Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20266H763 | 25 May 1995 | Emergency RPV Depressurization Steam Cooling Primary Containment Flooding | |
ML18040A133 | 1 May 1994 | Nine Mile Point 2 Shroud Data.Sheet 1 of 1 | |
ML20261M169 | 19 June 1991 | Logic Diagram Main Steam | |
ML20261D350 | 22 April 1991 | Reactor Bldg Refueling - Cavity Closures Cover Support Frames Plan Sections & Details.Rev Date Illegible | |
ML20261D333 | 22 April 1991 | Reactor Bldg Drywell Refueling Seal Bellows.Rev Date Illegible | |
ML20261D345 | 1 February 1991 | Reactor Bldg Refueling Seal Platform Sections & Details | |
ML20261D337 | 9 July 1990 | Reactor Bldg Refueling Seal Platform Plan Section & Details. Sheet 1 of 2 | |
ML20261D342 | 9 July 1990 | Reactor Bldg Refueling Seal Platform Aluminum Covers.Sheet 2 of 2 | |
ML20260K847 | 9 September 1989 | Closed LOOP Cooling Service Water and Screen Wash Trubine Bldg and Screen House P & I Diagram. Sheet 2 of 4 | |
ML20260K843 | 9 September 1989 | Closed LOOP Cooling Service Water and Screen Wash Turbine Bldg and Screen House P & I Daigram. Sheet 1 of 4 | |
ML20260K856 | 5 August 1989 | Closed LOOP Cooling & Service Water Reactor & Waste Bldg P & I Diagram. Sheet 4 of 4 | |
ML20260K840 | 2 June 1989 | Reactor Core Spray P & I Diagram | |
ML20260K851 | 29 March 1989 | Closed LOOP Cooling & Service Water Reactor & Waste Bldg'S P & I Diagram. Sheet 3 of 4 | |
ML20259D063 | 8 December 1988 | Turbine Bldg Condensate Storage & Surge Tank. Rev Date Illegible | |
ML20259D068 | 8 December 1988 | 2 Aluminum Cone Roof Condensate Storage Tanks 30-OD & 42 Hg | |
ML20259D040 | 8 December 1988 | Reactor Bldg Core Spray Piping Plan at El 198 Ft & 218 Ft. Rev Date Illegible | |
ML17055E060 | 28 July 1988 | Reactor Bldg Instrument Room El 237.0 Feet Instrument Piping Upper Plan & Section 4-4. Rev Date Illegible | |
ML17055E062 | 28 July 1988 | Reactor Bldg Closed LOOP Cooling Sys Piping at Reactor Recirc Pumps & Motors Section 1-1. Rev Date Illegible | |
ML17055E055 | 28 July 1988 | 14 List 800 Bolted Bonnet WE 0.5 Valve with Flexitill Bonnet Joint and Smb - Limitorque Unit. Rev & Rev Date Illegible | |
ML17055E063 | 28 July 1988 | Reactor Bldg Drywell & Torus Continuous Leak Rate Monitoring Sys Lowering Instr RM El 237.0 Feet. Rev & Rev Date Illegible | |
ML17055E064 | 28 July 1988 | Reactor Bldg East Instr Room El 284 FEET-0 Inches Instrumentation & Misc Piping. | |
ML17055E065 | 28 July 1988 | Reactor Building Emergency Condenser Piping Penetration Details X-34 & X-38 10 Feet Steam Supply. Sheet 1 of 3 | |
ML17055E068 | 28 July 1988 | Reactor Bldg Breathing Air & House Service Air. | |
ML17055E069 | 28 July 1988 | Reactor Bldg Liquid Poison System Sections 1-1,2-2,3-3,4-4 & 5-5. Rev Date Illegible | |
ML17055D992 | 6 July 1988 | Elementary Wiring Diagram 4160 Volt Power Board II Control Circuits (Reactor Recirculation). Sheet 5 | |
ML20261M126 | 24 February 1988 | Plant Master One Line Diagram Emergency Power Distribution | |
ML20261M140 | 24 February 1988 | Plant Master One Line Diagram Normal 600V & 120VAC | |
ML20259D048 | 11 February 1988 | Reactor Core Spray Sys 81 & 81.1 Piping Isometric from Torus to Topping Pumps & from Topping Pumps to Ext Isolation Valves. Sheet 3 | |
ML20259D044 | 11 February 1988 | Reactor Core Spray Sys 81 & 81.1 Piping Isometric from Torus to Topping Pumps to Ext Isolation Valves. Sheet 2 | |
ML17055D989 | 18 December 1987 | Elementary Wiring Diagram Anticipated Transient Without SCRAM Channel No 11. Sheet 1 | |
ML17055D991 | 18 December 1987 | Elementary Wiring Diagram Anticipated Transient Without SCRAM Alternate Rod INJECTION-D.C. Valve Logic Channel No 11. Sheet 3 Final | |
ML17055D990 | 18 December 1987 | Elementary Wiring Diagram Anticipated Transient Without SCRAM Channel No 12. Sheet 2 | |
ML17055D986 | 17 December 1987 | Functional Line Diagram Anticipated Transient Without SCRAM Channel 11 & 12. Sheet 1 | |
ML17055D988 | 17 December 1987 | Functional Line Diagram Anticipated Transient Without SCRAM Channel 11 & 12. Sheet 2 Final | |
ML17055D993 | 17 December 1987 | Control Board Panel F Design Layout. Sheet 1 | |
ML17055E058 | 4 December 1987 | Reactor Bldg Instrument Room El 237.0 Feet Instrument Piping Section 11-11,12-12,13-13. Sheet 6 | |
ML20259D056 | 24 November 1987 | Condensate Flow P&I Diagram | |
ML17055E061 | 29 October 1987 | Reactor Building Sampling Sample Station Details, as-built | |
ML20259D037 | 28 August 1987 | Reactor Core Spary Sys 40 Piping Isometric from External Isolation Valve to Reactor | |
ML20266J829 | 4 August 1987 | Piping & Instrumentation Diagram Symbols. Issue Date Illegible. Actual Drawing NUMBER:12177-PID-0-2B-1 | |
ML20266J832 | 4 August 1987 | Piping & Instrumentation Diagram Symbols. Issue Date Illegible. Actual Drawing NUMBER:12177-PID-0-2D-1 | |
ML20266J830 | 4 August 1987 | Piping & Instrumentation Diagram Symbols. Issue Date Illegible. Actual Drawing NUMBER:12177-PID-0-2C-1 | |
ML20266J828 | 4 August 1987 | Piping & Instrumentation Diagram Symbols. Issue Date Illegible. Actual Drawing NUMBER:12177-PID-0-2A-1 | |
ML20266J776 | 16 June 1987 | Piping & Instrumentation Diagram High Pressure Core Spray System. Issue 6 | |
ML20266J869 | 16 June 1987 | Piping & Instrumentation Diagram Instrument & Service Air. Issue 6 | |
ML20266J809 | 16 June 1987 | Piping & Instrumentation Diagram Primary Containment Purge & Standby Gas Treatment. Issue 7 | |
ML20266J772 | 16 June 1987 | Piping & Instrumentation Diagram LOW Pressure Core Spray. Issue 6 | |
ML20266J853 | 16 June 1987 | Piping & Instrumentation Diagram Service Water System. Issue 7 | |
ML20266J773 | 16 June 1987 | Piping & Instrumentation Diagram High Pressure Core Spray System. Issue 7 | |
ML20266J803 | 12 June 1987 | Piping & Instrumentation Diagram Control Building Chilled Water. Issue 5 |