- - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _
t lcarg\\
g UNITED STATES jp -,fq/gP NUCLEAR REGULATORY COMMISSION WASHINGTON, D.c. SegeHepi l
June 5, 1998 Mr. Lew W. Myers Vice President - Nuclear, Perry Centerior Service Company P.O. Box 97, A200 Perry, OH 44081
SUBJECT:
COMPLETlON OF LICENSING ACTION FOR GENERIC LETTER 97 i PERRY NUCLEAR POWER PLANT, UNIT NO.1 (TAC NO. MA0027) l
Dear Mr. Myers:
The U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 97-04, " Assurance
)
of Sufficient Net Positive Suction Head for Emergency Core Cooling and Containment Heat Removal Pumps," to all holders of operating licenses or construction permits on October 7, f
l 1997. The NRC issued GL 97-04 to confirm the adequacy of the net positive suction head (NPSH) available for emergency core cooling (including core spray and decay heat removal) and containment heat removal pumps under all design-basis accident scenarios.
3 in GL 97-04, the NRC staff specifically requested that licensees provide the information outlined below for each of their facilities.
- 1. Specify the general methodology used to calculate the head loss associated with the ECCS suction strainers.
- 3. Specify whether the current design-basis NPSH analysis differs from the most recent analysis reviewed and approved by the NRC for which a safety evaluation was issued.
- 4. Specify whether containment overpressure (i.e... containment pressure above the vapor pressure of the sump or suppression pool fluid) was credited in the calculation of available NPSH. Specify the amount of overpressure needed and the minimum overpressure available.
- 5. When containment overpressure is credited in the calculation of available NPSH, confirm that an appropriate containment pressure analysis was done to establish the minimum containment pressure.
\\
l l
, g 'g
+
9906120350 990605 f
MK O y
u
~
J L. Myers June 5,1998 in response to GL 97-04, you provided letters dated November 6,1997 (PY-CEl/NRR-2233L),
and January 5,1998 (PY-CEl/NRR-2246L), for the Perry Nuclear Power Plant, Unit No.1 (PNPP). These submittals provided the information requested by GL 97-04. The staff has reviewed your response and has concluded that all requested information has been provided; therefore, we consider GL 97-04 closed for PNPP. Thank you for your prompt and complete response.
Sincerely, wA v ?M Douglas V. Pickett, Senior Project Manager Project Directorate ill-3 Division of Reactor Projects Ill/IV Office of Nuclear Reactor Regulation Docket No. 50-440 cc: See next page
l.
i L. Myers
-2 June 5, 1998 In response to GL 97-04, you provided letters dated November 6,1997 (PY-CEl/NRR-2233L),
and January 5,1998 (PY-CEl/NRR-2246L), for the Perry Nuclear Power Plant, Unit No.1 (PNPP). These submittals provided the information requested by GL 97-04. The staff has reviewed your response and has concluded that all requested information has been provided; I
therefore, we consider GL 97-04 closed for PNPP. Thank you for your prompt and complete
)
response.
i i
Sincerely, Original signed by:
Douglas V. Pickett, Senior Project Manager Project Directorate 111-3 Division of Reactor Projects Ill/IV Office of Nuclear Reactor Regulation Docket No. 50-440 cc: See next page 4
DISTRIBUTION:
Docket File PUBLIC PDlil-3 Reading File EAdensam RBellamy GGrant, R3 ACRS OGC DSkay, Lead PM JKudrick, NRR KKavanagh, NRR DOCUMENT NAME: G:\\ PERRY \\MA0027.LTR Ta receive a copy of this document, Indicate in the box: "C" = Copy without enclosures "E" = Cop 7 with enclosures "N" = No copy OFFICE PM:PDill-Q,o
( LA:PDill-3 q,
SRXB:NRR SCSB:NRR NAME DPickett" EBarnhill 9)Y RCaruso*
JKudrick" DATE 6/4-/
6/ 6 /6N 6 / 2 /98 6 / 4 /98 OFFICIAL RECO9D COPY
'See previous concurrence
s s
l L. Myers June 5, 1998 in response to GL 97-04, you provided letters dated November 6,1997 (PY-CEl/NRR-2233L),
and January 5,1998 (PY-CEl/NRR-2246L), for the Perry Nuclear Power Plant, Unit No.1 (PNPP). These submittats provided the information requested by GL 97-04. The staff has reviewed your response and has concluded that all requested information has been provided; therefore, we consider GL 97-04 closed for PNPP. Thank you for your prompt and complete response.
Sincerely, Original signed by:
Douglas V. Pickett, Senior Project Manager Project Directorate 111-3 Division of Reactor Projects Ill/IV Office of Nuclear Reactor Regulation Decket No. 50-440 cc: See next page DISTRIBUTION:
Docket File PUBLIC PDill-3 Reading File EAdensam RBellamy GGrant, R3 ACRS OGC DSkay, Lead PM JKudrick, NRR KKavanagh, NRR DOCUMENT NAME: G:\\ PERRY \\MA0027.LTR TA receive a copy of this document, indicate in the box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy OFFICE PM:PDill-3, m
(
LA:PDill-3 L
SRXB:NRR SCSB:NRR NAME DPickett" ' '
EBarnhill Qfy RCaruso*
JKudrick*
DATE 6/4-/
6/6 /c6 6 /2 /98 6 / 4 /98 OFFICIAL RECORD COPY
'See previous concurrence 1
1 1
i t
i L. Myers Perry Nuclear Power Plant, Units 1 and 2 Centerior Service Company cc:
Jay E. Silberg, Esq.
James R. Williams Shaw, Pittman, Potts & Trowbridge Chief of Staff 2300 N Street, NW.
Ohio Emergency Management Agency Washington, DC 20037 2855 West Dublin Granville Road Columbus, OH 43235-7150 Mary E. O'Reilly
)
Centerior Energy Corporation Mayor, Village of Perry 300 Madison Avenue 4203 Harper Street Toledo, OH 43652 Perry, OH 44081 Resident inspector's Office Roy P. Lessy, Jr.
U.S. Nuclear Regulatory Commission Akin, Gump, Strauss, Hauer P.O. Box 331 and Feld, L.L.P.
Perry, OH 44081-0331 1333 New Hampshire Ave., NW.
Suite 400 Regional Administrator, Region 111 Washington, DC 20036 U.S. Nuclear Regulatory Commission 801 Warrenville Road Radiological Health Program Lisle, IL 60532-4531 Ohio Department of Health P.O. Box 118 Lake County Prosecutor Columbus, OH 43266-0118 Lake County Administration Bldg.
105 Main Street Ohio Environmental Protection Painesville, OH 44077 Agency DERR-Compliance Unit
' Sue Hiatt ATTN: Mr. Zack A. Clayton OCRE Interim Representative P.O. Box 1049 8275 Munson Columbus, OH 43266-0149 Mentor, OH 44060 Chairman Terry J. Lodge, Esq.
Perry Township Board of Trustees 618 N. Michigan Street, Suite 105 3750 Center Road, Box 65 Toledo, OH 43624 Perry, OH 44081 Ashtabula County Prosecutor State of Ohio 25 West Jefferson Street Public Utilities Commission Jefferson, OH 44047 East Broad Street Columbus, OH 43266-0573 Henry L. Hegrat Regulatory Affairs Manager William R. Kanda, Jr., Plant Manager Cleveland Electric illuminating Co.
Cleveland Electric liluminating Co.
Perry Nuclear Power Plant Perry Nuclear Power Plant P.O. Box 97, A210 P.O. Box 97, SB306
' Perry, OH 44081 Perry,~OH 44081
.t
.. t t
, cc: (continued)
Donna Owens, Director Ohio Department of Commerce Division of Industrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road P.O. Box 4009
. Reynoldsburg, OH 43068-9009 Mayor, Village of North Perry North Perry Village Hall 4778 Lockwood Road North Perry Village, OH 44081 Attorney General Department of Attorney General 30 East Broad Street Columbus, OH 43216 t
i 1
4-