ML23096A028
| ML23096A028 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 04/01/2023 |
| From: | Florida Power & Light Co |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML23096A089 | List: |
| References | |
| Download: ML23096A028 (1) | |
Text
LIST OF EFFECTIVE PAGES CHAPTER 17 QUALITY ASSURANCE Page Amendment Page Amendment 17-1 28 17-i 12 17.1-1 0
17.2-1 22 UNIT 1 17-1 Amendment No. 28 (05/17)
QUALITY ASSURANCE CHAPTER 17 TABLE OF CONTENTS Section Title Page 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION 17.1-1 17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE 17.2-1 17-i Amendment No. 12, (12/93)
CHAPTER 17 QUALITY ASSURANCE 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION This section is not applicable to the FSAR.
17.1-1
17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE Reference 1, FPL Quality Assurance Topical Report (QATR), describes the methods and establishes quality assurance program and administrative control requirements which comply with the criteria of 10 CFR 50 Appendix B, and meets the requirements of Regulatory Guides and industry standards.
Reference 2 transmitted the NRC Safety Evaluation that documented approval of the QATR at St. Lucie.
NOTE: All future proposed changes to this section shall be reviewed/evaluated pursuant to 10 CFR 50.54(a).
REFERENCES
- 1.
Florida Power and Light Company, FPL Energy Seabrook, LLC, and FPL Energy Duane Arnold, LLC Quality Assurance Topical Report, FPL-1.
- 2.
B.T. Moroney (NRC) to J.A. Stall (FPL), Florida Power and Light Company, FPL Energy Seabrook, LLC, and FPL Energy Duane Arnold, LLC - Approval of Common Quality Assurance Topical Report, December 29, 2006.
17.2-1 Amendment No. 22 (05/07)