how an inspector added tremendous value to the 13 program. A friend of mine from Region III, Vance Petrella, identified an issue 14 when inspecting at a site earlier this year.

15 In 2018, the licensee changed the control rod design life 16 from 12 effective full power years to 15 effective full power years and they had 17 been operating beyond the original 12 effective full power years since June 18 2019.

19 During his inspection, Vance noted that some of the key 20 assumptions made to increase the design life of the control rods was that the 21 plant would be operated using what they called baseload operation, which is 22 to say at or close to 100 percent power, except under unusual circumstances.

23 However, since the licensee did not incorporate the 24 restriction into the operating procedures, they did not realize that they were

17 1 outside the bounds of the assumptions when, in late 2019, they began 2 performing flexible power operations, also known as load following, where the 3 unit reduces power to match grid demand.

4 Although, with significant additional analysis, the licensee in 5 this case was able to determine that the control rods remained operable, at 6 the time of discovery, there was a significant amount of concern that the rods 7 would not be capable of meeting their safety function.

8 Vance's example is just of many in the agency that 9 demonstrates the value of inspectors as the agency's boots on the ground.

10 And inspectors will continue to leverage the tools available for oversight 11 success and plant safety and security. And our overriding concern and goal 12 as inspectors has always been and will always be safety.

13 Next, I'll hand it off to Stephanie.

14 MS. COFFIN: Thanks. Thanks, Maggie. Can you hear 15 me okay? All right. Good morning, Chairman and Commissioners. It's an 16 honor and privilege to be here today representing the Office of Research.

17 We're a support organization, we're here to ensure the 18 success of the new and the operating reactor business lines, and we do that 19 by providing deep technical expertise and the analytical tools that allow the 20 program office to achieve its goals.

21 You don't always see us, but we're behind some of those 22 forward-leaning rulemakings, the successful licensing programs, the 23 complicated plant events, the critical certification and licensing decisions.

24 We build on our talent and enhance our capabilities through

18 1 partnerships, because we know that great research does not happen in 2 isolation. And this morning, I'd like to describe some of those partnerships 3 with you. Next slide, please.

4 The first partnership I'd like to talk to today is our partnership 5 with the Department of Energy, which not surprising is our most expensive.

6 We've always had a strong relationship with DOE and the passage of the 7 Nuclear Energy Innovation Capabilities Act has only served to enhance our 8 communication, cooperation, and collaboration.

9 DOE is emphasizing deployment. And so, in response to 10 that, our research has a mantra of Be Ready. We're employing three 11 strategies to that end, and I've listed those here on the left-hand side of the 12 slide.

13 We're engaging DOE, not as a passive listener, but as an 14 active partner. And the term coordinated activities is directly from the 15 memorandum of understanding that we have with DOE under NEICA. And I 16 show some of the programs in which we're engaged on the right-hand part of 17 the slide.

18 For example, Dr. Kimberly Webber of the Office of 19 Research, was part of the analysis of alternatives that led to the design 20 attributes for the Versatile Test Reactor, or VTR.

21 Our participation on the VTR project will bring us experience 22 with the DOE authorization process. They're applying digital engineering 23 concepts in their design and construction processes and they're testing the 24 licensing modernization project.

19 1 And it's not just advanced reactors that are pursuing new 2 technologies. DOE's Light Water Reactor Sustainability program is 3 championing advances to support the current operating fleet in areas such as 4 digital I&C and materials research, to support long-term operations.

5 The second strategy we employ is to identify and close 6 research gaps. Consistent with our be ready mindset, we're successfully 7 completing activities described within the advanced reactor and accident-8 tolerant fuel readiness plans.

9 Our focus is on enhancing our analytical capabilities to 10 support NRR's future review of reactors and fuels. Experimental data needs 11 to exist, and they take time and resources to complete. We work with DOE 12 and others to ensure these data needs are identified, prioritized, and 13 addressed.

14 The experimental data ensures our analytical capabilities 15 have robust verification and validation behind them, without unnecessary 16 conservatisms.

17 The third strategy is deployment of research personnel to 18 national labs. So, this year, research staff are on virtual rotations to Oak 19 Ridge National Lab, to work hand-in-hand with experts there in the area of 20 advanced manufacturing.

21 And we also plan to deploy a research staff member to 22 Idaho National Lab to engage in experiments related to the qualification of 23 advanced fuel designs and extended burnup limits of existing fuel designs.

24 Next slide, please.

20 1 I'm going to turn to some other domestic and international 2 partnerships. I've included on this slide mention of the Phenomena 3 Identification and Ranking Table, or PIRT, process that research facilitates.

4 It's a systematic way of gathering information from experts 5 on a specific concept and ranking the importance of the information in order 6 to meet some decision-making objective. It's been applied in many areas to 7 help guide research or develop regulatory requirements or guidance.

8 We're applying PIRT as part of a readiness plan for 9 accident-tolerant fuels and our partnerships are key to having the best experts 10 participate on the PIRT panel.

11 We've completed a PIRT exercise on chromium-coated 12 cladding -- that's hard to say -- to support development of staff guidance, and 13 just this month, we initiated a PIRT related to accident-tolerant fuel 14 performance under severe accident conditions.

15 An important aspect of being ready for advanced reactors 16 includes the endorsement of key codes and standards. This is strategy four 17 under the advanced reactor readiness plan.

18 Louise Lund of Research is the standards executive for the 19 agency. She had initiated and led discussions with two key standards 20 organizations, American Nuclear Society, ANS, and the American Society of 21 Mechanical Engineers, ASME, to ensure mutual understanding and alignment 22 on industry priorities.

23 A recently achieved milestone in this area was the 24 successful balloting by an ANS and ASME joint committee of its advanced

21 1 non-light water reactor probabilistic risk assessment standard, which received 2 a unanimous affirmative vote. Our engagement will facilitate NRC's formal 3 endorsement of this standard.

4 Internationally, we continue our partnerships across the 5 globe. I would like to call out one of these here, the Framework for IrraDiation 6 ExperimentS, or FIDES. FIDES is sponsored by the Nuclear Energy Agency 7 and is a multinational effort that brings together resources and facilities to 8 conduct irradiation studies of fuels and materials.

9 Research has been a champion of this program as we recognize the 10 importance of having this testing capability, given the shutdown of the Halden 11 Reactor in Norway and the need for experimental data to support advances in 12 fuels and reactor designs. Next slide, please.

13 The last partnership I would like to speak to is our 14 partnerships with institutes of higher learning through the Integrated University 15 Program, or IUP. Since 2009, the IUP has provided scholarships, 16 fellowships, and faculty development grants. Students who receive grants 17 commit to working in the nuclear field upon graduation.

18 What's new for 2020 is our ability to also award mission-19 related research grants. Research at universities is often at the cutting edge 20 and we want to harness that.

21 At this point in time, Research has proposed supporting 22 more than a dozen diverse forward-leaning projects that total over $7 million.

23 We plan to award these grants by the end of the calendar year, with the 24 support of our colleagues in the Office of Administration and the Office of the

22 1 General Counsel.

2 The last point I would like to make on this slide is to talk 3 about our inaugural Nuclear Regulator Apprenticeship Network, or NRAN, 4 cohort. I've included their photos on this slide. The cohort is comprised of 5 23 members, 21 of them were recipients of scholarships received through the 6 IUP. It's a fantastic pipeline of talent for the agency.

7 Thank you again for this opportunity and I will turn the 8 briefing over to Shaun Anderson.

9 MR. ANDERSON: Thank you, Stephanie. Good afternoon, 10 Chairman, Commissioners. Thank you for the opportunity to allow me to be 11 here today.

12 I've been at the agency for approximately 16 years and I've 13 worked in several positions, but EMBARK is truly a great and exciting 14 opportunity for me personally, just to try something totally different in the way 15 that we do business for the nuclear reactor safety program.

16 It's truly a growth opportunity and it's all about getting 17 outside of your personal comfort zones and pushing some personal limits and 18 exploring some of the new possibilities for individuals themselves or for our 19 program. And for that reason, our slides provide a little different look and feel 20 as we move forward.

21 Here at EMBARK, we're supporting the nuclear reactor 22 safety program by optimizing processes, leveraging technology, and 23 advancing the use of data analytics to better inform decision-making.

24 We're partnering with all parts of the agency in driving and

23 1 accelerating change to how we do business and, thus, many of our 2 approaches and changes are being cultivated in other business lines. Next 3 slide, please.

4 EMBARK is an innovation accelerator. We are a small 5 organization with a team of dedicated people who I just cannot thank enough, 6 and we're working to change the minds and culture to allow staff to make real 7 change.

8 Our focus is always on safety first and foremost and we want 9 to make sure we allow staff to spark ideas and new initiatives by removing the 10 barriers, so that we can improve the way that we work.

11 And we're starting to do this at the tactical level. We want 12 to be able to help the staff bring their ideas to the table and be able to work all 13 the opportunities that they have in various aspects. Next slide, please.

14 Within EMBARK, there's no two projects that are alike.

15 Some we lead in its entirety, some we just support, some we partner with other 16 organizations on, and some we just remove the barriers. So, our operating 17 model is to enable, advise, partner, create, and teach. And ultimately, we 18 want staff to -- we want to be able to inspire.

19 We believe that creating a sustained culture of permanent 20 innovation is key to organization agility and by sparking the ideas and inspiring 21 staff to look at old problems in new ways, then we can begin to build innovation 22 and capacity at all levels of the organization.

23 And ultimately, we want to leave each person with the 24 feeling that they tried, they contributed, or they learned from their experience

24 1 to be able to do something similar or even better in the future. And again, 2 this helps us create the ultimate goal of creating a permanent culture of 3 innovation. Next slide, please.

4 So, how are we structured in EMBARK? In EMBARK, we 5 have four departments. We have The Garage, Neurology, NextGen Data, 6 and HASHtagChange. And each of our four departments nicely aligns with 7 our agency's four focus areas under the transformation initiative.

8 And The Garage is our process improvement effort. The 9 Garage is for fine-tuning our infrastructure-like projects, our foundational work, 10 like licensing processes.

11 Neurology is all about the mindset. It's about 12 understanding risk, and not necessarily the capital R risk in terms of PRA, but 13 just approaching the same problem in a different way and trying new 14 approaches to innovation.

15 HASHtagChange, this is about our cultural experience and 16 experience interacting with one another, internally and externally. We want 17 to create a positive culture of innovation, transformation that empowers the 18 staff and considers various stakeholders' perspectives and improves 19 interactions at all levels of the organization.

20 And last, NextGen Data is about embracing the use of data 21 and data analytics by developing tools to monitor and manage how we 22 conduct business. Essentially, expanding the use of data and applying 23 visualizations to help us increase our curiosity.

24 We really just want to make sure we're asking the right

25 1 questions and working ultimately making better informed regulatory decisions.

2 Next slide, please.

3 Here, I just wanted to highlight some of the activities and 4 focus areas that we have been involved in over the last year.

5 For ASME code rulemaking, the team completed a 6 recommendation report for consideration by NRC management and other 7 agency processes for streamlining 10 CFR 50.55a, codes and standards.

8 Ultimately, we want to be more efficient and ensure licensees can promptly 9 utilize NRC's approved codes and the agency is now working on a SECY 10 paper to discuss many of the potential changes.

11 In subsequent license renewal, we partnered with our staff 12 in Division of New and Renewed Licenses and completed a process 13 improvement evaluation for SLRs. The team has identified activities that 14 could be enhanced during the safety review, while maintaining effectiveness, 15 and many of them are planned for implementation this fall.

16 For risk-informed process for evaluations, this process is not 17 about solving a new problem, but it's about sustaining the innovation mindset 18 and leveraging the work and efforts that came before us and taking it just to 19 the next step, ensuring that the resources are adequately applied to issues of 20 more safety significance.

21 And the process doesn't eliminate NRC review, nor does it 22 imply an immediate approval. Rather, it's just a streamlined approach in 23 accordance with the safety significance of the issue and the level of review.

24 Additionally, for COVID-19, it ignited an opportunity for us to

26 1 look into web-based submissions, and most activities that stakeholders 2 interact with the federal government can be done online and there are some 3 capabilities here at the NRC and we're beginning just to scratch that surface.

4 So, we believe there is significantly more that we can do in this area and we 5 can expand upon.

6 And I'm aware that you all had the Mission Analytics Portal 7 was covered at the transformation meeting a couple weeks ago. I just wanted 8 to mention that the MAPX effort focuses on external stakeholder access to 9 more information and data.

10 We want to be able to provide an open and transparent 11 experience for stakeholders that's secure, flexible, and provides a 12 personalized environment to interact with the NRC.

13 And a couple of things I wanted to mention before closing is 14 that, first and foremost, we couldn't have much of this success without the 15 staff. I've got to give a lot of thanks to the teams that worked on many of the 16 projects throughout the year. It's truly their ideas, their time, and their energy 17 that made this happen.

18 And second, many of our initiatives, we are doing a lot more 19 outreach and public meetings on ideas and new approaches before they've 20 been finalized.

21 The idea is to get some stakeholder feedback in a more 22 iterative manner, so that we're trying to be more agile in our approach.

23 However, we'll continue to apply the principles of good regulation by ensuring 24 there's openness and transparency and seek engagement opportunities as

27 1 we continue to move forward.

2 And thank you for your time. And I'll hand it back to Dan.

3 MR. DORMAN: Thank you, Shaun. Next slide, please.

4 So, as you've heard this morning, the staff in the operating and new reactor 5 business lines are innovating and transforming to better regulate the nuclear 6 technologies of today and of the future.

7 We are also working with our domestic and international 8 partners to ensure our independence is not isolated, it's consistent with the 9 Commission's first principle of good regulation. And early engagement and 10 information exchange support staff knowledge that enables timely 11 development of regulatory infrastructure.

12 We are continually seeking ways to improve our regulatory 13 and oversight processes to make them more transparent to the public and 14 more efficient for our applicants and licensees and make us ever more ready 15 for the future, while keeping our focus on safety and security. Next slide, 16 please.

17 Recent circumstances have affirmed for us that, especially 18 in times of change, our most important asset as an agency is our people. As 19 part of our efforts to build a 21st century workforce, we are using strategic 20 workforce planning to better respond to the dynamic environment we work in, 21 helping us to better identify skill gaps and workload trends.

22 A strategic look at the next several years has given us the 23 opportunity to affect change now, to ensure that we have a stable, capable 24 workforce in the years to come. To that end, as Stephanie mentioned, we're

28 1 investing in new generation of nuclear safety leaders through the Nuclear 2 Regulatory Apprenticeship Network, many of whom will assume roles in 3 supporting the operating and new reactor business lines.

4 In addition to hiring new entry level employees, we're 5 making sure that our current workforce continues to have the skills needed to 6 execute our mission through training and development opportunities.

7 I'd like to thank the staff of the NRC again for their hard work 8 and determination in executing our important mission to protect people and 9 the environment.

10 I'd also like to thank you, Chairman Svinicki and 11 Commissioners, for the opportunity to present today the results of the staff's 12 work, and thank all the speakers and all the staff who've contributed to this 13 panel. And with that, we will conclude and take your questions.

14 CHAIRMAN SVINICKI: Thank you, Dan. You've laid out a 15 lot of interesting things in all those very informative presentations. We'll begin 16 the question and answer period today with Commissioner Wright.

17 COMMISSIONER WRIGHT: Thank you, Chairman. So, 18 good morning and thank you so much for your presentations. I would be 19 remiss to not acknowledge all the great work that the staff's been doing and 20 they've accomplished a great deal, despite all the circumstances that we've 21 had to go through here since, we know, March.

22 So, the agency has continued on and they've been working 23 seamlessly through all this global pandemic things and all related to it, and it's 24 just a remarkable testament to their diligence and their expertise and their

29 1 professionalism and their commitment to our mission. So, thank those that 2 are here and those that are listening as well. And especially to the people 3 who we serve too, so that's very important.

4 So, my questions, I'm going to start with Ho, so I'm going to 5 have to turn over here. That's the one thing about this COVID thing, we're 6 spread out.

7 Ho, thank you for your leadership and moving the 8 organization forward and in the right direction, I believe, as a risk-informed 9 regulator. So, it's been about a year now since you issued your memo on 10 how staff who support the nuclear reactor safety program should apply the 11 principles of good regulation in this risk-informed environment.

12 So, could you talk to me on how you've seen the staff 13 embrace this direction in meeting our mission? Just maybe expand upon that 14 a little bit?

15 MR. NIEH: Sure, thank you for the question, Commissioner, 16 and appreciate your acknowledgment of the work that's being done by the 17 staff and the programs.

18 So, since the year, nearly one year we've been together at 19 an office, I really feel that the staff in NRR and the program office and in the 20 regions are embracing the spirit of the direction that we're trying to go as an 21 agency.

22 And maybe just by one example that makes me feel this way 23 is that, recently, we were dealing with a regulatory matter, with one of our 24 licensing activities here. And through the course of the discussion -- this was

30 1 associated with a very significant project for the agency, I won't get into the 2 details of it, but I'll just give you a sense of kind of how the mindset is taking 3 shape within the organization.

4 What I found in this discussion, it was a diverse group of 5 people, all the engineers involved with the activity, the project managers, it 6 involved people from the region as well and in headquarters, and we first 7 focused on what is the safety significance of the issue, right?

8 We aligned on that right away, unanimously, just to figure 9 out, what are we talking about here, in terms of safety? And then, we talked 10 about all the other regulatory components.

11 And just sitting back and observing and listening to the 12 questions that we were asking ourselves, right, what are the relevant 13 regulatory requirements, what are the implications of those requirements, and 14 how compliance is being demonstrated?

15 Also, the questions that came to the table that challenged 16 ourselves, right, are we being inflexible, right, are we being risk-informed in 17 this? And that happened by itself, right?

18 It wasn't top-down, the director of NRR saying, this is what 19 we want to do, it actually happened more from the bottom-up, that 20 conversation happened naturally. To me, it was really focused on the 21 principles of good regulation, we kind of looked through where things were.

22 And I would say this, Commissioner, that what was 23 inspirational for me in that example was that, I hear very often that sometimes 24 transformation is about less regulation, doing less, well, here was a case

31 1 where we actually came out on the other end, where we actually needed 2 something more to be done, right?

3 And we got there on our own. We recognized that was a 4 tough call to make, but we asked all the right questions, the natural instincts 5 kind of kicked in, that the staff really, we challenged ourselves to see if we 6 were really risk-informed and if we were really being inflexible or not. And we 7 ended up in a place that I could stand 100 percent behind that decision that 8 the staff recommends that we take.

9 So, to me, I feel like we're -- those little examples are 10 happening more and more throughout the Office of Nuclear Reactor 11 Regulation and it's really encouraging to kind of see that happen after just the 12 short period of time of us coming together.

13 COMMISSIONER WRIGHT: So, I want to follow up on that, 14 because it's also been about a year since the NRR and NRO merger.

15 And I wanted to get your thoughts on how things are going 16 and maybe whether there are any lessons learned that you've gone through 17 for potential future organizational mergers, should they occur as well. So, if 18 you could help me out a little bit there?

19 MR. NIEH: Yes. So, absolutely, Commissioner. In fact, 20 one individual I really want to thank is Mary Jane Ross-Lee. She was the 21 lead executive in guiding the reunification of NRR and NRO, and just sent me 22 an email, I think late last night, on a lessons learned report from the merger, I 23 just haven't had time to read it, obviously, as I was preparing for this meeting.

24 But I will read that very carefully.

32 1 In terms of how it's going, I think we came together very 2 smoothly. Like, in the presentation that we showed you today, we made 3 some big accomplishments in one year, in the middle of a public health 4 emergency. I think that is just extraordinarily incredible. And, again, that's 5 really all pinned on the staff for their dedication to the mission.

6 From lessons learned, Commissioner, I think the big on 7 that's maybe just an obvious one for most things that you undertake that are 8 significant is communication, right? We were bringing in kind of two different 9 cultures, quite frankly.

10 You had the culture that was established when NRO was 11 formed, circa 2005 time frame, right? And they went off on their own to really 12 embrace the enabling aspect of the renaissance that we were undergoing at 13 that period of time. And they did some incredible things as an office.

14 And NRR, what remained was focused on the licensing and 15 oversight programs and developing our processes and refining them.

16 So, we were kind of bringing these two cultures together and 17 it did require us to take a lot of effort and attention to communicate.

18 And I was reading this book related to objectives and key 19 results that the EDO had all our executives read and it was really interesting 20 because there was one part of the book that talked about something to the 21 effect of if you think you're communicating enough, you're probably not.

22 And what I found with all the activities, especially with 23 change management, we're learning from -- we're taking the feedback very 24 seriously from the Safety Culture and Climate Survey, and one thing it's shown

33 1 us, that we need to communicate better on the reasons why we're doing 2 certain things.

3 So, I think that's probably one of the major lessons learned, 4 is just the communications and focusing on the people with the merger.

5 COMMISSIONER WRIGHT: Well, thank you so much.

6 And I don't want to run out of time, I'm going to move on, because we're not 7 going to get to talk to everybody. But I've got a senior resident here, I need 8 to talk to --

9 MS. TOBIN: Yes, sir.

10 COMMISSIONER WRIGHT: -- a senior.

11 (Laughter.)

12 COMMISSIONER WRIGHT: So, Maggie, it's good to see 13 you, and thank you so much for being here, it's not every day that we get a 14 chance to have those on the front line at sites in Commission meetings here 15 at headquarters.

16 So, I will tell you personally that I miss going to the plants 17 and meeting with the residents and with the seniors, I really learn a lot on 18 those visits, and it just excites me to have you here, because you all do so 19 much for the agency and you are the boots on the ground. You are --

20 MS. TOBIN: Thank you.

21 COMMISSIONER WRIGHT: You are the safety part of this, 22 because you have to practice it every day. So, in addition to what you 23 discussed today, are there other tools that you would like to see maybe 24 introduced or to enhance your risk-informed inspections?

34 1 I believe it, to expand a little bit more, I believe EMBARK 2 has some initiatives and I'd be interested in your thoughts on them, especially 3 since your background as a reliability and risk engineer.

4 MS. TOBIN: I think I have what I need to do the job 5 effectively, but I will also say that folks are very, very helpful. If I need 6 something and I don't have it, the Operating Experience Branch is very, very 7 good at getting me new information on things.

8 So, offhand, I couldn't think of anything that I'm lacking.

9 And if I ever do find something that I'm lacking, there's someone there to help 10 me right away.

11 COMMISSIONER WRIGHT: Okay. Well, thank you for 12 that.

13 MS. TOBIN: Thank you.

14 COMMISSIONER WRIGHT: And I, just my family, I have a 15 son who's out in Arkansas and I did visit ANO and had a great time out there, 16 and he uses his boat in that lake out there, so I know exactly what you're 17 talking about. So, thank you.

18 Shaun, good to see you. And thank you for your 19 presentation. I've always, and I'm a big fan, as you know, and hear great 20 things about the innovative tools that you and EMBARK are producing.

21 Can you highlight one or two tools that might be in 22 development to maybe make a person's life, a senior resident or a senior 23 resident's job, like Maggie's, more effective and maybe --

24 MR. ANDERSON: Yes. Actually, one of the first tools,

35 1 we're working with the Operating Experience Branch, they're developing a lot 2 more tools, that actually have been rolled out to many of the regions already, 3 that looks at some of the more safety-significant components, to help refine 4 and look at which inspections they should be focusing, which components they 5 should be focusing their inspections on.

6 And actually, that's with the collaboration with the Office of 7 Research, looking at their models to make sure that it's all in one nice succinct 8 tool and any inspectors within the network can actually access this and look 9 at their specific plan and their models.

10 We're also working with some other tools, looking at 11 machine learning, again partnering with Research and OpE organizations.

12 But we want to take, for example, the industry reports that 13 they provide on a periodic basis and just look at the information, the forms that 14 they're reporting on and having that readily available into a nice condensed 15 form for residents or even the regional staff, so they don't have to go mining 16 for that type of information and they can even parse it down by system. So, 17 that's one of the things that's in the works.

18 COMMISSIONER WRIGHT: Thank you so much. I'm over 19 time. Thanks.

20 CHAIRMAN SVINICKI: All right, thank you very much.

21 Next, we'll hear from Commissioner Hanson. Please proceed.

22 COMMISSIONER HANSON: Thank you, Chairman 23 Svinicki. Good morning, everybody. I wanted to take a few minutes here at 24 the beginning of my remarks to recognize somebody that I've seen a number

36 1 of times in the slides and on posters and public affairs postings.

2 She appears no less than 12 times in the slides this 3 morning, particularly with closeups on pages 17 and 57, for those of you who 4 are following along. Her name is Courtney St. Peters. She is the new 5 resident inspector at Palisades Nuclear Power Plant in Southwest Michigan.

6 I talked to her yesterday. She's shown up in a number of 7 cases on LinkedIn posts and Facebook, there was even an annotated one.

8 You can always pick her out, she's wearing a bright shirt, usually pink or 9 flowers or something.

10 She's got her hard hat, her flashlight, she's on the job, 11 conducting onsite inspections at the plant there in Michigan. And I had a 12 great conversation with her.

13 She's actually been with the NRC since 2010. She did a 14 summer internship program and then was part of the coop program going into 15 her senior year at Missouri University of Science and Technology, and then 16 joined the NRC immediately afterwards.

17 Started in what was then NRO, working on small modular 18 reactors. Gravitated towards seismic PRAs, as part of the near-term task 19 force on Fukushima, did a great job there. But recognized the emphasis on 20 field experience in the NRC and wanted to pursue some of that.

21 And so, when a position came open in 2018 in Region III, 22 she moved out there, hoping actually to land a resident inspector position 23 eventually, and she did. She was also, I think, trying to get back to the 24 Midwest a little bit, to be closer to family and the Midwest just being a good

37 1 place, which in my book just shows her sound judgment.

2 (Laughter.)

3 COMMISSIONER HANSON: But she's found the work 4 challenging. She started in the middle of the pandemic, I mean, her first day 5 at Palisades was in May, and I tend to pay attention to announcements out of 6 Region III and had kind of picked up on that.

7 But she said it's going well. She's really enjoyed working 8 with Paul LaFlamme, who's the senior resident inspector there. And he's 9 been giving her hard samples to work with, as she said. And so, it's been 10 challenging, but she really enjoys it.

11 And I wanted to kind of recognize, I know I've joked 12 occasionally that coming on and being sworn in in the middle of the pandemic, 13 I was a little bit of a poster child, not compared to Courtney. Courtney, at this 14 point, is the true poster child, literally appearing on posters.

15 And she said she was a little bit chagrined and 16 embarrassed, right? She's, like a lot of people, she's an introvert, but she's 17 kind of embraced this role and recognized that she's gone viral and I think has 18 embraced this with an enormous amount of good humor.

19 So, as the real poster child, and really for the 20 professionalism and dedication of the staff and really jumping in and being 21 adaptable, I wanted to recognize Courtney.

22 And, I guess, kind of teeing off of that, my initial question is 23 for Maggie. I'm going to take advantage of the fact that we have a senior 24 resident inspector here, too.

38 1 (Laughter.)

2 COMMISSIONER HANSON: What would you tell, whether 3 NRAN folks or other folks early in their career, about why they should consider 4 a resident inspector role? And what made you decide to pursue this after, as 5 you said, spending a number of years in the Office of Research? And what 6 do you like most about the job and kind of what are the most challenging 7 aspects for you?

8 MS. TOBIN: Yes, this job is amazing, it's my favorite job I've 9 ever had, absolutely.

10 (Laughter.)

11 MS. TOBIN: It's so much fun. If you get bored with your 12 computer, you put your hard hat on and you go crawl around and try your very 13 best to get lost in the bowels of the building. I mean, it's great.

14 So, I really love that you do something new every day. If 15 you get bored with something, you go do something else. You have the 16 ability to set your own schedule and, within the risk of what's going on onsite, 17 do what you feel is most important every day.

18 And I really -- so, I was the only person onsite once with a 19 partial loss of offsite power. And it took about 30 seconds to realize that the 20 sound that I was hearing was the safeties going off before I went to the control 21 room and I -- it remains, I mean, it's never a good day when you have 22 something unusual going on onsite, but it remains one of my favorite days I've 23 ever had, because I felt like I was doing real good, I was providing real benefit, 24 and I was seeing the reason that we're there live and in-person.

39 1 And so, I would absolutely recommend a tour as a resident 2 or senior resident, even if you don't want to make it a career, going out, doing 3 a few years before coming back to headquarters, it teaches you so much 4 about why we do what we do.

5 Sometimes you lose track of why we're doing what we're 6 doing at headquarters. Being in the field teaches you that. And so, I would 7 recommend to everyone, absolutely, they should go out and do the inspection 8 job.

9 COMMISSIONER HANSON: Great. Thank you very, very 10 much for that, I really appreciate it.

11 Question for Stephanie. You had hit on a number of 12 coordinated activities and ongoing efforts with the Department of Energy.

13 Could you just talk a little bit, in a little bit more detail, particularly about the 14 modeling and simulation work at DOE and how that's feeding into the work 15 that we're doing here at NRC?

16 And how have we kind of jointly established some of the 17 knowledge base to come out of the, say, the CASL initiative on Oak Ridge, on 18 really simulating the internals of reactors? And what the plans are for 19 coordination going forward on some of that work?

20 MS. COFFIN: Okay. So, this is just -- that's a lot.

21 COMMISSIONER HANSON: Oh, sorry.

22 (Laughter.)

23 MS. COFFIN: So, that's a lot, but I will do my best to talk a 24 little bit about it. So, I think it's really important to know that -- let me take my

40 1 glasses off so I can see -- that there's this really incredible partnership 2 between DOE and NRC with respect to the codes.

3 And if you ask me to go -- there's not like here's the NRC 4 codes, here's the DOE codes, and never the two shall meet. We've 5 completely obliterated that kind of mentality.

6 And so, we are in constant communication with our DOE 7 colleagues and using their codes, when it's appropriate to use their codes, 8 testing our codes against their codes, pushing them to add information to their 9 -- we tend to use DOE's data as opposed to creating our own data, they really 10 have the database that we pull into our codes to use.

11 We want to -- they've made great strides, in terms of they 12 train us, they've been very, very generous with their resources in training us.

13 Some of their capabilities, with like MOOSE, and the ability that that's going 14 to bring, in terms of integrating our codes more, so that they sync more 15 seamlessly, talk to one another, and there's not this kind of a manual 16 movement from the fuel code to the thermohydraulic code to the accident 17 code.

18 We're working to make that more seamless and integrated.

19 And the expertise that they share with us and support us in that way is just 20 really -- and I like to think that we're helping make their codes better, too.

21 We do benchmarking against each other, and you'll find 22 differences when you do benchmarks. And so, you really pursue those 23 differences and you try to understand, are your assumptions different? Why 24 did you get the different answer? And chasing that down just makes

41 1 everything work better.

2 COMMISSIONER HANSON: So, are NRC staff, then -- so, 3 some of this work is going on at Oak Ridge, some of it's going on at Idaho, 4 and so forth. So, are NRC staff going there and interacting with the --

5 MS. COFFIN: Virtually --

6 COMMISSIONER HANSON: -- in detail on the model?

7 MS. COFFIN: -- at this point in time --

8 COMMISSIONER HANSON: Yes, virtually, of course.

9 MS. COFFIN: Yes.

10 COMMISSIONER HANSON: Yes.

11 MS. COFFIN: Yes.

12 COMMISSIONER HANSON: Okay. All right. Thank you.

13 MS. COFFIN: Okay.

14 COMMISSIONER HANSON: That's all I have. Thank you, 15 Chair.

16 CHAIRMAN SVINICKI: Okay. Well, thank you all once 17 again for really wonderful presentations today, and like I said, you've laid down 18 a lot of different topics.

19 I wanted to turn to one that was mentioned somewhat in 20 passing, but has been a significant and very long journey for the NRC, and 21 that's licensing and oversight approaches to the greater adoption of digital I&C 22 at regulated facilities.

23 It feels like one of my very first meetings in 2008 on the 24 Commission was about this, so when I say long journey and it's even longer

42 1 than my personal voyage on it.

2 Maybe, Ho and Stephanie, if you want to divide that up a 3 little bit, if you were talking about kind of what you see in the very near-term, 4 what would you point to as the kind of progress we've made over maybe the 5 last 18 to 24 months?

6 And I think that my understanding is in terms of concrete 7 licensee willingness for someone to embark on a significant licensing activity 8 with us, we're seeing perhaps some willing, I was going to say victims, I'll say 9 volunteers, to proceed in that process?

10 Ho, do you want to kick it off? And then, Stephanie? I 11 know that this is a lot of really mutuality between NRR and Research.

12 MR. NIEH: Sure, thank you for the question, Chairman.

13 And in relationship to the long journey, I remember the first opportunity I had 14 too, to brief this Commission on digital I&C. I think I used the word odyssey 15 in studying the record of where we've been.

16 But that was in October of 2018. And the last time I 17 appeared before the Commission was in May of 2019. And we had made 18 steady progress in developing the regulatory infrastructure, in terms of our 19 guidance documents to help enable more wider use of digital technologies in 20 nuclear power plants.

21 Most recently, we've reached finally the last throws of 22 putting in place the regulatory guidance to apply the 50.59 process to digital 23 upgrades for non-reactor protection system and non-engineered safeguard 24 feature systems in nuclear power plants. So, we're almost done with that.

43 1 We're working towards the completion of Branch Technical 2 Position 7-19 to address common-cause failures in digital control systems.

3 Again, working through the final resolution of the comments there.

4 And as noted to the Commission previously, we had put in 5 place a new review process, Interim Staff Guidance 06 Rev 2, I think toward 6 the end of 2019, that provides a more streamlined approach for major digital 7 upgrades.

8 So, we've laid a lot of groundwork, Chairman, and it's time 9 to be tested at this point. This is why we took that initiative to engage with 10 the Department of Energy's Light Water Reactor Sustainability program, 11 coupled with the things that we're doing, as Shaun mentioned, in terms of 12 creating the risk-informed mindset of how we want to go about our work.

13 And the vision that we had in creating this pilot review 14 project through the LWRS, the Department of Energy Light Water Reactor 15 Sustainability program was we want to treat this as a huge project, right?

16 This could be a gateway regulatory review that would really kind of open the 17 doors for us to gain more experience and do more of these things.

18 So, we really need to be tested in applying these new 19 processes. So, as I mentioned in my remarks, we are expecting a license 20 amendment application sometime in 2021 for a major digital upgrade and we 21 do hope to be able to partner -- in fact, Ray Furstenau and I had a periodic 22 meeting recently, and he's the director of Research.

23 And he talked about some of the things that he's working on 24 to help kind of bring some experience from outside of the NRC, again to kind

44 1 of better inform us of how we can get through some of these regulatory 2 reviews. But I do feel confident that our team is ready to receive that.

3 CHAIRMAN SVINICKI: Great. And speaking of our 4 director of Research Ray, Stephanie, please take it away as the deputy in that 5 office.

6 MS. COFFIN: So, I'll just build a little bit on what Ho talked 7 about. So, the Research staff has helped NRR in terms of the development 8 of that guidance that Ho mentioned. And of course, we own the process for 9 issuing RISs and regulatory guides, so we certainly helped in that respect.

10 In terms of actual research activities, we are focused on 11 common-cause failure, because that seems to be the big area of concern.

12 And so, we're conduct research activities in that regard.

13 And then, the other thing that Ho touched on, but just to 14 bring a little bit more specificity to it, is there's -- we think it might be very, in 15 terms of reaching out to our international counterparts who have processed 16 digital I&C upgrades into their nuclear facilities, is actually bringing a subject 17 matter expert from one or more of those countries to the NRC for some period 18 of time, maybe timing it with the pilot that's coming in next year, to really help 19 us understand how they approached it, what kind of hurdles did they face, and 20 how did they overcome them?

21 CHAIRMAN SVINICKI: Well, thanks for that. And again, in 22 one of the meetings in my early time on the Commission, we talked about 23 digital I&C, and at that time, a lot of us were remarking on the obsolescence 24 issues for the regulated facilities and the inability to acquire some of the

45 1 needed components.

2 And I imagine, since that was 12 years ago, it's not gotten 3 any better, in terms of supply chain. So, I appreciate the staff's sustained 4 focus on this.

5 And, Stephanie, while I have you, you had mentioned the 6 importance of working on codes and standards, I just, for my own curiosity, 7 how have codes and standards committees been impacted by the public 8 health emergency? Have they pretty much gone virtual, but kept current with 9 the meetings and convenings that they need to have?

10 MS. COFFIN: You're exactly correct, they moved to virtually.

11 In some respects, we always find these silver linings, in the COVID-19, and 12 what's kind of nice about the codes and standard meeting going virtual is that 13 it allows other people to participate that might not normally be able to 14 participate. And so, there's a little bonus to having that, besides the savings 15 and travel time.

16 CHAIRMAN SVINICKI: And --

17 MS. COFFIN: But they've continued unabated.

18 CHAIRMAN SVINICKI: And I assume that's true also about 19 the kind of virtual deployments or rotations of staff to Oak Ridge and Idaho in 20 building some of the competencies around the very different types of reactors 21 that might be developed.

22 That might have been too disruptive pre-COVID to say I'm 23 going to move to Tennessee for a year, but now, if it's virtual, maybe we're 24 able to tap into that a bit more.

46 1 MS. COFFIN: Yes. And the same for our meetings with our 2 international colleagues, you're able to just bring in a few more people 3 because of that. And so, there's some really good knowledge management 4 that's going on, taking advantage of that.

5 CHAIRMAN SVINICKI: Great, thank you. Dan, you did 6 touch upon strategic workforce planning in your summary towards the end of 7 this panel.

8 Beyond NRAN, could you talk about whether or not NRC is 9 using the analytics and information we're getting out of strategic workforce 10 planning, which has been going on for some time now? Specifically, to 11 targeted mid-career hires, could you talk, are we doing that and if so, could 12 you say a little bit about it?

13 MR. DORMAN: Yes. So, strategic workforce planning has 14 been under development and implementation for several years now, starting 15 with pilots in one of the regions and several headquarters offices, I think in 16 2018, if I recall correctly.

17 And so, at this point, it's being applied across the enterprise.

18 And through that process, we take a look out about five years at what we 19 anticipate the work to be and, therefore, what are the critical skills that we 20 need to accomplish that work?, and a rough sense of how many of those we 21 need and identify where the gaps are.

22 And so, that's being used as we look at openings in the staff 23 and opportunities to cross-train staff into perhaps areas that are still tied to 24 their core, whether it's civil or mechanical or electrical, but maybe give them a

47 1 new skill that the agency's going to need going forward.

2 So, we are definitely look at that. We have, over the past 3 year, had significantly more hiring across the enterprise. A significant 4 component of that is the NRAN program, to start bringing in new hires, entry 5 level hires.

6 But that doesn't fill all of the needs that we have in the 7 strategic plan. So, mid-level and cross-training is definitely a key component.

8 CHAIRMAN SVINICKI: Okay, great. Thank you very much 9 for that.

10 And I'll just turn to Shaun for a moment, thank you for your 11 presentation. In the next panel, as I mentioned in the opening, we'll hear the 12 results of the staff's Agency Action Review Meeting that they conduct.

13 Part of that is not just looking at the events that occurred 14 over the course of the year, but the agency also commits to and undertakes 15 very significant assessments of the programmatic effectiveness of what we're 16 doing under the ROP. And we'll hear from Mr. King about construction 17 oversight as well.

18 Are the tools and analytics that EMBARK has worked to 19 develop, do you understand them to play a role in making those assessments 20 even more informed than they have been historically?

21 MR. ANDERSON: Yes, I do think the tools that are at least 22 currently available are definitely helpful to help inform the assessments or the 23 answers that needs to be made by the organizations.

24 Just wanted to highlight for the oversight program, we're

48 1 definitely -- we have a team that's been put together that includes two senior 2 residents and a resident inspector that was just established last week to take 3 a more focused and deliberate look into how we can improve some of the data 4 and tools that we need to help our over oversight program.

5 So, that's something, to answer your question, yes, we do 6 have some tools and we're helping to develop more tools to help that program.

7 CHAIRMAN SVINICKI: Okay, thank you. And thank you all 8 for your presentations again. And now, we will turn to Commissioner Baran.

9 COMMISSIONER BARAN: Thanks. Well, thank you for 10 your presentations. I feel like it's just perfect continuity between the end of 11 the Chairman's remarks and mine, with the thanking for presentations. But I 12 know there's always a lot to cover with the reactor business lines.

13 Maggie, great to see you again, I think maybe the last time 14 I saw you was at ANO, when you were a resident there, and it's great to have 15 a senior resident inspector perspective at this meeting.

16 And I was hoping to ask you a few questions, to start off at 17 least, about how things are going with the pandemic. I know that, for the first 18 few months of the pandemic, residents weren't onsite as often as usual.

19 What's that look like now? How often are you and your resident onsite these 20 days?

21 MS. TOBIN: Yes. So, my resident was recently selected 22 as a permanent senior resident at Beaver Valley, Gwynne. So, I'm providing 23 most of the site coverage solo, with a few weeks here and there as folks from 24 the region are able to come out and help.

49 1 So, it's mostly just me. Under normal circumstances, I'd 2 say I'd average two to three days a week onsite. But since I'm currently in a 3 refueling outage, that number is closer to six or seven days a week onsite.

4 (Laughter.)

5 MS. TOBIN: But I do want to stress that that's my decision, 6 no one like told me I had to go do that. My comfort level with the number of 7 cases in the local area and how strict the site is with masks made me 8 personally comfortable with doing that.

9 COMMISSIONER BARAN: Have the activities you conduct 10 when you're onsite changed much compared to before the pandemic?

11 MS. TOBIN: I'd say that our time onsite has become more 12 focused, I have a more defined schedule for what I'm doing and more task-13 oriented, I'm going to go out in the field, I'm going to see this, this, this, and 14 this, and then I'm going to be done with it.

15 So, I tend to try to make it count when I'm onsite and 16 maximize the time in field conducting walkdowns, making sure I'm talking to 17 as many people as I can, things like that.

18 COMMISSIONER BARAN: Yes, and that's, I wanted to ask 19 you about that. In terms of, to the extent you have or you had or you currently 20 have a little less time onsite, you're more focused. What do you see as the 21 highest priorities? Where do you think the agency kind of gets the biggest 22 bang for its buck with your time when you're onsite?

23 MS. TOBIN: I think that plant status is the biggest bang for 24 the buck, rather than strictly inspections. Walking around the plant, touring

50 1 all the areas, making sure we understand what's going on everywhere onsite.

2 I really think that that is where our -- when you have a very 3 limited amount of time onsite, that is what I have been focusing on, with, like, 4 inspections as available, but really focusing on making sure I understand 5 what's actually happening onsite and that I'm not missing something by doing 6 paperwork reviews or status via plant computer, things like that.

7 COMMISSIONER BARAN: In your presentation, you 8 mentioned conducting some limited remote inspections. Based on your 9 experience, which inspections work well remotely and which ones can't be 10 done as effectively from a distance?

11 MS. TOBIN: I think that a lot of samples can be done at least 12 partially remotely. You always have to review paperwork as part of the 13 sample, so even after you're out in the field, when you come back, there's still 14 paperwork. So, I would say that most samples can be done partially 15 remotely.

16 For example, you go out in the field, you watch them do the 17 surveillance or PMT or whatever it is that they're testing onsite, and then you 18 get the completed paperwork and make sure that the paperwork has been 19 filled out properly.

20 So, the paperwork part, I think for almost every sample can 21 be done offsite. And that way, you also maximize your time onsite with in the 22 field rather than sitting at your computer kind of work.

23 COMMISSIONER BARAN: You talked a little bit about the 24 value of having an onsite NRC presence. Tell us more about that, what do

51 1 you see as the main benefit of having inspectors present onsite?

2 MS. TOBIN: I think it kind of goes hand-in-hand with my 3 belief that our most important thing is plant status and making sure we 4 understand it. I think the biggest benefit of having an inspector onsite is to 5 just be present.

6 Knowing the operators, knowing the maintenance crews, 7 knowing the folks who are onsite, and really getting to know the culture of the 8 plant, strengths, weaknesses, where they're working to improve, is really 9 important, especially in the event that we're called on to perform our incident 10 response duties. That's the most important piece, I think.

11 Having the ability to have someone there responding to the 12 site gives the NRC and the public confidence. I think that's an important 13 piece of it too, that we understand what's going on, we're not missing things.

14 I'll also add that it's important to have touchpoints onsite for 15 things like allegations and Safety Conscious Work Environment concerns, to 16 make sure that if someone is having a problem, they know that we're there 17 and that we can help.

18 So, actually, when COVID started and we started limiting 19 our time onsite, I put a note on the door that said, call my cell phone if you 20 need me. I haven't gotten any calls, but it's there so that folks at least know 21 that even though I'm not onsite, I'm still available 24/7 if anyone needs to call 22 me for an allegation or something.

23 COMMISSIONER BARAN: Great. Thanks so much, I 24 appreciate hearing your thoughts on that.

52 1 Ho, I had a few questions about a couple of ongoing staff 2 working groups. One of them has been reviewing the Problem Identification 3 and Resolution inspection, PI&R. This is, of course, a critical inspection that 4 evaluates the adequacy of a nuclear power plant's Corrective Action Program, 5 and it's the only baseline NRC inspection that looks at a plant's safety culture.

6 What's the status of the PI&R working group and what is it 7 finding and recommending?

8 MR. NIEH: Okay, thank you, Commissioner. So, the PI&R 9 working group, as noted in SECY 19-0067, we had committed to do a holistic 10 review of the Problem Identification and Resolution set of inspections, which, 11 as you point out, are a very important core set of inspections that we perform.

12 So, the working group has evaluated how the inspections 13 are being performed in the regions, in terms of identifying areas for potential 14 improvements to the program. And they're in the process of documenting the 15 results of their work. And they've provided that to the regions for comments.

16 So, it's going through an internal review process, and I do 17 expect to receive a document from the working group in the very near future, 18 actually, that we will make publicly available, that will contain the 19 recommendations of what this group thinks could be considered in terms of 20 improving how that inspection program is implemented.

21 COMMISSIONER BARAN: Okay. And there's a separate 22 staff working group looking at the Cross-Cutting Issues Program. How is that 23 effort coming along and do we have a sense at this point what they're finding 24 and what they're going to be recommending?

53 1 MR. NIEH: Similarly, just like the Problem Identification and 2 Resolution working group, they're developing their recommendations, again, 3 to transmit to me and NRR, and then, we'll make that publicly available.

4 And their group and what they've gone to look at was really 5 the effectiveness of this Cross-Cutting Issues Program, right? It has two 6 objectives. One is to inform the licensee of potentially declining performance 7 in the cross-cutting areas. And then, the second is to encourage them to do 8 something about it.

9 So, what this group has found, the program is generally 10 effective. We can kind of look at some potential adjustments to the program 11 to look at how sensitive it is to changes in the cross-cutting areas.

12 So, I do look forward, Commissioner, to receiving both of 13 those reports. They will get a very thorough, objective review and if there are 14 things that we'll implement, we'll do that in a very transparent way and we'll 15 have the meetings with the industry as well as other external stakeholders on 16 that.

17 COMMISSIONER BARAN: Great. Thanks for the update, 18 Ho. That's all I had, Chairman.

19 CHAIRMAN SVINICKI: Okay. Thank you very much. By 20 our schedule, we were going to be gracious to ourselves and allow ourselves 21 a little five-minute break before hearing on the next staff topic. So, we will 22 reconvene at 10:20. Thank you.

23 (Whereupon, the above-entitled matter went off the record 24 at 10:16 a.m. and resumed at 10:23 a.m.)

54 1 CHAIRMAN SVINICKI: All right. Well, thank you, 2 everyone. We will now reconvene to hear a presentation from the NRC staff 3 on the Agency Action Review Meeting, and we will be led off once again by 4 Dan Dorman. Dan, please take it away.

5 MR. DORMAN: Thank you, Chairman, and good morning 6 again, Chairman and Commissioners. During this panel, as the Chairman 7 said, we will discuss the results of the Agency Action Review Meeting, which 8 was conducted on May 6 of this year. Next slide, please.

9 In the Agency Action Review Meeting, senior agency 10 management from the Office of the Executive Director of Operations, the 11 program offices, and the four regions participated in bringing together a broad 12 collection of knowledge and experience regarding NRC's performance during 13 2019.

14 This year, no operating reactor, construction reactor, or 15 materials licensee met the threshold for discussion at the AARM. So, the 16 AARM this year offered a unique opportunity for the senior leadership of the 17 agency to focus and reflect on the effectiveness of our oversight programs, 18 including any potential areas for improvement.

19 Overall, the AARM participants confirmed that the agency's 20 oversight programs continue to be effective, continue to demand a 21 comprehensive inspection and/or evaluation process, and continue to apply 22 appropriate resources to the most risk-significant issues.

23 Additionally, keeping in mind that continuous improvement 24 is an essential aspect of our oversight programs, the AARM participants

55 1 critically evaluated a number of changes that have been made to these 2 programs in recent years.

3 For example, given the downward trend in ROP inspection 4 findings since 2015, AARM participants discussed the adjustments to the ROP 5 that may have impacted this trend. We confirmed that the inspection 6 program and inspectors' ability to assess licensee performance remains 7 robust and effective.

8 AARM participants also discussed and evaluated changes 9 in the Nuclear Materials and Waste Safety Program, such as implementation 10 of an innovative and risk-informed evolution of evaluation of the Nuclear 11 Material Users Licensing and Inspection Program.

12 While you recently received a briefing on the agency's 13 actions during the COVID public health emergency, and while the focus of this 14 briefing is on the agency's oversight program for 2019, I did want to take a 15 moment to note that the staff continues to monitor the progress of our 16 oversight programs in 2020, to ensure that the right guidance is in place to 17 keep our staff safe, while accomplishing our safety and security mission.

18 The headquarters, program offices, and regions are 19 partnering to mitigate COVID-19 public health emergency impacts to the 20 materials and reactor inspections, providing for remote inspections where 21 appropriate.

22 We also continue to monitor ROP baseline inspection 23 completion and as of Monday of this week, 79 percent of the scheduled 24 minimum baseline inspections for calendar year 2020 have been completed.

56 1 Nuclear materials inspections continue as well, with 2 activities being completed onsite, remotely, or remotely with onsite follow-up, 3 as appropriate.

4 Staff continues to adapt their inspection processes within 5 the framework of the applicable inspection manual chapters, to implement the 6 Nuclear Materials and Waste Safety Program's inspection oversight program.

7 Next slide, please.

8 With me here today to talk in more detail about these 9 agenda items, we have Kevin Williams, the director of the Division of Materials 10 Safety, Security, State, and Tribal Programs, in the Office of Nuclear Material 11 Safety and Safeguards. Kevin will be presenting on the 2019 Nuclear 12 Materials and Waste Safety Program performance and trend analysis.

13 Directly behind me, Chris Miller, the director of the Division 14 of Reactor Oversight, will be presenting on the 2019 ROP self-assessment 15 program results and trends in inspection findings.

16 And Mike King, the director of the Vogtle Project Office in 17 the Office of Nuclear Reactor Regulation will be presenting on the 2019 18 construction Reactor Oversight Process self-assessment results and will 19 provide an update on the inspection progress and lessons learned for Vogtle 20 Units 3 and 4 as they near construction completion.

21 Now, I will turn the discussion over to Kevin Williams.

22 MR. WILLIAMS: Thank you, Dan. Good morning, 23 Chairman and Commissioners. As previously stated, my name is Kevin 24 Williams and I am the director of MSSST.

57 1 I will be highlighting strategic goals and performance 2 measures, nuclear material and fuel cycle events, abnormal occurrences, and 3 programmatic innovations in the Nuclear Materials and Waste Safety 4 Program. A written summary of the complete annual assessment has been 5 issued in SECY 20-0036.

6 The Nuclear Materials and Waste Safety Programs include 7 a large number of licensees performing a wide variety of activities, involving 8 industrial, academic, medical uses of radioactive material, as well as fuel cycle 9 licensees. Next slide.

10 The evaluation process is ongoing and includes 11 identification of operational performance trends, significant licensee 12 performance issues, and NRC program issues warranting management 13 awareness. We also look at policy and processes to evaluate the need to 14 enhance the programmatic elements, based upon performance and generic 15 issues.

16 For fiscal year 2019, there were no nuclear materials 17 licensees that met the significant performance issue criteria. Next slide.

18 The staff focused on verification and validation of data 19 generated by the NRC and the Agreement States to determine the impact on 20 strategic outcomes and performance measures related to nuclear materials 21 events.

22 While the agency met its performance goals, there were two 23 areas related to safety and security that I'd like to highlight.

24 The event related to safety involved an internal radiation

58 1 exposure to a licensee's employee who was attempting to clean up a small, 2 rusty area of contamination. The licensee attributed the overexposure to 3 inadequate procedures, poor emergency training, and the failure of a high 4 efficiency particulate air vacuum.

5 As a result, the licensee revised its radiation protection and 6 emergency procedures. This event did not exceed the NRC's performance 7 goal, which is less than or equal to three abnormal occurrences.

8 The event related to security involved the theft of three 9 industrial radiography cameras by a licensee's employee. The devices were 10 recovered, and the licensee upgraded its access security measures to prevent 11 a single authorized individual from removing the devices.

12 This did exceed the goal of zero occurrences. The NMSS 13 staff does not think this event is indicative of a deficiency in requirements, nor 14 is it a programmatic issue. Next slide.

15 The figure on the left of this slide shows the total number of 16 nuclear materials events for each of the last ten years. The light blue bars 17 are the total number of NRC events for each year and the dark blue bars are 18 the total number of Agreement States events.

19 For reference, the Agreement States provide oversight for 20 approximately 88 percent of materials licensees.

21 The evaluation of the data over the last ten years includes a 22 statistically significant decrease in the overall number of NRC-regulated 23 events. This trend is consistent with the decreasing number of NRC 24 licensees, as the number of Agreement States increase. In addition, we

59 1 continue to share operating experience with the goal of decreasing the number 2 of events.

3 In relation to fuel cycle, the figure on the right of this slide 4 shows the total number of fuel cycle operating events over the last five years.

5 The total number has varied, with an average around eight per year, with a 6 total of nine for 2019. The nine events were distributed among criticality 7 safety, operational safety, and materials control and accountability. Next 8 slide.

9 In fiscal year 2019, the materials enforcement program 10 focused on maintaining consistency in our escalated enforcement actions, and 11 enforcement conferences to ensure licensees are committed to doing the right 12 thing at all levels.

13 We further focused on increasing participation of the 14 regional state liaison officers related to activities within an Agreement State.

15 The total number of actions issued in fiscal year 2019 were 16 largely influenced by cases involving gauge users and radiographers. The 17 number of escalated enforcement actions issued to gauge users decreased 18 from ten to seven, and radiography cases doubled from six to 12, in regards 19 to escalated enforcement actions.

20 However, none of these trends indicate significant program 21 issues, as small year-to-year fluctuations are typical. The program is also 22 involved in a number of updates to the enforcement policy, which are expected 23 to be completed in early fiscal year 2021. Next slide.

24 The annual assessment of Nuclear Materials and Waste

60 1 Safety Program also includes an evaluation of the abnormal occurrences. No 2 significant performance trends or generic concerns were identified over the 3 last ten years.

4 In the annual abnormal occurrence report, the staff reported 5 the following, that there were nine events involving nuclear materials in 6 Agreement States. Seven were medical events, one event involved human 7 exposure, and the remaining event involved the stolen radiography cameras.

8 Although most AOs are medical events, it is not an 9 indication of a negative performance trend. The number of medical AOs is 10 small relative to the millions of activities involving the use of radioactive 11 material.

12 Nonetheless, in the last year, the staff has issued several 13 generic communications to alert the medical community to the medical events 14 that have occurred.

15 As part of our ongoing activities to enhance the program, 16 the staff recommended and the Commission approved the development and 17 proposal of a limited revision to the AO criteria in the medical event and source 18 security areas, to align these criteria with events that are significant from the 19 standpoint of public health and safety. Next slide.

20 The Nuclear Materials and Waste Safety Program 21 conducted programmatic self-assessments and innovations to enhance 22 inspection and licensing programs. We initiated measures to ensure we are 23 further risk-informing our processes and including very low safety significant 24 issue resolution into our processes.

61 1 Recognizing the need to identify potential program 2 enhancements and to continue to make fuel cycle licensing and oversight 3 programs more risk-informed, the staff initiated a building a smarter fuel cycle 4 program effort in April of 2019.

5 We conducted an assessment of the fuel cycle oversight 6 program to improve efficiency, while further integrating risk-informed insights 7 to ensure the staff remained focused on the most safety-significant elements 8 and achieving the mission of reasonable assurance of adequate protection.

9 Full implementation is planned for January of 2021.

10 We also evaluated and enhanced the independent spent 11 fuel storage inspection program. The recommended enhancement includes 12 changes to inspection frequency, level of effort, inspector training and 13 qualification, and a budget structure used to fund the program that will risk-14 inform our process.

15 An NRC staff working group was formed with individuals 16 representing all four regions and NRC headquarters that includes specially 17 trained and qualified ISFSI inspectors and a resident inspector to evaluate and 18 enhance the NRC's ISFSI inspection program.

19 Feedback was solicited from internal and external 20 stakeholders on the proposed revisions at public meetings. The staff has 21 planned an additional webinar to discuss the draft recommendations and will 22 consider input received during the webinar before any final decisions are 23 made. Full implementation is planned for January of 2021.

24 The Nuclear Materials Users program also continues to

62 1 focus on implementing an innovative and risk-informed evolution of the 2 Nuclear Materials Users Licensing and Inspection program in a phased 3 approach.

4 Phase I and II focused on enhancing coordination with 5 Agreement States. Our current focus for Phase III will focus on evaluating 6 and incorporating risk performance insights into the materials inspection 7 program, exploring the use of collective inspection and oversight efforts 8 across the national materials program, and incorporating strategies to provide 9 a clear disposition of low safety significant issues and inspection programs, 10 processes, and procedures. Next slide.

11 Based on a review of event data and assessment of key 12 events, the staff concludes that the Nuclear Materials Waste and Safety 13 Program is functioning effectively to protect public health and safety.

14 There have been a number of program enhancements that 15 have the common theme of change. Change to our process, what we do, 16 and how we do it. Change to the people, how we accomplish our work.

17 Change to the papers, documenting what we do.

18 As we continue to implement change, our people, 19 innovation, transformation, as well as incorporating risk insights, will serve as 20 our guide. We will continue to address enterprise risk, schedule risk, and risk 21 smart tools as we work smarter.

22 Thank you and I will now turn it over to Chris Miller.

23 MR. MILLER: Thank you, Kevin. Good morning, Chairman 24 and Commissioners. I'm pleased to be here discussing the results of the

63 1 2019 Reactor Oversight Process self-assessment, the plan for the 2020 ROP 2 self-assessment that's currently underway, and the trends we've observed in 3 the findings since 2015, which was also a topic of our meeting last year. Next 4 slide, please.

5 Put simply, the purpose of the ROP self-assessment is to 6 evaluate the effectiveness of the ROP each year, learn from these 7 evaluations, and to improve the ROP accordingly.

8 In calendar year 2019, the staff conducted a limited ROP 9 self-assessment and documented the results in SECY 20-0040. The 10 calendar year 2019 ROP self-assessment activities included collecting and 11 analyzing the ROP performance metrics, performing ROP program area 12 evaluations, and conducting an effectiveness review of the Cross-Cutting 13 Issues Program.

14 While the staff assessed two ROP performance metrics as 15 meeting the red threshold in the areas of significance determination process 16 timeliness and inspection program feedback timeliness, the staff determined 17 that neither indicated programmatic weaknesses due to external impacts on 18 the SDP timeliness. And in the case of the inspection program feedback, 19 significant and sustained improvement in the process and in the timeliness.

20 Staff completed program area evaluations of the four major 21 program areas, inspection, assessment, performance indicators, and the 22 significance determination process, determining all four areas to be effective.

23 And as part of the ROP self-assessment, the staff began an 24 effectiveness review of the Cross-Cutting Issues Program for 2019.

64 1 The staff completed the majority of its work and the final 2 report, as you heard from Ho, is in routing for review. After we review and 3 discuss the final report, we will consider what changes may be needed, 4 discuss any plans for changes with stakeholders, and take appropriate 5 notification actions or permissions with the Commission.

6 Through these reviews and assessments, the staff found 7 that the ROP was effective, meeting strategic goals of ensuring safety and 8 security by providing objective, risk-informed, understandable, and predictable 9 oversight, meeting its intended outcomes. Next slide, please.

10 Along with completing all of the calendar year 2019 self-11 assessment activities, the staff also completed a comprehensive review of the 12 self-assessment program itself, notifying the Commission of the resulting 13 changes in the program in SECY 20-0039. We have implemented these 14 changes to the program for the calendar year 2020 ROP self-assessment.

15 The calendar year 2020 planned ROP self-assessment 16 activities, under the revised program, include the streamlined ROP metrics, 17 new ROP data trending program, ROP program area evaluations, and the new 18 ROP implementation audit, which this year will be in Region IV.

19 We're pleased to be moving this to a more data-driven 20 review, with the data analysis tools to support that effort. Next slide, please.

21 Next, I will address the continued decreasing trend in NRC 22 inspection findings since 2015. The downward trend continues to be evident 23 across the baseline inspection procedures, the seven ROP cornerstones, and 24 all four regions.

65 1 The staff has identified potential drivers for this downward 2 trend, including adjustments to the ROP, such as updated guidance on backfit, 3 cross-regional panels to gain consistency across regions on new or 4 particularly challenging findings, increased management oversight of the 5 findings determination process, and updated guidance on the minor/more than 6 minor threshold.

7 We continue to find agency oversight efforts to be effective.

8 While documented findings have decreased, the overall inspection hours and 9 sample requirements have not significantly changed in the baseline program.

10 Inspectors continue to monitor performance, communicate 11 observations to licensees, and identify performance deficiencies that are 12 entered into licensee Corrective Action Programs, such as Maggie detailed in 13 her example, even if those issues are not documented as inspection findings.

14 Next slide, please.

15 During the briefing for last year's Agency Action Review 16 Meeting, we discussed that inspection findings per site had decreased about 17 42 percent from 2015 to 2018. In 2019, that trend continued, with findings 18 per site decreasing further to about 50 percent of 2015 levels.

19 The staff reviewed the trend in findings resulting from actual 20 events versus the trend in findings identified by inspectors. The review 21 determined that there has been a drop in NRC-identified findings since 2015 22 that has been driving the overall decrease in findings, while the number of self-23 revealed findings has remained relatively flat from 2015 to 2019.

24 Industry performance in some areas have improved,

66 1 especially if you look over the 30-year period. The trend in reactor trips, even 2 over the past ten years, is down, with a decrease from 2010 to 2017 and then 3 a slight trend up after that.

4 For the specific period of 2015 to 2020, the scram trend has 5 been relatively flat, even as the number of findings has continued decreasing.

6 In addition, the 2019 NRC accident sequence precursor report indicates better 7 industry performance regarding accident precursors over a ten-year period.

8 We find there are no significant individual plant outliers, as 9 no licensees are in Column 3 or 4, and the NRC continues to take appropriate 10 action in response to licensee performance using the action matrix.

11 In summary, while our findings are decreasing, we find no 12 impacts on continued safe operations. Based on our significant inspection 13 activities and trend reviews, we don't see significant negative trends in overall 14 licensee performance as we monitor scrams, licensee event reports, operating 15 experience, and findings trends.

16 The flexible risk-informed baseline inspection program, as 17 executed by resident and regional inspectors, remains effective and robust.

18 Next slide, please.

19 And we are pleased to have talented staff trained and 20 working on improvements in data analytics and automation and visualization 21 tools.

22 In 2019, the staff leveraged these skills to improve existing 23 displays and develop new dashboards and tools for inspection and operating 24 experience trends, including inspection findings, industry scrams, licensee

67 1 event reports, and inspection hours charged by plant.

2 The new data trending portion of the ROP self-assessment 3 program is a great example of leveraging these data analysis and visualization 4 tools into our decision-making and evaluation processes.

5 Working with OCIO and EMBARK Venture Studios under 6 the Mission Analytics Portal project, the staff continued to develop prototype 7 dashboards for other ROP data user needs, so that resident and regional 8 inspectors can improve their activities with more efficient risk-informed data-9 driven information.

10 We hope to give the inspectors the ability to quickly 11 determine the highest contributors to risk at a site and more efficiently risk-12 inform their inspection sampling.

13 This concludes my presentation and I'll turn it over to Mike 14 King.

15 MR. KING: Thanks, Chris. Good morning, Chairman, 16 Commissioners.

17 It's my privilege to be here today to give you the results of 18 the 2019 construction ROP self-assessment, share with you some of the 19 significant improvements we've made to the program as a result of that 20 assessment, and share with you a little bit about the preparations we've been 21 making behind the scenes for eventual possible transition from construction 22 to operations and transition to the ROP for Vogtle 3 and 4. Next slide.

23 So, based on the results of roughly 5,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> of direct 24 inspection activity during calendar year 2019, Vogtle's performance remained

68 1 in Column 1, or the licensee response column, of the construction assessment 2 matrix, meaning that all inspection findings during that period were green.

3 Since 2012, we have accumulated roughly 44,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> of 4 direct inspection across Units 3 and 4. As you are aware, construction for 5 Unit 3 is nearing completion, and as a result, in fact, just last week, we updated 6 you on the status of inspection and licensing activities, what we call our three-7 month Commission memo, in advance of the anticipated all ITAAC complete 8 notification.

9 And for those listening in from the public that may not be 10 familiar with the term ITAAC, it's the inspections, testing, analysis, and 11 associated acceptance criteria which demonstrate that the plant has been built 12 in accordance with its approved design.

13 In that memo, we highlighted that we are approximately 85 14 percent complete with our preplanned ITAAC inspections and of the 399 total 15 ITAAC that need to be closed, we have verified 142 of them.

16 As the only construction site under the construction ROP, 17 and the first ever Part 52 construction project, we're learning valuable lessons 18 through the assessment program and incorporating those lessons. And I'll 19 share some of those with you.

20 We're continuing to successfully coordinate the oversight of 21 the Vogtle project through our Vogtle Readiness Group, or what we call the 22 VRG. The VRG is co-chaired by Chris Miller from the Division of Reactor 23 Oversight in NRR, Region II, Division of Construction Oversight, and the 24 Vogtle Project Office, with help from several men and women from across the

69 1 agency in several offices.

2 So, we believe we're prepared and ready to accomplish our 3 regulatory obligations, but we are continuing to adapt to the realities, 4 particularly in light of COVID and other impacts, and the nature of construction 5 as we go. Next slide, please.

6 For calendar year 2019, we met all program metrics, 7 however, our self-assessment did identify a need to adapt our program to 8 reflect the realities of the construction environment. For example, we 9 identified the need to revise our guidance documents to add flexibility to be 10 smarter and more risk-informed in how we accomplish our remaining 11 inspection activities.

12 As part of this, we took a critical look at how we decide which 13 ITAAC to inspect, which we call our targeted ITAAC, and our plans for 14 inspecting those ITAAC.

15 From talking with inspectors in-field, we learned that our 16 ITAAC targeting guidance was overly constraining and having them spend 17 some time inspecting certain things that didn't make a whole lot of sense from 18 a safety perspective. So, we weren't achieving a whole lot of safety benefit 19 from some of the activities they were doing.

20 So, we also identified opportunities to optimize the manner 21 in which we accomplish those inspections, by combining inspections of 22 components and tests that were similar enough that we should be 23 accomplishing the same activity.

24 As a result, we incorporated the updates to our inspection

70 1 guidance to enable us to inspect in a smarter way.

2 Our self-assessment also identified program updates 3 needed to make our handling of minor construction inspection issues more 4 consistent with what is done under the operating reactor inspection program.

5 We also identified the need to address an inconsistency in 6 how we handle ITAAC findings that are related to ITAAC maintenance issues.

7 As I mentioned, we rolled up our sleeves and really took a 8 focused look at how we could improve the remaining inspection plans across 9 the full suite of inspections that we do. We not only do ITAAC inspections, 10 but we inspect the operational programs and the licensee's initial test program.

11 Region II revamped their civil, mechanical, and electrical 12 inspection plans to make them more flexible by removing overly specific 13 samples and grouping inspection activities to maximize the benefit of our 14 inspection time.

15 We incorporated a mechanism to better track our progress 16 through the Vogtle Digital Dashboard, which we've shared with you before in 17 Commission meetings, and through the use of what we call burndown curves, 18 which the Vogtle Readiness Group frequently monitors to assess our 19 progress.

20 While these efforts I explained are critical to our success in 21 accomplishing the inspections which are needed for the project, the region is 22 continuing to evaluate and reassess remaining inspections done, 23 incorporating the lessons as we learn them. Next slide, please.

24 The realities of a dynamic construction environment, where

71 1 a lot of things come together at the end and the challenges of implementing a 2 program built largely focused on ITAAC required us to take actions to improve 3 our coordination and better align our resources with constantly moving target 4 inspections.

5 We increased communications and coordination with the 6 licensee through multiple inspection coordination meetings to ensure no 7 surprises on the scope and resources needed to support our inspections, and 8 we implemented a system where licensees notify us when pre-identified 9 inspection samples were ready for inspection. This has helped us to drive 10 awareness and to reduce inspector downtime.

11 All remaining significant and team inspections have been 12 carefully planned and coordinated with the best available schedule 13 information.

14 And finally, Region II has implemented a strategy to provide 15 the necessary surge in inspection resources that we anticipate near the end 16 of construction. The strategy leverages inspectors in other regions to provide 17 backup support for Region II inspection staff, which we anticipate will be 18 diverted to support Vogtle 3 and 4 efforts. Next slide, please.

19 As was mentioned earlier, we have also had to adjust to the 20 new realities of the COVID-19 environment. It has had an impact to 21 construction, as site staff have adjusted to social distancing and quarantine 22 measures, and it has impacted our own inspections.

23 We have leveraged technology to conduct more inspections 24 remotely than we did before, while conducting in-the-field inspections of

72 1 important activities.

2 We are focused on maintaining the quality of our 3 inspections, given our new reality, to provide for reasonable assurance that 4 we can effectively monitor the quality of construction and accomplish our 5 regulatory obligations.

6 The larger number of ITAAC being completed towards the 7 end of construction schedule also compresses NRC staff load later in the year.

8 We're taking measures to ensure we have the resources we need for the 9 increased workload anticipated over the holiday periods and are proactively 10 looking for ways to accomplish all or part of the remaining inspections ahead 11 of the ITAAC closures. Next slide, please.

12 In parallel with construction, we're also planning for 13 transition to operations. We established a working group to refine our 14 planning for the transition, while incorporating lessons learned from the Watts 15 Bar experience.

16 We challenged ourselves to anticipate decisions we need to 17 make today to provide for a smooth transition.

18 We developed a memo to capture and communicate those 19 decisions on things such as the proper handling of ROP cornerstones and 20 performance indicators, roles and responsibilities of the different organizations 21 during the transition period, and how we would coordinate inspections across 22 all four units. We conducted a public meeting to share the plan and issued 23 the memo on August 14.

24 We also adjusted the ROP baseline inspection sample sizes

73 1 to account for the AP1000 design. As you are aware, this was not a 2 fundamental departure from the proven ROP baseline inspection program.

3 Rather, it was adjustments to those sample sizes to account for the fewer 4 number of components and the simpler design of the AP1000.

5 We informed the Commission in June, through a SECY 6 paper, of the changes and we are currently updating the procedures and 7 guidance to reflect these changes. Next slide, please.

8 With the first potential completion of Part 52 licensing 9 process at Vogtle, we're capturing valuable lessons learned and facilitating 10 knowledge management to be used to further improve the construction ROP 11 and to prepare for the future new advanced reactors.

12 The experience gleaned from Vogtle construction highlights 13 that adopting a more flexible approach to how we inspect ITAAC allows the 14 staff to better focus on risk-significant activities, while maintaining adequate 15 coverage of the broad range of ITAAC-related activities, enabling us to 16 conduct our inspections in a smarter way.

17 As the changes we have recently made to the program 18 highlight, we're not waiting to incorporate lessons learned from Vogtle 19 construction and are making incremental improvements as we go, where 20 appropriate.

21 However, we do see the benefit of pausing and taking a 22 fresh look to do a lessons learned after the possible 103(g) decision for Unit 23 3. Until that time, we've initiated efforts to capture insights and feedback from 24 staff who may be departing before that point, so that we can include that as

74 1 part of our lessons learned effort.

2 We're also in the early stages of engagement with other 3 divisions in the office, as we look ahead to what oversight for advanced 4 reactors should look like, informed by our experience with Vogtle.

5 Lessons learned with licensing of Vogtle have already 6 yielded some improvements in licensing area. For example, the scope and 7 breadth of ITAAC for the NuScale design was informed by the experience we 8 gleaned from ITAAC for Vogtle and other earlier combined operating license 9 applicants.

10 In short, we're doing what we can today to prepare for the 11 road ahead for new and advanced reactors.

12 With that, I'll turn the presentation back over to Dan. Dan?

13 MR. DORMAN: Thank you, Mike. In closing, let me 14 reiterate that we met all the objectives of the Agency Action Review Meeting 15 process, that through the discussions at the AARM, the senior leadership 16 affirmed that the agency's completed and planned oversight actions are 17 appropriate and consistent with our oversight processes, and that those 18 processes are effective.

19 As you've heard today, we continue to look for 20 improvements to our oversight programs, especially in the areas of leveraging 21 technology and data analysis and lessons learned from significant oversight 22 activities.

23 And I particularly want to thank the Office of the Chief 24 Information Officer, who's not in these panels today, but whose great work is

75 1 really enabling us to do all that leveraging technology and data analytics.

2 I also want to thank all the office directors and regional 3 administrators for their engagement in the AARM, as well as the staff whose 4 efforts are so essential in coordinating the inputs to the meeting, the conduct 5 of the meeting, and the preparation for this Commission briefing.

6 Finally, I want to take a moment to say thank you to all the 7 resident and senior resident inspectors at the front lines of our agency mission.

8 We always appreciate their contributions, but especially during this COVID 9 public health emergency.

10 So, thank you, Chairman Svinicki and Commissioners, and 11 we're ready for your questions.

12 CHAIRMAN SVINICKI: Thank you for that, Dan. And 13 before I turn it over for the Q&A session, I'll just take a moment of Chairman 14 prerogative, because I neglected to communicate this during the COVID 15 meeting.

16 But you closed with a comment that I want to add to, which 17 is to express on behalf of the Commission our gratitude to resident inspectors 18 and senior resident inspectors, as you mentioned, but also to both 19 headquarters and regional operation officers, to region-based inspectors that 20 have had to be deployed, particularly in the early days of the public health 21 emergency.

22 While we have acknowledged and celebrated that for the 23 bulk of NRC employees our transitioned to work from home was very 24 seamless, we're also very blessed that our work duties make our work

76 1 amenable to doing that.

2 We have essential staff here, all our staff is essential, but 3 we have folks that their work duties are going to require them to go out onto 4 the front lines, despite uncertainties about the public health emergency, of 5 course, while practicing all the appropriate public health recommendations.

6 But all of them were not maybe able to take part in the 100 7 percent work from home activity, they were uniquely called to step forward.

8 And the Commission, I know, to a person is very grateful for that work.

9 So, with that, that was my moment of Chairman prerogative 10 and I shall turn it over to Commissioner Wright.

11 (Laughter.)

12 COMMISSIONER WRIGHT: Thank you, Chairman, thank 13 you for that. And since I'm looking in his direction, I'm going to start with Mike.

14 So, Mike, thank you for your presentation and before I ask 15 you the question, I want to, I'd be remiss if I didn't thank you and the Vogtle 16 Project Office and Region II and the staff for their dedicated work in keeping 17 us on track.

18 I know there's a lot of movement, changing of staff, shifting 19 of dates, and oh yeah, there's a pandemic going on that requires a lot of agility 20 on everybody's part and I want you to know that the staff's work does not go 21 unnoticed.

22 MR. KING: Thank you.

23 COMMISSIONER WRIGHT: And that's from the residents 24 in the field to the reviewers in the office.

77 1 So, you spoke about the adjustments made to the baseline 2 inspection program based on the simpler and safer technology of the AP1000 3 design and how it might be used for future small modular and advanced 4 reactors.

5 And I'm not going to ask the obvious question, I want to ask 6 it a little differently. Have you seen any lessons learned or insights from that 7 effort that could apply to the ROP for current operating fleet?

8 MR. KING: Well, I think the effort which was done to bring 9 together a working group, to really challenge ourselves and say, okay, based 10 on the number of components in this design, what's different about this design 11 than legacy fleet?

12 That approach, I think was probably something we could 13 use for future designs, to adjust and forecast what we think our level of 14 inspection should be for those, perhaps, simpler, more passive based designs 15 that are coming in the future.

16 So, in terms of getting feedback from where we ended up, 17 obviously, time will provide that feedback, once the first unit transitions to 18 operations, so we get the chance.

19 And so, we have built into the program some periodic looks 20 as we implement the new Reactor Oversight Process at Vogtle AP1000 units, 21 to bake-in that look, to do just exactly what you're saying, what are we learning 22 from our experience of this first application of the new sample sizes at Vogtle?

23 Do we have it right? Do we need to adjust?

24 And I think we'll probably learn some valuable lessons as

78 1 we go along, and we adapt based on that.

2 COMMISSIONER WRIGHT: Thank you. I'll turn over here, 3 hey, Kevin, how are you? Thank you for your presentation as well and 4 congratulations on the new position, too.

5 MR. WILLIAMS: Thank you.

6 COMMISSIONER WRIGHT: So, you mentioned the self-7 assessments for the ISFSI and fuel cycle programs. The staff is also 8 updating the inspection manual chapters, I guess, for materials users. Can 9 you tell me about how the changes to these programs were informed by trends 10 in licensee performance?

11 MR. WILLIAMS: So, thank you for that. What we did is we 12 established a number of working groups. We tried to get a broad spectrum 13 of inputs, whether it's operating experience, whether it's smarter ways and 14 better ways of doing things, we focused on our best resource, which is the 15 staff who work these things every day.

16 And so, we looked at the programs themselves and where 17 could we inform these programs, in terms of we're looking at it from a risk 18 perspective, a safety significance perspective, operating experiences, things 19 that have gone in where the inspectors have had some good runtime, whether 20 that's an onsite inspector, resident inspector, license reviewer. So, a lot of 21 those things, we took into play as we looked to update our processes.

22 We also looked at interfacing with the stakeholders, whether 23 that's internal, external. In some areas, if you look at Manual 2800 for the 24 materials, we've looking to the Agreement States, how have they been able

79 1 to implement the program? How do we effectively implement risk into the 2 program?

3 So, all of those inputs, we've taken to help assist us in 4 making an informed decision.

5 COMMISSIONER WRIGHT: Thank you. Chris, good 6 morning.

7 MR. MILLER: Good morning, sir.

8 COMMISSIONER WRIGHT: For me, it's just great to see 9 people in person. This is really great.

10 (Laughter.)

11 COMMISSIONER WRIGHT: So, as you mentioned, the 12 staff's being doing a lot of work on effectiveness reviews in the area, not only 13 the Cross-Cutting Issues Program, but also Problem Identification and 14 Resolution.

15 So, I understand that we have not made any changes right 16 now to the cross-cutting program since 2015, could you share any initial 17 insights you have on the cross-cutting program review right now and the 18 effectiveness of those 2015 changes?

19 MR. MILLER: Thank you for the question, Commissioner.

20 Yes, we were happy to embark on this, because it had been 2015 that we 21 made the suite of changes.

22 The inspection or the cross-regional team, and actually, we 23 had members from Research, we had NRR, we had lots of folks looking at it.

24 And we got some really good data analysis to do two things.

80 1 One, to say, is the current program as it is effective or not?

2 And the answer to that was a resounding, yes. It is effective, the data show 3 that it's accomplishing those two purposes that Ho outlined before. It's 4 making us aware of performance that may be declining and it's giving incentive 5 to do something about that.

6 However, some of the data would show that the sensitivity 7 is not quite what it was before 2015 and the changes, and that's going to come 8 out in the report, we'll have all that analyzed.

9 So, I'd like to see what the team recommends. I know 10 some of it is clarity in how you implement the program, and that we can always 11 benefit from, both the NRC and licensees.

12 But beyond that, there might be some tweaks in the program 13 to make it easier to implement, maybe make it a little bit more sensitive, and 14 as Ho mentioned, we're going to be analyzing those reports, we're going to be 15 making decisions on, okay, which one of these kinds of recommendations that 16 they're coming up with might make it more effective?

17 COMMISSIONER WRIGHT: Do you foresee anything that 18 you're reviewing in these areas impacting the ROP enhancement paper that's 19 currently before the Commission?

20 MR. MILLER: No, as -- thank you, Commissioner, another 21 good question. Nothing that we saw from our oversight efforts would tell us 22 that the conclusions we drew in the SECY 19-0067 would be different based 23 on our review.

24 We were happy to do the look as we promised in that SECY,

81 1 but nothing significant regarding our recommendations to the Commission 2 came out of it.

3 COMMISSIONER WRIGHT: All right. I'm going to stay with 4 you.

5 MR. MILLER: Sure.

6 COMMISSIONER WRIGHT: Got one more or so. So, in 7 the first panel, and also in this one, we've heard about how data's going to be 8 used and it's going to be made public in areas, some of these dashboards that 9 have been talked about.

10 And you talked -- when I see a downward trend in findings, 11 like you discussed related to the ROP, I don't assume it's necessarily a bad 12 thing, right, or a negative thing? And you mentioned several drivers for the 13 trend as well.

14 But on the dashboards and the stuff that's going to be going 15 and be made public, does the data being made available provide the 16 background to understand the trends when it goes public? And if it doesn't, 17 is there a way to provide that background information is there, so that whoever 18 is looking at the data is telling and understanding an accurate reflection or 19 story?

20 MR. MILLER: So, that's, Commissioner, another great 21 question. That's part of what our team is trying to do, is not only present the 22 data in a meaningful way, but it's in a way that the appropriate audience can 23 understand.

24 And so, when those dashboards are made public, we'll have

82 1 the proper explanation on what these findings mean.

2 I will note that on our internal dashboards that we've been 3 testing out, and they're available to NRC staff, at this point, as we're working 4 through to get the right data available, yes, they provide that kind of 5 perspective. You can focus on a certain period of time, whether it's five years, 6 ten years, 30 years, well, not 30 years, but since the ROP was started 20 7 years ago.

8 And then, we'll have appropriate pointers to other publicly 9 available documents, because all this data is coming from inspection reports, 10 LER, licensee event reports, a bunch of different data that the public has 11 availability for.

12 So, you can drill down in that data and find what you're 13 looking for and then, go to a specific site. For example, you can screen these 14 by site, by region, by a number of different parameters.

15 COMMISSIONER WRIGHT: Right. Thank you so much, 16 Chairman.

17 CHAIRMAN SVINICKI: Thank you, Commissioner Wright.

18 Next, we'll hear from Commissioner Hanson.

19 COMMISSIONER HANSON: Thank you, Madam Chairman.

20 Kevin, I'm going to start with you. You mentioned, I think in some of the 21 discussion on slide 45, about staff, how staff is enhancing our coordination 22 with Agreement States and incorporating strategies to provide clearer 23 disposition of low safety significance issues and inspection programs, et 24 cetera.

83 1 Could you talk a little bit about how you're doing that and 2 what kind of specific activities you're undertaking with Agreement States?

3 MR. WILLIAMS: Sure. The Agreement States are -- we 4 treat them as co-regulators in the program. And so, we have a very robust 5 relationship with the Agreement States. I think one of the biggest issues is 6 the focus on communication.

7 One of the things that we did early on, and I am going to get 8 to answer your question, but one of the things we did early on is we listened 9 to what they wanted to receive back, how they wanted to be treated as a co-10 regulator.

11 One of the things that they focused on initially was getting 12 more engaged in rulemaking. So, we engaged the rulemaking staff and we 13 carved out a way to get their information up front, early in the process versus 14 on the back end of the process, so that we would be able to fully appreciate 15 and understand what their considerations are.

16 Now, we've taken that same concept and applied it to the 17 updating of our guidance, whether that's Manual Chapter 2800, changes to 18 our IMPEP program as a whole, we've engaged them in a manner by which 19 we get them on our working group.

20 For example, we have at least two to three Agreement State 21 representatives on our working group and we're incorporating and talking to 22 them about all aspects of the program.

23 We just recently had a meeting with the division directors, 24 all the regional division management, and we included them in that

84 1 conversation, so we could get their input, especially if there was anything 2 contrary to where we were going, so that we could make informed decisions 3 on our process.

4 So, what we're trying to do there is make sure that we get 5 them in up front, early, what I would call any differing view or -- and I'm not 6 saying that because they have a differing view, but we want to make sure that 7 we engage all of our stakeholders such that we can make informed decisions 8 about our processes.

9 COMMISSIONER HANSON: Thank you for that, I 10 appreciate it. I'm going to stick with you here just for a minute. I think on 11 that same slide, you had mentioned smarter fuel cycle facility inspections and 12 regulation.

13 And of course, one of the things, I think, in some of the fuel 14 cycles that the public is worried about are environmental impacts, particularly 15 with some of the spills that we've seen.

16 So, can you talk to me about how environmental impacts are 17 addressed in both the way we currently inspect those fuel cycle facilities and 18 ways that we might do so in the future?

19 MR. WILLIAMS: That may be a little bit outside of my area, 20 but one of the things that we focus on is, we have a number of engagements 21 with our external stakeholders, we try to get that input up front and early.

22 We have an environmental group themselves that conducts 23 the environmental impact reviews to inform our decisions in terms of what's 24 the impact on the process? And as such, we can be more effective in our

85 1 communication.

2 COMMISSIONER HANSON: Okay. Thank you. Chris, 3 good to see you in person. I met you virtually a couple of weeks ago, so this 4 is great.

5 (Laughter.)

6 COMMISSIONER HANSON: So, the Nuclear Energy 7 Institute had a report out, I think in the last four or five months now, about the 8 correlation, if you will, between performance and safety. I've talked to them 9 about that, or rather, they've come to talk to me about it.

10 But does the staff have views on that? I mean, you 11 mentioned briefly kind of improved industry performance overall, has the staff 12 kind of taken a hard look at that report and do you have some thoughts about 13 it?

14 MR. MILLER: Yes, Commissioner, thanks for the question.

15 We have taken a look at their report and I will share some views. I mean, 16 they do some good work, looking at the history of the operating reactor 17 program over a long period of time.

18 And so, you may hear a little bit different from the message 19 that I'm telling you about the findings trend from 2015 to 2019 or to 2020, 20 because over the period that they're looking, over 30 years, there's no doubt 21 that there's been significant improvements in safety, both because of 22 programs, but equipment, adding FLEX, I mean, you can reel off a number of 23 things. And the risk numbers that they show validate that.

24 Also, things like scrams. Scrams have gone down

86 1 significantly. So, accident initiators, potential accident initiators, obviously.

2 The LERs, licensee event reports, have gone down. So, the things that we're 3 monitoring, say, overall, the industry trend is getting an improvement, it's 4 getting safer.

5 We looked at some of that data, actually, on our own, in 6 partnership with the Office of Research, when we were doing the SECY 19-7 0067 we delivered in June of last year, and looked to see is there 8 improvements in safety? And there were, and in a number of areas we found 9 that to be true.

10 So, we did look at it, we validated what they're saying, but 11 there's also looking at current performance, trying to analyze these findings 12 things, because there's a lot of, as Commissioner Wright mentioned, there's a 13 lot of inputs to that that might be affecting the findings.

14 And so, it's not a one-for-one, because they're looking over 15 30 years, we're looking over four or five years. Just wanted to make that 16 clear.

17 COMMISSIONER HANSON: No, that's right, it's a multi-18 variable kind of situation and correlation isn't necessarily causation. And 19 there are a bunch of caveats that you can put around this, so I really appreciate 20 that. That's all I have. Thank you, Madam Chairman.

21 CHAIRMAN SVINICKI: All right. Thank you. I was going 22 to start with Kevin, but I actually realized everybody's doing that, so what I'm 23 going to do is start with Mike King.

24 (Laughter.)

87 1 CHAIRMAN SVINICKI: And that way -- and I'm going to go, 2 I think, reverse, or maybe I'll flip-flop here, just to keep it interesting and keep 3 all the presenters listening to all the questions and not just assuming the order.

4 So, Mike, would you happen to know, off the top of your 5 head, in terms of the peak activity level on inspection to-date, when we talk 6 about this necessary surge in inspection that comes right at the end, is that 7 like a doubling of the most busy you've ever been or a tripling, or is it just like 8 maybe 20 percent more, would you know relative range? I'm trying to get a 9 sense of how much that would stress the system in ways that it hasn't been 10 stressed yet.

11 MR. KING: So, in terms of, if you use the number of ITAAC 12 that are being closed in any particular month as a proxy for level of workload, 13 it could be on the order of three times kind of the maximum workload we've 14 seen in terms of number of closure of ITAAC.

15 However, what kind of offsets some of that is we anticipate 16 that those ITAAC are going to be closed towards the end. And so, we're 17 really kind of taking proactive steps to see what pieces can we look at today, 18 rather than waiting until they say we're about done, to push as much of that 19 workload early on as we can.

20 CHAIRMAN SVINICKI: And you had mentioned that, and 21 also, I think the other thing you highlighted in terms of getting ready for that 22 peak or surge, it's thought we are -- it's kind of going to be a whole of NRC 23 response that we're going to prepare for in advance, in terms of looking at 24 what inspectors might be available or could be deployed to help with that.

88 1 And I didn't mean to suggest in any way that this is catching us unaware, we 2 --

3 MR. KING: Right.

4 CHAIRMAN SVINICKI: -- didn't know, but we've known and 5 been talking about this for a very long time. It's a little bit like constructing a 6 house or anything else, you've got that punch list at the end and it just -- but I 7 think we've also, years ago, worked to smooth it.

8 You've continued to try to smooth it, that's the efforts you're 9 making now. But it will inevitably be a surge and it sounds --

10 MR. KING: Absolutely.

11 CHAIRMAN SVINICKI: -- kind of like a dramatic 12 proportionality there, so we are getting folks ready to help with that. And, 13 Dan, it looks like --

14 MR. DORMAN: Chairman, if I could, yes, it's not just what 15 inspectors are available, it's making sure we've got inspectors with the right 16 knowledge and skills to apply to the AP1000. So, Region II has cross-trained 17 about 30 of the operating reactor inspectors in the AP1000 technology. So, 18 that's the surge force.

19 And then, to make sure that we're not losing the bubble on 20 the operating fleet in Region II during that period, the regions have been 21 coordinating, along with NRR, anticipating this for several years.

22 The other regions are planning their work as well and are 23 ready to supplement Region II as needed with the operating reactor inspectors 24 to ensure that we keep the baseline complete on the operating reactors

89 1 throughout the surge.

2 CHAIRMAN SVINICKI: Okay. Thank you. And if Mike 3 isn't following this, Dan, maybe you'll jump in. As busy as I know that the 4 Vogtle Readiness Group and the Vogtle Project Office are with their eyes on 5 the project, and that's appropriate, the NRC has for some years had in 6 development what I call, I think we're still calling the Part 52 lessons learned 7 rulemaking.

8 And so, Mike, being closer to the project -- and the focus 9 needs to be on the project itself, again, I've acknowledged that. But are we 10 making sure to capture things that we feed back into that rulemaking group 11 and process and could you talk a little bit about that?

12 MR. KING: Yes. When we reunified the office, part of what 13 had previously -- all the licensing experience and a lot of the staff involved, 14 some of them split off to go to different parts of the organization and the unified 15 office.

16 And the folks within the Vogtle Project Office have remained 17 engaged with the 50.52 efforts. In fact, we recently had the opportunity to 18 review and provide comments on the draft. So, yes, we are staying engaged 19 with regards to particular insights. And I don't know, Dan, if you want to --

20 MR. DORMAN: No, I think not only to the rulemaking, but 21 also I think Ho touched on it in his presentation earlier, to the licensing 22 activities that go on in the interim as well. So, the lessons learned on 23 reexamining the ITAAC on the AP1000 were applied in the NuScale review, 24 for example.

90 1 CHAIRMAN SVINICKI: Okay. Thank you both for that.

2 Kevin, I appreciated your earlier responses and you talked about our 3 Agreement State partners and that partnership of looking at them as a co-4 regulator.

5 But we also undertake routine assessments of the rigor of 6 the various Agreement State programs on those teams doing those reviews, 7 of course, are Agreement State regulators from other states. So, it has an 8 element of being peer-to-peer, but it's also got an NRC structure that binds it.

9 I don't know, Kevin, if you're aware, maybe Dan has some 10 awareness, but we, of course, depending on the health of the Agreement State 11 program, the frequency varies, they're called these IMPEP assessments, and 12 I never can remember, I'm going to make up a plausible list of things to string 13 together for it, I think it's something like Integrated Management and Program 14 Evaluation, something or other, the last P, I can't, I used program already, so 15 I can't use it again.

16 So, I don't know what it is, but we all call them, very 17 affectionately, the IMPEP. Some part of that has gone virtual, I understand, 18 maybe the management team look at the results, something that was 19 generally a field element of IMPEP reviews was accompaniments of looking 20 at -- accompanying state inspectors on inspections.

21 So, can you tell me if we're going to get the scheduled 22 IMPEPs done this year and maybe projecting forward to next year? And 23 then, if we have had to relent on that kind of accompaniment, that seems to 24 me that's probably a good part of these inspections that would need to be

91 1 resumed at some point, but I'll just let, Kevin, is there anything you can share 2 on that?

3 MR. WILLIAMS: Yes. So, during the COVID public health 4 emergency, we took a very measured approach to IMPEPs. And we decided 5 that we would develop a decision matrix, in terms of whether or not we would 6 conduct an IMPEP.

7 And one of, just as you stated, one of the things that we 8 thought was very critical to this was to conduct the inspector accompaniments.

9 And so, we looked at a couple early on and we said, if we have not conducted 10 the inspector accompaniments, we will postpone that process, and we did.

11 But we have conducted a number of IMPEPs which did have 12 the accompaniments up front. Most recently, Virginia just had their IMPEP, 13 because we had gone out and done the inspector accompaniments.

14 We've also looked, in terms of the health of the program, 15 where they're at in their program perspectives, what can we push out, what 16 do we think that we know, because we're constantly, whether we're doing a 17 periodic meeting to assess their capabilities, that gives us some insights into 18 the program, where their program is in terms of whether they're on, like, 19 heightened oversight monitoring, things of that nature.

20 And that factored all into our decision-making on whether or 21 not, how we would approach these activities, would we need to increase our 22 periodic meetings to them, just to stay abreast on those type of activities.

23 And as such, we've developed our 2020 and remaining out 24 year schedule of IMPEPs. And it will be informed by whether or not we have

92 1 travel restrictions, if things can be -- what can be done remotely.

2 We did the Wyoming IMPEP remotely. Because it was a 3 very small subset of activities, we conducted the Vermont periodic remotely.

4 And because we believe it does give us a good indication of what the program 5 is, is going on.

6 And we were able to do the same type of activities within the 7 same time frame. Early on, we did Georgia's IMPEP remotely as well, 8 because the inspector accompaniments were done. And it's been a good 9 exchange of information.

10 We've done, I think at least two MRBs remotely, so that the 11 team was able to come together and provide an overview of the assessment.

12 The MRB was able to ask the appropriate questions and we could conclude 13 that they were adequate and compatible within NRC regulations.

14 CHAIRMAN SVINICKI: Great, thank you for that. And I'll 15 just turn to Chris. Chris, you today got the perhaps unwelcome task of kind 16 of being the staff face and representative on your slide 51, which is the decline 17 in NRC findings over a certain slice of years. And that's been explored by 18 some of my colleagues here as well.

19 And I kind of look at this each time, thinking what is the best 20 both way to think about this and to articulate it? Because I think that it kind 21 of lends itself to a lot of different ways of looking at it.

22 And as many of us do, I try to project myself into the mind 23 maybe of someone who lives near a U.S. nuclear power plant, and on the one 24 hand you say to yourself, well, how can we be sure that the program is

93 1 effective and the sites are safe when we look at something -- I also looked a 2 little bit at the years that we've chosen to represent on this slide 51 and I know 3 that post-Fukushima, there were areas that received a rigor of looking, I think, 4 that was more intense than maybe they had and there's a lot of reasons why 5 that happened.

6 So, we might be starting with some pretty hot, like the first 7 year in the chart is maybe it was an elevated year, I don't know that for sure, 8 but that's something that comes to mind. But it's this trickiness of kind of 9 governance over processes like this.

10 The classic example is you don't want to tell a law 11 enforcement officer that your job will be, your effectiveness will be judged, you 12 have to issue this many citations to people in our town every week. And 13 everyone knows that that has a perverse incentive on what happens there.

14 At the same time, it's a little bit of proving unknown 15 unknowns, like, what are the unfound inspection matters that are in here?

16 So, is there any -- I'll close with this really simple question.

17 Has the staff found any really great way to articulate this again just to the 18 public? Maggie was talking about public assurances that we offer, is there 19 some bottom line way that is the staff's kind of best foot forward on a chart like 20 this?

21 MR. MILLER: Good question, Chairman, thank you so 22 much. So, and I'll use one of your examples. But, yes, I think the bottom 23 line message is, no matter how many findings in a particular year, there's a 24 number of reasons why they might have gone down.

94 1 We still have almost 3,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> of direct inspection that we 2 do at each site, each of the 59 sites, we're there, our presence is there, doing 3 the kinds of things that Maggie mentioned. They might all not, the things that 4 they find might not all end up in findings, they could be minor violations, which 5 don't get in a report at all, they don't track them.

6 They could be just looks to say, hey, you got away on this 7 one because you just barely met the time requirements, you were lucky, but I 8 would look at this. And those type of conversations happen every day 9 because of our presence onsite. So, I think that's the main message.

10 I would liken your example, instead of us focusing on the 11 number of findings, it's more like the red light example. If you have somebody 12 out there looking, if you have a red light camera at an intersection, you're going 13 to find that people slow down and the data show that.

14 And we find that licensees, when they know the inspectors 15 are out there, they're going to take a closer look at how they do things.

16 CHAIRMAN SVINICKI: Yes, I think there's also an increase 17 in people being rear-ended at those lights, but that's separate.

18 (Laughter.)

19 CHAIRMAN SVINICKI: People slam on the brake, no, I think 20 there's data, I can't cite to it right now, but I've heard that it's a little bit of a 21 mixed bag on the red light cameras because people might really not have 22 adequate stopping time and they would ordinarily have proceeded safely 23 through on the yellow. But, anyway, Dan wanted --

24 MR. DORMAN: Just very quickly --

95 1 CHAIRMAN SVINICKI: -- to say something, I'm over --

2 MR. DORMAN: -- Chairman, the performance indicators in 3 the ROP are independent of what our inspectors are doing. So, they provide 4 also an indication of what's happening. And so, at the beginning of this period 5 that we're looking at, in 2015, we had a plant in Column 4 and then, late in 6 that year, we added a second plant to Column 4.

7 And so, that's a contributor to the trend, but it doesn't define 8 the trend. And I think Commissioner Wright mentioned, there's a number of 9 inputs and none of them individually correlates to the trend.

10 But to your question of the unknown unknown, one of the 11 reports that is provided to senior management on a monthly basis is the status 12 of each plant in terms of the columns and the action matrix, but also what 13 plants are close to thresholds on the performance indicators.

14 And I follow that closely, because I think it helps me with the 15 unknown unknown and I don't see as many plants close to action matrix 16 thresholds as I've seen in the past in this period that we're looking at. So, 17 that combined with, we've had several greater than green findings this year.

18 So, I'm confident our inspectors are out there finding the 19 things that are important. They are very adept at risk-informing their samples 20 and they're finding the things that are important, so that's my confidence.

21 CHAIRMAN SVINICKI: Well, and again, I'm way over my 22 time, but just to reveal sometimes maybe how simplistically I look at things, 23 which maybe isn't a thing I should reveal publicly, but I look at it and say, it 24 also isn't the objective for plants to continue to operate with a certain number

96 1 of deficiencies so that we can have inspection findings.

2 I mean, if it never went down, then you would ask yourself, 3 well, how effective is our program, because like the same kinds of oversights 4 and mistakes tend to be found every year? So, I don't know that I want to be 5 an advocate for having a lot of NRC findings.

6 In any event, I'll close with that. And my apologies to my 7 colleague, Commissioner Baran, because I went way over, sorry about that.

8 COMMISSIONER BARAN: No problem at all. It's a great 9 conversation to have and it's one I want to ask a little bit more about. I think 10 it is important for us too, as an agency, just get our arms around this trend and 11 understand what's going on here.

12 And I know that's going to be multiple variables and it's 13 difficult to figure it out, but I think really understanding what might be 14 contributing to it is important. And, Chris, I appreciate you taking a fair bit of 15 time in your presentation to talk about this in some detail, because I think it is 16 something we need to be aware of.

17 The Chairman was talking a little bit about the particular 18 graphs that you used and which years you covered. I was looking at the data, 19 really, from the beginning of ROP. And for that first 15 years, I wouldn't say 20 it's flat, but it's basically averaging about 850 findings for the fleet.

21 And then, we see from '15 to 2019, that really drops 22 precipitously down to 440. So, as you mentioned, that's about a 50 percent 23 drop per site on average, just raw numbers, 46 percent drop in that four years.

24 And that is, then, the lowest number of findings from the 20-year history of

97 1 ROP.

2 Last August, the staff sent the Commission an analysis of 3 the possible drivers of this trend, you talked a little bit about that. That 4 analysis is publicly available.

5 Has the staff done any additional formal analysis of the 6 inspection finding trend during the past year or is that still kind of the latest 7 best information on the staff's review?

8 MR. MILLER: So, thank you, Commissioner. And we do, 9 we look at this a lot, we ask ourselves that question a lot.

10 One of the things that we've done is to shine a light on it.

11 We have now a trend that anybody can go to, click on, and say, how are those 12 doing?, how are the regions doing?, is there a particular outlier anywhere?,

13 and are the numbers going down?

14 So, we do look at it, we do have that discussion. We 15 haven't commissioned a formal team to go and get more data.

16 Early on in this, and as described in that paper, we had a 17 staff survey to see how -- what might have caused some of these, what were 18 some of the reasons? And that's detailed in that Commissioner Assistants 19 Note, as you mentioned.

20 So, no, we haven't, other than looking at the data and trying 21 to make improvements where we think is appropriate. If you remember, 22 some of this we believe was kicked off in a Government Accountability Office 23 review that said, hey, you've got quite a discrepancy between regions and 24 your findings and the like.

98 1 So, we've continued to add examples and clarity on how to 2 determine minor versus more than minor findings. We added that, again, this 3 year, January of this year, we added additional guidance in Manual Chapter 4 0612 Appendix Echo.

5 So, we are doing some things, but I think we need to give 6 that a little bit of runtime. That was January, when we added that improved 7 guidance and we need to give it maybe a year's runtime and see if that has 8 any effect on things, because there were a lot of questions.

9 But I think one of the things we did is added a lot of 10 oversight, a lot of eyes looking at this. And that in itself could be a driver.

11 The more that people are looking at it, you're shining a light on it, okay, did 12 you really make the right call there on minor versus more than minor or not?

13 And we are looking at and working with the Mission 14 Analytics Portal, are there other ways of describing the benefits of 15 inspections? It's not just findings, as the Chairman very aptly identified, 16 there's other things, there's other benefits, maybe there's other ways to show 17 it besides just findings.

18 So, we're looking at that as well. But no formal study, to 19 answer your question.

20 COMMISSIONER BARAN: Okay. Well, kind of in this 21 discussion and your presentation, you mentioned a few potential drivers for 22 the decline, and I thought it made sense to maybe explore those a little bit 23 more.

24 One, as you mentioned, were the cross-regional panels to

99 1 gain consistency across regions on new or particularly challenging findings.

2 What's the staff's thinking about how those panels focused on consistency 3 would lead to a lower number of inspection findings in all four years, every 4 year?

5 MR. MILLER: That's a great question. We kick that around 6 in our inspection group quite a bit, in our branch and division, and across the 7 offices, really, because it applies to all of them.

8 So, the cross-functional panels, I think the best example I 9 can give is in the engineering space. If you recall the environmental 10 qualification inspections that we did, we went out, before we had cross-11 regional panels, we had a number of unresolved items, we had a number of 12 issues that were being looked at differently across all the regions.

13 After we implemented the cross-regional panels, we got the 14 same information across all four regions. They were looking at it, they had 15 the right guidance, the inspectors, the branch chiefs, all the decision-makers 16 were looking at that, and they were making the decisions in a better informed 17 manner.

18 And so, as a result, those unresolved items that could have 19 been findings, some of them went away, some of them were resolved with 20 violations or whatever, but the understanding was better.

21 When we went into the follow-on inspection that didn't look 22 at environmental qualification, but power operated valves, we had those 23 panels right up front. And so, all that data was available across the regions, 24 everybody was looking at it the same.

100 1 We've done five or six of those inspections so far and we 2 got very good results. People are seeing those the same way, and so, you 3 don't get as many, say, potential findings that are called unresolved or findings 4 that were spent a lot of time on that really aren't findings.

5 COMMISSIONER BARAN: And similar, I guess, it starts to 6 -- one of the other potential drivers you mentioned was increased 7 management oversight of the findings, determination process. I'd be -- it 8 sounds like maybe that might be part of this issue with the cross-regional 9 panels. But how do you see the increased management attention on it 10 affecting the number of findings?

11 MR. MILLER: So --

12 COMMISSIONER BARAN: Tell me a little bit more about 13 that as a driver --

14 MR. MILLER: Yes.

15 COMMISSIONER BARAN: -- for this trend.

16 MR. MILLER: So, when you shine a light on it, you ask a few 17 more questions, so inspectors out in the field comes up with something, 18 they're going to be saying, okay, is this minor or more than minor?

19 They're going to look in 0612 Appendix Echo and look at 20 some of the examples and they're going to run it by their branch chief. And 21 then, if it's -- sometimes the licensees will push back and then, there will be 22 another look, another review that's done.

23 And so, just that amount of work, it's a little extra work, and 24 then an inspector has to decide, is this one really there? Am I on the fence

101 1 with this one or is it worth the effort?

2 We've heard from some inspectors that it may not be worth 3 the effort because it's of low safety significance, just not to continue that. But 4 on the other hand, we've heard from the majority of the inspectors that if it's a 5 finding and if it is of risk significance to pass the minor/more than minor, they're 6 going to process it.

7 So, we don't have a concern that they're not going to 8 process it, but you can imagine that they're thinking about that and that it's an 9 extra level of effort to get to that finding.

10 COMMISSIONER BARAN: Did you want to jump in, Dan?

11 MR. DORMAN: I would just offer, it also, it aligns on the 12 standards and expectations.

13 So, as I'm listening to Chris, I'm actually flashing back about 14 17 years, in the post-9/11 environment, where we were inspecting, doing kind 15 of initial inspections of some of the early security responses to the 9/11 16 attacks. And we had more than an order of magnitude difference between 17 regions on the number of findings on those inspections.

18 And so, really, bringing management of all of the 19 organizations together to align around standards and expectations of what 20 we're looking for in these inspection programs and what really rises to the level 21 of a finding, I think that provides a level of consistency that kind of normalizes.

22 And I know all four of the regions have been coming down 23 in this trend. So, there's not a discrepancy between regions there. But I 24 think as we continue to explore the minor/more than minor threshold, that

102 1 alignment across the organization on standards and expectations is a 2 contributor, I'll say.

3 COMMISSIONER BARAN: Chris, you mentioned that back 4 in 2019, there was a survey of inspectors to get their perspectives on this 5 declining findings trend. And according to the August 2019 memo, some 6 inspectors pointed to increased industry pushback on potential inspection 7 findings as a contributing factor, you actually just mentioned that in the 8 discussion.

9 Has the staff looked at whether industry pushback on 10 findings is contributing to fewer inspection findings? And if so, how that is?

11 MR. MILLER: So, thank you for the question. The staff has 12 looked at the data that show that there is an increased pushback. So, it's not 13 just a thought or an assumption by --

14 COMMISSIONER BARAN: In terms of --

15 MR. MILLER: -- these inspectors.

16 COMMISSIONER BARAN: -- like, formal challenges to 17 potential findings?

18 MR. MILLER: Yes, they're -- those number of challenges are 19 going up. It's a little bit harder to quantify whether those are driving the 20 findings down, but I would go back to our previous discussion, when you have 21 more management oversight, more licensee pushback, you're going to make 22 darn sure that when you go through 0612 guidance that you're right.

23 And so, it's not a bad thing to make sure that we're right in 24 our calls, necessarily, but it's going to take a little bit of extra effort and we're

103 1 going to have that extra site overview, just because you've got that pushback.

2 We need to make sure that -- and we typically try to do that, 3 Commissioner, we'll ask, usually before an inspector exits, they're going to 4 ask licensee management whether or not they agree or they're going to find 5 out whether there's an agreement or not.

6 And so, we're going to do our homework and make sure, 7 double-down and make sure that we're sure of our facts before we carry it 8 forward.

9 COMMISSIONER BARAN: Well, thanks, I appreciate this 10 discussion. I want to, I'm a little bit over time, but I wanted to quickly ask on 11 another issue, Chris, which is, the ROP self-assessment program changes for 12 2020.

13 And under the new approach, the ROP changes that require 14 Commission approval, only those changes would undergo effectiveness 15 reviews, which I could see could potentially leave out some pretty significant 16 changes to the ROP, if we're only doing effectiveness reviews on ones that 17 would be Commission-approved.

18 What was the thinking behind limiting effectiveness reviews 19 to only Commission-approved ROP changes?

20 MR. MILLER: So, Commissioner, thank you for the 21 question. We have looked over the last few years on how to -- we spent quite 22 a lot of hours on the assessment process itself.

23 It is a very -- we feel very confident that it's doing a good job 24 of assessing the ROP, but we're trying to see, is there ways that we can

104 1 reduce that? And so, this would be a way to perhaps reduce the footprint of 2 that assessment process.

3 That was the thinking, but we don't -- we're not locked into 4 that. We could look at those significant ones, but we also could look at others 5 as we have resources to do it. So, it's really a resource management, looking 6 at the most risk-significant things.

7 And if there's time for one that we don't deem as, not as risk-8 significant, to look at it, we will, especially if we're getting feedback from our 9 stakeholders, like the region saying, hey, you really need to look at this area, 10 because we're tripping over this, or something.

11 COMMISSIONER BARAN: All right. So, you have some 12 flexibility there.

13 One ROP change that was approved by the Commission 14 back in 2015 was to increase the number of white findings it takes to enter 15 Column 3 from two white inputs at the same cornerstone to three white inputs 16 in the same cornerstone.

17 One of the main arguments in support of the staff's 18 recommendation at that time to make this change was the belief that the 19 change would result in fewer licensee challenges to potential white findings.

20 Has that been the case? And if not, has the staff 21 considered revisiting that change?

22 MR. MILLER: That's a great question, Commissioner. So, 23 we still see quite a bit of pushback on white findings, to answer that part of 24 your question.

105 1 We have not done our assessment of the switch from two to 2 three, and we plan on doing that this year. In fact --

3 COMMISSIONER BARAN: Okay.

4 MR. MILLER: -- we're putting a team together to do that right 5 now, even as we speak. So, we will look at that. And we'll look and see, did 6 that accomplish the purpose that we put it in there for, the two to three?

7 But to answer the first part of your question again, I think 8 we're still seeing an increase, or not an increase, but certainly a strong industry 9 desire not to get white findings at any particular site, that there's a strong 10 emphasis on white findings.

11 COMMISSIONER BARAN: Well, thanks, I look forward to 12 that analysis. Thank you for your indulgence.

13 CHAIRMAN SVINICKI: Thank you all very much for the 14 presentations today and my colleagues for their thoughtful questions. And 15 with that, if there's nothing further, we are adjourned.

16 (Whereupon, the above-entitled matter went off the record 17 at 11:45 a.m.)