COL Docs - MOV Loss of Motive Force Presentation Material for 10-1-20 Vogtle Units 3 and 4 Public Meeting
ML20273A349
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/29/2020
From:
NRC
To:
NRC/NRR/DNRL
References
Download: ML20273A349 (9)


Text

From:

Schiller, Alina Sent:

Tuesday, September 29, 2020 3:19 PM To:

Vogtle PEmails

Subject:

MOV Loss of Motive Force presentation material for 10-1-20 Vogtle Units 3 and 4 public meeting Attachments:

MOV Loss of Power public call October 1.pptx From: Petrak, Tom G. <TGPETRAK@southernco.com>

Sent: Tuesday, September 29, 2020 2:16 PM To: Schiller, Alina <Alina.Schiller@nrc.gov>

Cc: Arafeh, Yasmeen N. <YNARAFEH@southernco.com>; Gaslevic, James <James.Gaslevic@nrc.gov>;

Welch, Christopher <Christopher.Welch@nrc.gov>; Hall, Victor <Victor.Hall@nrc.gov>; Lopez-Santiago, Omar <Omar.Lopez-Santiago@nrc.gov>

Subject:

[External_Sender] MOV Loss of Motive Force public call presentation material

Alina, Here is the other presentation for this Thursdays public call.

Thomas G. Petrak Vogtle 3&4 ITAAC Manager Southern Nuclear Operating Company 7835 River Road, Bldg. 302 - Waynesboro, GA 30830 (706) 848-1575(o)

(706) 833-7581 (c)

Hearing Identifier:

Vogtle_COL_Docs_Public Email Number:

592 Mail Envelope Properties (BLAPR09MB65949B49CC56D59D8CA295A096320)

Subject:

MOV Loss of Motive Force presentation material for 10-1-20 Vogtle Units 3 and 4 public meeting Sent Date:

9/29/2020 3:19:25 PM Received Date:

9/29/2020 3:19:33 PM From:

Schiller, Alina Created By:

Alina.Schiller@nrc.gov Recipients:

"Vogtle PEmails" <Vogtle.PEmails@nrc.gov>

Tracking Status: None Post Office:

BLAPR09MB6594.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 741 9/29/2020 3:19:33 PM image001.png 3937 MOV Loss of Power public call October 1.pptx 1952728 Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

VEGP 3&4 Motor Operated Valve Loss of Motive Power Verification October 1, 2020

MOV Loss of Power Verification There are 10 ITAAC that perform a Loss of Power Verification that include MOVs:

47 265 118 301 138 382 206 470 250 700

Example of Loss Power ITAAC ITAAC 118

Current MOV Test Verification

  • MOVs are either positioned to the Open or Closed position depending on the valve being tested.
  • Power supply to the MOV is opened
  • MOV is verified to not change position

Proposed MOV Test Verification

  • Use MOV setup work order to verify proper operation of the MOV
  • Setup work order verifies proper operation of the Open and Close contactors.
  • Verification that the Open and Close contactors operate properly ensures that upon a loss of power to the MOV, that the MOV will fail As-Is. Power to operate the valve motor come through contacts from the Open and Close contactors.