Discusses Completion of Licensing Action for GL 97-04, Assurance of Sufficient NPSH for Emergency Core Cooling & Containment Heat Removal Pumps, to All Holders of Operating Licenses or Construction Permits on 971007
ML20248L891
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 06/04/1998
From: Skay D
NRC (Affiliation Not Assigned)
To: Kingsley O
COMMONWEALTH EDISON CO.
References
GL-97-04, GL-97-4, TAC-MA0002, TAC-MA0003, TAC-MA2, TAC-MA3, NUDOCS 9806120040
Download: ML20248L891 (6)


Text

-_

kR 40 p

k UNITED STATES j

NUCLEAR REGULATORY COMMISSION f

WASHINGTON. D.C. 20066 4001 49.....,o June 4, 1998 Mr. Oliver D. Kingsley, President Nuclear Generation Group Commonwealth Edison Company Executive Towers West til 1400 Opus Place, suite 500 Downers Grove,IL 60515

SUBJECT:

COMPLETION OF LICENSING ACTION FOR GENERIC LETTER 97-04 LASALLE COUNTY STATION, UNITS 1 AND 2 (TAC NOS. MA0002 AND MA0003)

Dear Mr. Kingsley:

The U.S. Nuclear Regulatory Commission issued Generic Letter (GL) 97-04, " Assurance of Sufficient Net Positive Suction Head for Emergency Core Cooling and Containment Heat Removal Pumps," to all holders of operating licenses or construction permits on October 7,1997.

- The NRC issued GL 97-04 to confirm the adequacy of the not positive suction head (NPSH) l available for emergency core cooling (including core spray and decay heat removal) and containment heat removal pumps under all design-bas:s accident scenarios.

In GL 97-04, the NRC staff specifically requested that licensees provide the information outlined below for each of their facilities.

1. Specify the general methodology used to calculate the head lo ss associated with the emergency core cooling system (ECCS) suction strainers.
2. Identify the required NPSH and the available NPSH.
3. Specify whether the current design-basis NPSH analysis differs from the most recent analysis l'

reviewed and approved by the NRC for which a safety evaluation was issued.

4. Specify whether containment overpressure (i.e., containment pressure above the vapor l

- pressure of the sump or suppression pool fluid) was credited in the calculation of available j

NPSH. Specify the amount of overpressure needed and the minimum overpressure availab!e.

5. When containment overpressure is credited in the calculation of available NPSH, confirm that an appropriate containment pressure analysis was done to establish the minimum l

containment pressure.

O

._) \\ 0 -

\\

9906120040 990604 h

PDR ADOCK 05000373 P

PDR

1 l

1 l

1 O. Kingsley

-2 June 4, 1998 In response to GL 97-04, you provided letters dated November 6,1997, and January 5,1998, for LaSalle, Units 1 and 2. These submittals provided the information requested by GL 97-04. The staff has reviewed your response and has concluded that all requested information has been i

provided; therefore, we consider GL 97-04 to be closed for your facilities. Thank you for your l

prompt and complete response.

1 if you have any questions regarding this matter, please contact me at (301) 415-1322.

Sincerely, l

l Original Signed By:

l Donna M. Skay, Project Manager l

Project Directorate 111-2 Division of Reactor Projects - lil/lV Office of Nuclear Reactor Regulation Docket Nos. 50-373, 50-374 l

cc: See next page DISTRIBUTION:

Docket File PUBLIC PD lil-2 r/f E. Adensam, EGA1 D. Skay S. Richards C. Moore ACRS, TSC3 D. Hills, Rlli J. Kudrick OGC R. Caruso DOCUMENT NAME: G:\\CMNTSP\\LASALLE\\LA97-04.LAS

(

Tt receive a copy of this document Indicatl dn the bor: "C" = Copy without enclosures "E" = Copy with enclosures [,N"A No c 0FFICE PM:PD32 C OAM2 WSRXS$RR P SCSB:N%RN[

PD:PD32 C

s NAME DSkafMTR L%6re' Rdd$so JKudriM$l SRichards <iS DATE (c /J /98

@/ $ /98 Lf /'L_ /98 4/ 4 /98 /

e / 4 /98 0FFICIALRECORDCOPYjgg

}c,..iV

I

(

O. Kingsley 2

June 4, 1998 j

l l

In response to GL 97-04, you provided letters dated November 6,1997, and January 5,1998, for LaSal!e, Units 1 and 2. These submittals provided the information requested by GL 97-04. The staff has reviewed your response and has concluded that all requested information has been provided; therefore, we consider GL 97-04 to be closed for your facilities. Thank you for your prompt and complete response.

'f you have any questions regarding this matter, please contact me at (301) 415-1322.

l Sincerely, i

Original Signed By:

1 Donna M. Skay, Project Manager Project Directorate ill-2 Division of Reactor Projects - lil/IV office of Nuclear Reactor Regulation Docket Nos. 50-373, 50 374 cc: See next page DISTRIBUTION:

Docket File PUBLIC PD 111-2 r/f E. Adensam, EGA1 D. Skay S. Richards C. Moore ACRS, T5C3 D. Hills, Rill J. Kudrick OGC R. Caruso DOCUMENT NAME: G:\\CMNTSP\\LASALLEM.A97-04.LAS

,i Ts receive a copy of this document Indicati dn the box: "C" = Copy without enclosures *E" = copy with enclosures [NM No c 0FFICE PM:PD32 G (.AM2 WSRXSttlRR P SCSB:N%Rd l PD:PD32 C

~

NAME DSkay4 W L%bre' R$$s'b JKudri M l SRichards S S DATE O / 7 /98

@/ $ /98 Lf /1/98 g, / 4 /98 /

6/4/98 d

1 0FFICIALRECORDCOPYj;g

O. Kingsley In response to GL 97-04, you provided letters dated November 6,1997, and January 5,1998, for LaSalle, Units 1 and 2. These submittals provided the information requested by GL 97-04. The staff has reviewed your response and has concluded that all requested information has been provided; therefore, we consider GL 97-04 closed for your facilities. Thank you for your prompt and complete response, if you have any questions regarding this matter, please contact me at (301) 415-1322.

Sincerely M

Donna M. Skay, Project nager j

Project Directorate 111-2 i

Division of Reactor Projects -lil/IV

)

Office of Nuclear Reactor Regulation Docket Nos. 50-373, 50-374 cc: See next page

i l

)

0 O. Kingsley LaSalle County Station Commonwealth Edison Company Units 1 and 2 cc:

Phillip P. Steptoe, Esquire Michael I. Miller, Esquire Sidley and Austin Sidley and Austin One First National Plaza One First National Plaza Chicago, Illinois 60603 Chicago, Illinois 60603 l

Assistant Attomey General Document Control Desk-Licensing 100 W. Randolph St. Suite 12 Commonwealth Edison Company Chicago, Illinois 60601 1400 Opus Place, Suite 400 Downers Grove, Illinois 60515 U.S. NRC-LaSalle Resident inspectors Office 2605 N. 21st Road Commonwealth Edison Company l

Marseilles, Illinois 61341-9756 Site Vice President - LaSalle 2601 N. 21st Road Chairman Marseilles, Illinois 61341-9757 LaSalie County Board of Supervisors LaSalle County Courthouse Mr. David Helwig Ottawa, Illinois 61350 Senior Vice President Commonwealth Edison Company Attomey General Executive Towers West 111 500 S. Second Street 1400 Opus Place, Suite 900 Springfield, Illinois 62701 Downers Grove,IL 60515 Chairman Mr. Gene H. Stanley lilinois Commerce Commission PWR's Vice President 527 E. Capitol Avenue, Leland Building Commonwealth Edison Company Springfield, Illinois 62706 Executive Towers West 111 1400 Opus Place, Suite 900 lilinois Department of Nuclear Safety Downers Grove,IL 60515 Office of Nuclear Facility Safety 1035 Outer Park Drive Mr. Steve Perry Springfield, Illinois 62704 BWR's Vice President Commonwealth Edison Company Regional Administrator Executive Towers West 111 U.S. NRC, Region lli 1400 Opus Place, Suite 900 801 Warrenville Road Downers Grove, IL 60515 Lisle, Illinois 60532-4351 Mr. Dennis Farrar Commonwealth Edison Company Regulatory Services Manager LaSalie Station Manager Commonwealth Edison Company 2601 N. 21st Road Executive Towers West lli Marseilles, Illinois 61341-9757 1400 Opus Place, Suite 500 Downers Grove,IL 60515 Robert Cushing, Chief, Public Utilities Division i

Illinois Attomey General's Office 100 W. Randolph Street Chicago, Illinois 60601

a e

O. Kingsley LaSalle County Station Commonwealth Edison Company Units 1 and 2 Ms. Irene Johnson, Licensing Director Nuclear Regulatory Services Commonwealth Edison Company Executive Towers West lil 1400 Opus Place, Suite 500 Downers Grove, IL 60515 Commonwealth Edison Company j

Reg. Assursnce Supervisor-LaSalle 2601 N. 21st Road Marsellies, Illinois 61341-g757 Mr. Michael J. Wallace Senior Vice President Commonwealth Edison Company Executive Towers West lil 1400 Opus Place, Suite 900 Downers Grove,IL 60515 l

i I

t J