ML20268A132
From kanterella
Jump to navigation
Jump to search
ML20268A132 | |
Person / Time | |
---|---|
Site: | Saint Lucie ![]() |
Issue date: | 09/11/2020 |
From: | Florida Power & Light Co |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML20268A114 | List:
|
References | |
L-2020-123 | |
Download: ML20268A132 (270) | |
Similar Documents at Saint Lucie | |
---|---|
Category:Drawing
MONTHYEARL-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024
[Table view]Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results ML20268A1322020-09-11011 September 2020 Amendment 26 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML20268A1262020-09-11011 September 2020 Amendment 26 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML20268A1292020-09-11011 September 2020 Amendment 26 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems ML20268A1222020-09-11011 September 2020 Amendment 26 to Updated Final Safety Analysis Report, Chapter 2, Section 2.5A, Section 3, Intermediate Zone ML20268A1212020-09-11011 September 2020 Amendment 26 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2.5A, Boring Logs & Data Summaries ML20268A1282020-09-11011 September 2020 Amendment 26 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML18123A2442018-05-13013 May 2018 Stress Model Drawing of Final Element Analysis for Flued Head, Penetration Number 5 ML18127A9062018-05-0707 May 2018 Drawing SK-8770-AS-154, Sheet 1, Neutron Shield, Water Bag Support Steel Framing ML18127B3742018-05-0707 May 2018 Drawing 8770-G-272, Main One Line Wiring Diagram ML18127B3422018-05-0707 May 2018 Drawing 8770-C-227, Sheet 1, Reactor Audiliary Building Instrument Arrangement ML18127B4832018-05-0707 May 2018 Drawing 8770-G-078, Sheet 110B, Flow Diagram, Reactor Coolant System ML18127A9082018-05-0707 May 2018 Drawing SK-8770-AS-154, Sheet 2, Neutron Shield - Water Bag Support Steel Framing ML18127A9172018-05-0707 May 2018 Figure 10.4.9B-5, Fault Tree of SB - Manual ML18127B4592018-05-0707 May 2018 Drawing 8770-G-149, Sheet 2 of 2, Main Steam & Feedwater Piping - Sect & Details ML18127A9222018-05-0707 May 2018 Figure 2.1-4, Property Plan ML18127B3442018-05-0707 May 2018 Drawing 8770-G-394, Typical Auxiliary Building Cable Tray and Conduit Runs. Sheet 1 ML18127B3432018-05-0707 May 2018 Drawing 8770-G-227, Reactor Auxiliary Building Instrument Arrangement. Sheet 3 ML18127A9052018-05-0707 May 2018 Figure 1.2-15, Drawing 8770-G-072, Sheet 1, General Arrangement, Reactor Auxiliary Building Sections ML18127B3462018-05-0707 May 2018 Drawing 8770-G-393, Typical Reactor Auxiliary Building Cable Tray and Conduit Runs. Sheet 3 ML18127B3452018-05-0707 May 2018 Drawing 8770-G-392, Typical Reactor Auxiliary Building Cable Tray and Conduit Runs. Sheet 2 ML18123A2482018-05-0303 May 2018 Stress Model Drawing of Final Element Analysis for Flued Head, Penetration Number 40 ML18123A2332018-05-0303 May 2018 Figure 7.3-3, ESFAS Actuation Cabinet Schematic Diagram ML18123A2472018-05-0303 May 2018 Stress Model Drawing of Final Element Analysis for Flued Head, Penetration Number 36 ML18123A2412018-05-0303 May 2018 Stress Model Drawing of Finite Element Analysis for Flued Head, Penetration Number 1 & 2 ML18123A2462018-05-0303 May 2018 Stress Model Drawing of Final Element Analysis for Flued Head, Penetration Number 26 ML16116A1572016-03-17017 March 2016 Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-085, Rev. 58, Sheet 2B L-2016-085, St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-085, Rev. 58, Sheet 2B2016-03-17017 March 2016 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-085, Rev. 58, Sheet 2B ML16116A1502016-01-28028 January 2016 Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-082, Rev. 56, Sheet 1 ML16116A1552016-01-28028 January 2016 Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-087, Rev. 39, Sheet 1 L-2016-085, St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-087, Rev. 39, Sheet 12016-01-28028 January 2016 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-087, Rev. 39, Sheet 1 L-2016-085, St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-082, Rev. 56, Sheet 12016-01-28028 January 2016 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-082, Rev. 56, Sheet 1 ML16116A1452016-01-12012 January 2016 Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-19729, Rev. 3 L-2016-085, St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-19729, Rev. 32016-01-12012 January 2016 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-19729, Rev. 3 ML16116A1592016-01-0606 January 2016 Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-085, Rev. 32, Sheet 3 L-2016-085, St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-085, Rev. 32, Sheet 32016-01-0606 January 2016 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-085, Rev. 32, Sheet 3 ML16116A1662015-12-30030 December 2015 Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-862, Rev. 33 L-2016-085, St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-862, Rev. 332015-12-30030 December 2015 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-862, Rev. 33 ML16116A1422015-12-0404 December 2015 Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-21367, Rev. 3 L-2016-085, St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-21367, Rev. 32015-12-0404 December 2015 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-21367, Rev. 3 ML16116A1272015-11-12012 November 2015 Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-663, Rev. 10, Sheet 1 L-2016-085, St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-663, Rev. 10, Sheet 12015-11-12012 November 2015 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-663, Rev. 10, Sheet 1 ML16116A1282015-10-26026 October 2015 Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-149, Rev. 17, Sheet 2 of 2 L-2016-085, St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-149, Rev. 17, Sheet 2 of 22015-10-26026 October 2015 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-149, Rev. 17, Sheet 2 of 2 L-2016-085, St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-078, Rev. 13, Sheet 111B2015-10-26026 October 2015 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-078, Rev. 13, Sheet 111B ML16116A1392015-10-26026 October 2015 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-078, Rev. 13, Sheet 111B ML16116A1292015-10-21021 October 2015 Updated Final Safety Analysis Report Amendment No. 23, Drawing 3509-G-115, Rev. 26, Sheet 2 L-2016-085, St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 3509-G-115, Rev. 26, Sheet 22015-10-21021 October 2015 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 3509-G-115, Rev. 26, Sheet 2 L-2016-085, St. Lucie, Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-079, Rev. 4, Sheet 72015-10-19019 October 2015 St. Lucie, Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-079, Rev. 4, Sheet 7 ML16116A1212015-10-19019 October 2015 Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-079, Rev. 4, Sheet 7 2024-10-15 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML23254A1672023-09-0606 September 2023
[Table view]Amendment 28 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses ML23254A1602023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML23254A1642023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML23254A1622023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML23254A1772023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML23254A1612023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2.5A, Boring Logs & Data Summaries ML23254A1732023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 18, Aging Management Programs and Time-Limited Aging Analyses Activities ML23249A1922023-09-0606 September 2023 Submittal of Amendment 28 to Updated Final Safety Analysis Report and License Renewal 10CFR54.37(b) Report L-2023-109, Amendment 28 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant2023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML23254A1792023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML23254A1812023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program ML23254A1722023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML23254A1762023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, List of Table of Contents ML23254A1662023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 15.6, Decrease in Reactor Coolant Inventory ML23254A1592023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2.5A, Section 3, Intermediate Zone (60-150 Ft) ML23254A1822023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML23254A1682023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML23254A1712023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 6, Section 6.3 Emergency Core Cooling System ML23254A1742023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML23254A1802023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML23254A1632023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML23254A1782023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems ML23205A1262023-08-0303 August 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics (Public) ML23208A0092023-04-0303 April 2023 Unit 1 Amendment 32 to Updated Final Safety Analysis Report, Cover Letter ML23096A0282023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML23096A0272023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 9.5A, Fire Protection Program Report ML23096A0342023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems ML23096A0362023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML23096A0392023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis, Volume 2 ML23096A0332023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 18, Aging Management Programs and Time-Limited Aging Analyses Activities ML23096A0452023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML23096A0252023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML23096A0302023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis, Volume 1 ML23096A0262023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML23096A0402023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML23096A0442023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management System ML23096A0322023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program ML23096A0312023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML23096A0422023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML23096A0432023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant Site Characteristics ML23096A0352023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML23096A0412023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML23096A0372023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System ML22111A1152022-03-0404 March 2022 Amendment 27 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22111A1202022-03-0404 March 2022 Amendment 27 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML22111A1172022-03-0404 March 2022 Amendment 27 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML22111A1122022-03-0404 March 2022 Amendment 27 to Updated Final Safety Analysis Report, Chapter 6, Section 6.3, Emergency Core Cooling System ML22111A1162022-03-0404 March 2022 Amendment 27 to Updated Final Safety Analysis Report, List of Effective Sections ML22111A1192022-03-0404 March 2022 Amendment 27 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features 2023-09-06 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20268A132&oldid=3850446"