ML20265E430
From kanterella
Jump to navigation
Jump to search
ML20265E430 | |
Person / Time | |
---|---|
Site: | Nine Mile Point |
Issue date: | 12/19/1985 |
From: | GENERAL ELECTRIC CO. |
To: | NIAGARA MOHAWK POWER CORP. |
Shared Package | |
ML18038A101 | List:
|
References | |
731E788TY, NUDOCS 8512310340 | |
Download: ML20265E430 (1) | |
Similar Documents at Nine Mile Point | |
---|---|
Category:DRAWINGS
MONTHYEARML20266H7631995-05-25025 May 1995
[Table view]Emergency RPV Depressurization Steam Cooling Primary Containment Flooding ML18040A1331994-05-0101 May 1994 Shroud Data.Sheet 1 of 1 ML20261L8951993-02-0505 February 1993 Drywell & Torus Isolation Valves ASME Section XI Boundary Diagram.Sheet 1 ML20261L9021993-02-0505 February 1993 Control Rod Drive ASME Section XI Boundary Diagram.Sheet 1 ML20261L8911992-11-0202 November 1992 Weld Map Reactor Vessel.Sheet 28A ML20261L8881992-11-0202 November 1992 Weld Map Reactor Vessel.Sheet 28 ML20261L8841992-08-17017 August 1992 Weld Map Systems 41 and 42 Liquid Poison.Sheet 26 ML20261L8761992-07-30030 July 1992 Weld Map System 80.1 Reactor Containment Spray.Sheet 25 ML20261L8791992-07-30030 July 1992 Weld Map System 80.1 Reactor Containment Spray.Sheet 25A ML20261L8691992-07-29029 July 1992 Weld Map System 66 Main Steam Power Operated Relief Valve Discharge.Sheet 24 ML20261L8731992-07-24024 July 1992 Weld Map System 66 Main Steam Power Operated Relief Valve Discharge.Sheet 24A ML20261L8661992-06-0808 June 1992 Weld Map System 23 Main Steam Line Drain.Sheet 23 ML20261L8591992-04-30030 April 1992 Weld Map Systems 05 05.1 and 05.2 Emergency Condenser Vent. Sheet 22 ML20261L8621992-04-30030 April 1992 Weld Map Systems 05,05.1 and 05.2 Emergency Condenser Vent. Sheet 22A ML20261L6851992-02-24024 February 1992 Weld Map System OI Main Steam.Sheet 2 ML20261L8021992-02-24024 February 1992 Weld Map Systems 81 and 81.1 Reactor Core Spray.Sheet 13C ML20261L7711992-02-24024 February 1992 Weld Map System 38 Reactor Shutdown Cooling.Sheet 10A ML20261L8091992-02-24024 February 1992 Weld Map System 80 Reactor Containment Spray.Sheet 15 ML20261L7441992-02-24024 February 1992 Weld Map System 36 Reactor Instrumentation Wide Range Level. Sheet 8D ML20261L8551992-02-24024 February 1992 Weld Map Systems 33,33.2 & 33.3 Reactor Clean Up.Sheet 20 ML20261L7421992-02-24024 February 1992 Weld Map System 36 Reactor Instrumentation Level Protection System.Sheet 8C ML20261L8391992-02-24024 February 1992 Weld Map System 44.2 Control Rod Drive.Sheet 17 ML20261L8231992-02-24024 February 1992 Weld Map System 80 Reactor Containment Spray.Sheet 15D ML20261L7251992-02-24024 February 1992 Weld Map System 32 Reactor Recirculation Pump Instrumentation.Sheet 7C ML20261L7511992-02-24024 February 1992 Weld Map System 36 Reactor Instrumentation Level Triple Low. Sheet 8F ML20261L6941992-02-24024 February 1992 Weld Map System 02 Main Steam.Sheet 3 ML20261L7911992-02-24024 February 1992 Weld Map Systems 81 and 81.1 Reactor Core Spray.Sheet 13 ML20261L6811992-02-24024 February 1992 Weld Map Index.Sheet 1 ML20261L6911992-02-24024 February 1992 Weld Map System OI Main Steam.Sheet 2B ML20261L7581992-02-24024 February 1992 Weld Map System 36 Reactor Instrumentation Emergency Condenser Steam Outlet Elbow Flow Meter.Sheet 8H ML20261L7731992-02-24024 February 1992 Weld Map System 39 Emergency Condenser Steam Supply.Sheet 11 ML20261L7221992-02-24024 February 1992 Weld Map System 32 Reactor Recirculation Pump Discharge Instrumentation.Sheet 7B ML20261L7611992-02-24024 February 1992 Weld Map System 36 Reactor Instrumentation Emergency Condenser Steam Outlet Elbow Flow Meter.Sheet 8J ML20261L7481992-02-24024 February 1992 Weld Map System 36 Reactor Instrumentation Seal Leak Detection.Sheet 8E ML20261L7041992-02-24024 February 1992 Weld Map System 31 Reactor Feedwater.Sheet 5 ML20261L7811992-02-24024 February 1992 Weld Map System 39 Emergency Condenser Drain and Overflow Lines.Sheet 11B ML20261L7281992-02-24024 February 1992 Weld Map System 32 Reactor Recirculation Pump Seal Cavity Instrumentation.Sheet 7D ML20261L8331992-02-24024 February 1992 Weld Map Systems 93 & 93.1 Reactor Containment Spray RAW Water.Sheet 16B ML20261L7351992-02-24024 February 1992 Weld Map System 36 Reactor Instrumentation Level Control Range.Sheet 8A ML20261L8151992-02-24024 February 1992 Weld Map System 80 Reactor Containment Spray.Sheet 15B ML20261L8051992-02-24024 February 1992 Weld Map System 42.1 Liquid Poison.Sheet 14 ML20261L6971992-02-24024 February 1992 Weld Map System 02 Main Steam.Sheet 3A ML20261L7771992-02-24024 February 1992 Weld Map System 39 Emergency Condenser Condensate Return. Sheet 11A ML20261L7871992-02-24024 February 1992 Weld Map Systems 40 and 40.1 Reactor Core Spray.Sheet 12A ML20261L8261992-02-24024 February 1992 Weld Map Systems 93 & 93.1 Reactor Containment Spray RAW Water.Sheet 16 ML20261L7011992-02-24024 February 1992 Weld Map System 03 Main Steam Turbine Bypass to Condenser. Sheet 4 ML20261L8291992-02-24024 February 1992 Weld Map Systems 93 & 93.1 Reactor Containment Spray RAW Water.Sheet 16A ML20261L7641992-02-24024 February 1992 Weld Map Systems 37 and 37.1 Reactor Head Vent and Drain. Sheet 9 ML20261L7681992-02-24024 February 1992 Weld Map System 38 Reactor Shutdown Cooling.Sheet 10 ML20261L8441992-02-24024 February 1992 Weld Map System 44.2 Control Rod Drive.Sheet 17A 1995-05-25 Category:INSTRUMENTATION DRAWINGS-APPLICANT'S FACILITY MONTHYEARML20266E6931986-06-30030 June 1986
[Table view]Iso Dwg Reactor Bldg:Air Cool and Purge Pp (2CPS) Sec Contmt El 215 Ft. Rev Date Illegible ML20266E6351986-06-30030 June 1986 Iso Dwg Reactor Bldg:Nitrogen System Pp (2GSN) Sec Contmt El 261 Ft. Rev Date Illegible ML20266E6041986-06-30030 June 1986 Iso Dwg Reactor Bldg:Nitrogen System Piping (2-GSN) Sc El 240 Ft. Rev Date Illegible. Actual Drawing NUMBER:12177-DP-453AA-2 ML20266E5921986-06-30030 June 1986 Iso Dwg Reactor Bldg:Instrument Air Pp (2IAS) Sec Contmt El 289 Ft. Rev Date Illegible. Actual Drawing NUMBER:12177-DP-340SF-5 ML20266E6511986-06-30030 June 1986 Iso Dwg Reactor Bldg:Nitrogen System Pp (2GSN) Sec Contmt El 289 Ft, as-built.Rev Date Illegible ML20266E6261986-06-30030 June 1986 Iso Dwg Reactor Bldg:Nitrogen System Pp (2GSN) Sec Contmt El 261 Ft. Rev Date Illegible ML20266E6851986-06-30030 June 1986 Iso Dwg Reactor Bldg:Air Cool and Purge Pp (2CPS) Sec Contmt El 215 Ft, as-built.Rev Date Illegible ML20266E6991986-06-30030 June 1986 Iso Dwg Reactor Bldg:Air Cool and Purge Pp (2CPS) Sec Contmt El 215 Ft, as-built.Rev Date Illegible ML20266E6691986-06-30030 June 1986 Iso Dwg Reactor Bldg:Nitrogen System Pp (2GSN) Sec Contmt El 240 Ft. Rev Date Illegible ML20266E6781986-06-30030 June 1986 Iso Dwg Reactor Bldg:Nitrogen System Pp (2-GSN) Sec Contmt El 250 Ft. Rev Date Illegible ML20266E6581986-02-11011 February 1986 Iso Dwg Reactor Bldg:Nitrogen System Pp (2-GSN) Sec Contmt El 289 Ft, as-built ML20266E6611986-02-11011 February 1986 Iso Dwg Reactor Bldg:Nitrogen System Pp (2-GSN) Sec Contmt El 289 Ft ML20266E6181986-02-0707 February 1986 Iso Dwg Reactor Bldg:Nitrogen System Pp (2GSN) Sec Contmt El 289 Ft, as-built ML20266E6081986-02-0707 February 1986 Iso Dwg Reactor Bldg:Nitrogen System Pp (2-GSN) Sec Contmt El 261 Ft, as-built ML20266E6001986-02-0707 February 1986 Iso Dwg Reactor Bldg:Nitrogen System Pp (2GSN) Sec Contmt El 261 Ft, as-built. Actual Drawing NUMBER:12177-DP-453A-10 ML20266E5961986-02-0707 February 1986 Iso Dwg Reactor Bldg:Instr Air Piping (2IAS) Sec Contmt El 289 Ft, as-built. Actual Drawing NUMBER:12177-340SD-6 ML20266E6121986-02-0707 February 1986 Iso Dwg Reactor Bldg:Nitrogen System Pp (2-GSN) Standby Gas Treatment Bldg El 261 Ft, as-built ML20266E6551986-02-0101 February 1986 Iso Dwg Reactor Bldg:Nitrogen System Pp (2-GSN) Sec Contmt El 289 Ft, as-built ML20266E5591986-01-31031 January 1986 Iso Dwg Reactor Bldg:Instrument Air Pp (2IAS) Sec Contmt El 240 Ft. Actual Drawing NUMBER:12177-DP-340JR-5 ML20265E6141985-12-19019 December 1985 Fcd Low Pressure Core Spray Sys ML20265E6691985-12-19019 December 1985 Fcd:Low Pressure Core Spray Sys. Sheet 2.Rev Date Illegible ML20265E4271985-12-19019 December 1985 Fcs:Nuclear Boiler System. Sheet 5.Rev Date Illegible ML20265E6191985-12-19019 December 1985 Fcd Nuclear Boiler System. Sheet 4.Rev Date Illegible ML20265E4301985-12-19019 December 1985 Fcd:Nuclear Boiler System. Sheet 1.Rev Date Illegible ML20266E5761985-10-10010 October 1985 Iso Dwg Reactor Bldg:Instrument Air Pp (2IAS) Sec Contmt El 289 Ft. Actual Drawing NUMBER:12177-DP-340QS-3 ML20266E5631985-10-10010 October 1985 Iso Dwg Reactor Bldg:Instrument Air Pp (2IAS) Sec Contmt El 289 Ft. Actual Drawing NUMBER:12177-DP-340QQ-3 ML20266E5541985-10-10010 October 1985 Iso Dwg Reactor Bldg:Instrument Air Pp (2IAS) Sec Contmt El 289 Ft, as-built ML20265E3541985-08-13013 August 1985 Logic Diagram:Control Building Ventilation (Radn Mon). Actual Drawing NUMBER:12177-LSK-22-9.1H.ACTUAL Rev Status: 9M ML20265E4391985-08-0202 August 1985 Fcd:Nuclear Boiler System. Sheet 3 ML20265E6091985-05-23023 May 1985 Fcd Reactor Water Cleanup Sys. Sheet 1 ML20266E6731985-03-0505 March 1985 Iso Dwg Reactor Bldg:Nitrogen System Pp (2GSN) Sec Contmt El 289 Ft ML20266E5841985-01-31031 January 1985 Iso Dwg Reactor Bldg:Instrument Air Pp (2IAS) Sec Contmt El 289 Ft, as-built. Actual Drawing NUMBER:12177-340SA-5 ML20263P6561984-03-26026 March 1984 Reac Bldg - Suppr Pool - Sched & Locn of Instrument Penetrations. Rev Date Illegible ML20263P4091984-03-26026 March 1984 Radiation Monitoring System:Reactor Building El 175 Ft. Rev Date Illegible ML20265E4341984-02-10010 February 1984 Fcd:Nuclear Boiler System. Sheet 2 ML20263P4141984-01-16016 January 1984 Radiation Monitoring System:Reactor Building El 215 Ft ML20263P1731983-12-0909 December 1983 Radiation Monitoring:Radwaste Building Plan El 291 Ft 6 Inches,279 Ft & 309 Ft ML20263P1691983-12-0909 December 1983 Radiation Monitoring:Radwaste Building Plan El 240/245 Ft & 261/265 Ft ML20263N8151983-10-18018 October 1983 Arrangement:Reactor Core Cooling Control Board - 2CEC*PNL601. Actual Drawing NUMBER:12177-ESK-4CEC13B ML20266E6431983-08-31031 August 1983 Iso Dwg Reactor Bldg:Nitrogen System Pp (2-GSN) Sec Contmt El 261 Ft ML20265E3731983-02-11011 February 1983 Logic Diagram:Standby Diesel Generator Load Sequence. Actual Drawing NUMBER:12177-LSK-24-9.4A.ACTUAL Rev Status: M5 ML20264B0741982-03-0909 March 1982 Control Switch Contact Diagrams. Sheet 6 ML20264B0641982-03-0909 March 1982 Control Switch Contact Diagram. Sheet 1 ML20264B0701982-03-0909 March 1982 Control Switch Contact Diagrams. Sheet 3 ML20264B0761982-03-0909 March 1982 Control Switch Contact Diagram. Sheet 8 ML20264B0781982-03-0404 March 1982 Control Switch Contact Diagram. Sheet 7 ML20264B0661982-03-0404 March 1982 Control Switch Contact Diagrams. Sheet 2 ML20264B0721982-03-0404 March 1982 Control Switch Contact Diagrams. Sheet 5 ML20264B0801982-03-0404 March 1982 Control Switch Contact Diagram. Sheet 10 ML20264B1101982-01-0606 January 1982 Arrangement:Div II Aux Relay Panel 2CEC*PNL861. Consists of Two Aperture Cards. Actual Drawing NUMBER:12177-ESK-4CEC30A 1986-06-30 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20265E430&oldid=3855570"