ML20248K773

From kanterella
Jump to navigation Jump to search

Discusses Completion of Licensing Action for GL 97-04, Assurance of Sufficient NPSH for Emergency Core Cooling & Containment Heat Removal Pumps
ML20248K773
Person / Time
Site: River Bend Entergy icon.png
Issue date: 06/04/1998
From: Wigginton D
NRC (Affiliation Not Assigned)
To: Mcgaha J
ENTERGY OPERATIONS, INC.
References
GL-97-04, GL-97-4, TAC-MA0036, TAC-MA36, NUDOCS 9806100259
Download: ML20248K773 (4)


Text

__

h *VC7 n,%,

g

  • 4 UNITED STATES s

j NUCLEAR REGULATORY COMMISSION 2

WASHINGTON, D.C. 20006 4 001

% *****}

June 4, 1998 Mr. John R. McGaha, Jr.

Vice President-Operations Entergy Operations, Inc.

River Dend Station P. O. Box 220 St. Francisville, LA 70775

SUBJECT:

COMPLETION OF LICENSING ACTION FOR GENERIC LETTER 97 RIVER BEND STATION, UNIT NO.1 (TAC NO. MA0036)

Dear Mr. McGaha:

The U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 97-04, " Assurance of Sufficient Not Positive Suction Head for Emergency Core Cooling and Containment Heat Removal Pumps," to all holders of operating licenses or construction permits on October 7,1997.

The NRC issued GL 97-04 to confirm the adequacy of the not positive suction head (NPSH) available for emergency core cooling (including core spray and decay heat removal) and containment heat removal pumps under all design-basis accident scenarios.

In GL 97-04, the NRC staff specifically requested that licensees provide the information outlined below for each of their facilities.

1. Specify the general methodology used to calculate the head loss associated with the Emergency Core Cooling System suction strainers.
2. Identify the required NPSH and the available NPSH.
3. Specify whether the current design-basis NPSH analysis differs from the most recent analysis reviewed and approved by the NRC for which a safety evaluation was issued.
4. Specify whether containment overpressure (i.e., containment pressure above the vapor D

pressure of the sump or suppression pool flud) was credited in the calculation of available NPSH. Specify the amount of overpressure needed and the minimum overpressure

[

available.

5. When containment overpressure is credited in the calculation of available NPSH, confirm that an appropriate containment pressure analysis was done to establish the minimum containment pressure, j

l x

bfLk $[M[$ [5gr 9906100259 990604 PDR ADOCK O$000450 p._

PDR

g.. t Mr. John R. McGaha, Jr. - In response to GL 97-04, you prc.eded letters dated November 6,1997, and January 5,1998, for the River Bend Station These submittals provided the information requested by GL 97-04..The staff has reviewed your response and has concluded that all requested information has been-provided; therefore, we consider GL 97-04 closed for pr facility. Thank p for yxr prtmpt

- and emplete response.

If you have any questions regarding this matter, please contact David L. Wgginton at 301415.

1301.

Sincerely,

. ORIGINAL SIGNED BY:

David L Wigginton, Senior Project Manager

Project Directorate IV-1 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation Docket No. 50-458 cc: See next page DISTRIBUTION:

Docket File :

PUBLIC PD IV-1 r/f EAdensam (EGA1)

. JHannon DWigginton CHawes ACRS

' OGC DSkay JKudrick.

.KKavanagh TGwynn, RIV Document Name: RBA0036.LTR l

OFC

- PM/PD4 th,. /

LA/PD4-1 SS (B Dh1-1 NAME DWinoin[onfvw CHaNs Rh q$so Jf4 ant)on J

(

DATE b/K /98 hl3 /9s ki>}/98

}n/ h

[/)/h98 COPYJ O NO YES/NO hES/NO YkS/Nb\\

YES/NO V'

OFFICIAL RECORD COPY

.,pf 4 11 y

g 1

Mr. John R. McGaha, Jr. In response to GL 97-04, you provided letters dated November 6,1997, and January 5,1998, for the River Bend Station. These submittals provided the information requested by GL 97-04. The staff has reviewed your response and has concluded that all requested information has been provided; therefore, we consider GL 97-04 closed for your facility. Thank you for your prompt and complete response.

if you have any questions regarding this matter, please contact David L. Wgginton at 301415-1301.

Sincerely, O

n David L.

on, Senior Project Manager

]

Project Directorate IV-1 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation Docket No. 50-458 cc: See next page i

1

___.____________._m._

Mr. John R. McGaha Entergy Operations, Inc.

River Ber.d Station cc:

Wmston & Strewn Executive Vice President and 1400 L Street, N.W.

Chief Operating Officer Washington, DC 20005-3502 Entergy operations, Inc.

P. O. Box 31995 Manager-Licensing Jackson, MS 39286 Entergy Operations, Inc.

River Bend Etation General Manager-Plant Operations P. O. Box 220 Entergy Operations, Inc.

St. Francisville, LA 70775 River Bond Station P. O. Box 220 Senior Resident inspector St. Francisville, LA 70775 P. O. Box 1050 St. Francisville, LA 70775 Director-Nuclear Safety Entergy Operations, Inc.

President of West Feliciana River Bend Station Police Jury P. O. Box 220 P. O. Box 1921 St. Francisville, LA 70775 St. Francisville, LA 70775 Vice President - Operations Support Regional Administrator, Region IV Entergy Operations, Inc.

U.S. Nuclear Regulatory Commission P. O. Box 31995 611 Ryan Plaza Drive, Suite 1000 Jackson, MS 39286-1995 Arlington, TX 76011 Attomey General Ms. H. Anne Plettinger State of Louisiana 3456 Villa Rose Drive P. O. Box 94095 Baton Rouge, LA 70806 Baton Rouge, LA 70804-9095 Administrator Wise, Carter, Child & Caraway Louisiana Radiation Protection Division P. O. Box 651 P. O. Box 82135 Jackson, MS 39205 Baton Rouge, LA 70884-2135 i

i i

s-j