From:
Schiller, Alina Sent:
Tuesday, September 29, 2020 3:19 PM To:
Vogtle PEmails
Subject:
MOV Loss of Motive Force presentation material for 10-1-20 Vogtle Units 3 and 4 public meeting Attachments:
MOV Loss of Power public call October 1.pptx From: Petrak, Tom G. <TGPETRAK@southernco.com>
Sent: Tuesday, September 29, 2020 2:16 PM To: Schiller, Alina <Alina.Schiller@nrc.gov>
Cc: Arafeh, Yasmeen N. <YNARAFEH@southernco.com>; Gaslevic, James <James.Gaslevic@nrc.gov>;
Welch, Christopher <Christopher.Welch@nrc.gov>; Hall, Victor <Victor.Hall@nrc.gov>; Lopez-Santiago, Omar <Omar.Lopez-Santiago@nrc.gov>
Subject:
[External_Sender] MOV Loss of Motive Force public call presentation material
- Alina, Here is the other presentation for this Thursdays public call.
Thomas G. Petrak Vogtle 3&4 ITAAC Manager Southern Nuclear Operating Company 7835 River Road, Bldg. 302 - Waynesboro, GA 30830 (706) 848-1575(o)
(706) 833-7581 (c)
Hearing Identifier:
Vogtle_COL_Docs_Public Email Number:
592 Mail Envelope Properties (BLAPR09MB65949B49CC56D59D8CA295A096320)
Subject:
MOV Loss of Motive Force presentation material for 10-1-20 Vogtle Units 3 and 4 public meeting Sent Date:
9/29/2020 3:19:25 PM Received Date:
9/29/2020 3:19:33 PM From:
Schiller, Alina Created By:
Alina.Schiller@nrc.gov Recipients:
"Vogtle PEmails" <Vogtle.PEmails@nrc.gov>
Tracking Status: None Post Office:
BLAPR09MB6594.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 741 9/29/2020 3:19:33 PM image001.png 3937 MOV Loss of Power public call October 1.pptx 1952728 Options Priority:
Normal Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
VEGP 3&4 Motor Operated Valve Loss of Motive Power Verification October 1, 2020
MOV Loss of Power Verification There are 10 ITAAC that perform a Loss of Power Verification that include MOVs:
47 265 118 301 138 382 206 470 250 700
Example of Loss Power ITAAC ITAAC 118
Current MOV Test Verification
- MOVs are either positioned to the Open or Closed position depending on the valve being tested.
- Power supply to the MOV is opened
- MOV is verified to not change position
Proposed MOV Test Verification
- Setup work order verifies proper operation of the Open and Close contactors.
- Verification that the Open and Close contactors operate properly ensures that upon a loss of power to the MOV, that the MOV will fail As-Is. Power to operate the valve motor come through contacts from the Open and Close contactors.