50 - 3G
,pn**:o y
UNITED STATES j
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30seHo01 June 17,1998 Mr. H. L. Sumner, Jr.
l
{
Vice President - Nuclear i
Hatch Project Southern Nuclear Operating Company, Inc.
Post Office Box 1295 Birmingham, Alabama 35201-1295
SUBJECT:
COMPLETION OF LICENSING ACTION FOR GENERIC LETTER 97 EDWIN 1. HATCH NUCLEAR PLANT, UNIT 2 (TAC NO. M99997)
Dear Mr. McCoy:
)
The U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 97-04, " Assurance of Sufficient Net Positive Suction Head for Emergency Core Cooling and Containment Heat Removal Pumps," to all holders of operating licenses or construction permits on October 7, l
1997. Tne NRC issued GL 97-04 to confirm the adequacy of the net positive suction head (NPSH) available for emergency core cooling (including core spray and decay heat removal) and containment heat removal pumps under all design-basis accident scenarios.
In GL 97-04, the NRC staff specifically requested that licensees provide the information outlined below for each of their facilities.
- 1. Specify the general methodology used to calculate the head loss associated with the Emergency Core Cooling System suction strainers.
- 3. Specify whether the current design-basis NPSH analysis differs from the most recent
/
analysis reviewed and approved by the NRC for which a safety evaluation was issued.
o
- 4. Specify whether containment overpressure (i.e., containment pressure above the vapor pressure of the sump or suppression pool fluid) was credited in the calculation of available
/
NPSH. Specify the amount of overpressure needed and the minimum overpressure available.
- 5. When containment overpressure is credited in the calculation of available NPSH, confirm that an appropriate containment pressure analysis was done to establish the minimum containment pressure.
{
.u5 NE Ed EM8 MW 9806180252 980617 PDR ADOCK 05000366 P
PM J
g H. L. Sumner, Jr. June 17,1998 In response to GL 97-04, you provided letters dated October 28 and December 30,1997, for Hatch Nuclear Plant, Unit 2. These submittals provided the information requested by GL 97-04.
The staff has reviewed your response and has concluded that all requested information has been provided; therefore, we consider GL 97-04 closed for Unit 2. We appreciate your prompt and complete response.
If you have any questions regarding this matter, please contact Leonard N. Olshar, at 301-415-1419.
Sincerely, ORIGINAL SIGNED BY:
Leonard N. Olshan, Senior Project Manager Project Directorate ll-2 Divlsion of Reactor Projects -l/li Office of Nuclear Reactor Regulation Docket No. 50-366 J
cc: See next page DISTRIBUTION-PSkinner, Ril I
Docket File PUBLIC PD ll-2 Reading File JZwolinski LOlshan HBerkow
)
LBerry LPlisco, Ril ACRS OGC DSkay, Lead PM JKudrick, NRR KKavanagh, NRR LPlisco, Ril DOCUMENT NAME: G:\\ HATCH \\9704.LTR To receive a copy of this document, indicate in the box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy *See previous concurrence OFFICE PM:PDil-2*
LA:PDll-2*
SRXB:NRR*
SCSB:NRR*
D:PDlJt s 2
NAME LOlshan:cn LBerry RCaruso JKudrick HBer$vL)
DATE 6/11/98 6/10/98 6/12/98 6/13/98 6 /r48 OFFICIAL RECORD COPY l
-J
H. L. Sumner, Jr. In response to GL 97-04, you provided letters dated October 28 and December 30,1997, for Hatch Nuclear Plant, Unit 2. These submittals provided the information requested by GL 97-04.
The staff has reviewed your response and har, concluded that all requested information has been provided; therefore, we consider GL 97 04 closed for Unit 2. We appreciate your prompt and complete response, if you have any questions regarding this matter, please contact Leonard N. Olshan at 301-415-1419.
Sincerely, Leonard N. Olshan, Senior Project Manager Project Directorate ll-2 Division of Reactor Projects - t/11 Office of Nuclear Reactor Regulation Docket No. 50-366 I
cc: See next page I
l 1
1 l
________i_________
- O Edwin 1. Hatch Nuclear Plant cc:
Charles A. Patrizia, Esquire Mr. Ernest L. Blake, Jr.
Paul, Hastings, Janofsky & Walker
. Shaw, Pittman, Potts 10th Floor and Trowbridge 1299 Pennsylvania Avenue 2300 N Street, NW.
Washington, DC 20004-9500 Washington, DC 20037 Chairman Mr. D. M. Crowe Appling County Commissioners Manager, Licensing County Courthouse Southern Nuclear Operating Baxley, Georgia 31513 Company, Inc.
P. O. Box 1295 Mr. J. D. Woodard Birmingham, Alabama 35201-1295 Executive Vice President Southem Nuclear Operating Resident inspector Company, Inc.
Plant Hatch P. O. Box 1295 11030 Hatch Parkway N.
Birmingham, Alabama 35201-1295 Baxley, Georgia 31531 Mr. P. W. Wells Regional Administrator, Region ll General Manager, Edwin 1. Hatch U.S. Nuclear Regulatory Commissio 1 Nuclear Plant Atlanta Federal Center Southern Nuclear Operating 61 Forsyth Street, SW, Suite 23T85 Company, Inc.
Atlanta, Georgia 30303 U.S. Highway 1 North -
P. O. Box 2010 Mr. Charles H. Badger Baxley, Georgia 31515 Office of Planning and Budget Room 610 Mr. R. D. Barker 270 Washington Street, SW..
Program Manager Atlanta, Georgia 30334 Fossil & Nuclear Operations Oglethorpe Power Corporation
.{
Harold Reheis, Director 2100 East Exchange Place Department of Natural Resources P. O. Box 1349 205 Butler Street, SE., Suite 1252 Tucker, Georgia 30085-1349 Atlanta, Georgia 30334 i
- Steven M. Jackson Senior Engineer-Power Supply Municipal Electric Authority i
of Georgia 1470 Riveredge Parkway, NW
' Atlanta, Georgia 30328-4684 i
L