ML20248K078

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-461/89-05 on 890119-0323. No Violations Noted
ML20248K078
Person / Time
Site: Clinton Constellation icon.png
Issue date: 04/06/1989
From: Cooper R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML20248K082 List:
References
IEIN-88-003, IEIN-88-3, NUDOCS 8904170216
Download: ML20248K078 (2)


See also: IR 05000461/1989005

Text

---.,--._------__.---.__-----.,.-,,--..,_..-----c,-----.m

'-

,

n

...

'APR

'61900

Docket ~ No. 50-461 :

' Illinois Power ~ Company

iATTN:

Mr. W. C. Gerstner

I

Executive Vice President

500 South 27th Street

'

Decatur, IL 62525

Gentlemen:

This refers to the routine safety inspection of activities related to

inservice inspection, plant modifications, and action on Information-

1

Notice 88-03 conducted by Mr. K. D. Ward of this office on January.19-20,

February 1-2, 8,.21-23, and March 23, 1989, of activities at Clinton Power

Station, . Unit 1,: authorized by NRC Dperating License No. NPF-62, and to

the disc'Jssion.of our findings with you and _others of your staff'at.the

conclusion of'the inspection.

The enclosed copy of our inspection report identifies areas examined during

-the inspection.

Within these areas, the inspection consisted of a selective

> examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC. requirements were identified during the course of this-

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a ~ copy of

j

this letter and th-e enclosed inspection report will be placed in the NRC

!

Public' Document Room.

We'will gladly discus ~s any questions you have concerning this inspection.

~

Sincerely,

I

l

ORIGIELL C~ chi;0 BY RICu!JtD W. COOFER

J

i

I

l

l

R. W. Cooper, Chief

l

'

Engineering Branch

1

i

Enclosure: ' Inspection Report

l

No. 50-461/89005(DRS)

l

See Attached Distribution

l-

f

we

,

'

RIII

RIII

RIII

RIII

bM)

bYW)

W-

N

h46W

Ward / Jaw

Dagielson

Ring

Copper

M/3//7

YN

di

890417021'6 890406

\\

PDR

ADOCK 05000461

Q D*Ol

'Q

PDC

-

-________-_-_ ___

___

s

,

l:

.-

,.

'-

.,

l

l

Illinois Power Company

2

APR

6 1989

l

l

i

~ distribution

!

D

!

cc w/ enclosure:

D. P. Hall, Vice President

J. S. Perry, Assistant

i

Vice President

J

R. D. Freeman, Manager,

Nuclear Station

Engineering Department

i

DCD/DCB (RIDS)

Licensino Fee Management-Branch

Resident Inspector, RIII-

Richard Hubbard.

i

J. W. McCaffrey, Chief, Public

Utilities Division l

l

H. S. Taylor, Quality Assurance

Division, Sargent & Lundy

j

Engineers

David Rosenblatt, Governor's

i

Office of Consumer Services

i

Sheldon Zabel, Esquire,

,

Schiff, Hardin, & Waite

'

L. Larson, Projec' Manager,

General Electric Company

Chairman of DeWitt County

Illinois Department of

Nuclear Safety

D. Schopfer, Project Manager,

J

Sargent & Lundy Engineers

!

!

!

l

1

.

_ _ _ _ _ . . _ . _ _ _ _ _ _