ML20248J938
| ML20248J938 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 04/03/1989 |
| From: | Public Service Enterprise Group |
| To: | |
| Shared Package | |
| ML20248J933 | List: |
| References | |
| NUDOCS 8904170160 | |
| Download: ML20248J938 (2) | |
Text
_ - _ -.. _ _
'd*,'
i ?
- i i
i 4
i 1
h ATTACHMENT 1 l
4 MARKED-UP T.S.
PAGE i
)
i l
1 l
-8904170160 890403 PDR ADOCK 05000354 P
PDC i
r----_-----_____
e
- 1. <
INSTRUMENTATION SOURCE RANGE MONITORS LIMITING CONDITION FOR OPERATION 3.3.7.6 At least the following source range monitor channels shall be OPERABLE:
a.
In OPERATIONAL CONDITION 2*, three.
b.
In OPERATIONAL CONDITION 3 and 4, two.
APPLICABILITY:
OPERATIONAL CONDITIONS 2*, 3 and 4.
i ACTION:
a.
In OPERATIONAL CONDITION 2* with one of the above required source range monitor channels inoperable, restore at least 3 source range monitor channels to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
b.
In OPERATIONAL CONDITION 3 or 4 with one or more of the above required source range monitor channels inoperable, verify all insertable control rods to be inserted in the core and lock the reactor mode switch in the Shutdown position within one hour.
SURVEILLANCE REQUIREMENTS 4.3.7.6 Each of the above required source range monitor channels shall be demonstrated OPERABLE by:
a.
Performance of a:
1.
CHANNEL CHECK at least once per:
a) 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> in CONDITION 2*,
and l
1 b) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in CONDITION 3 or 4.
1 2.
CHANNEL. CALIBRATION ** at..least. once per.18 months, b.
Performance of a CHANNEL FUNCTIONAL TEST:
1.
Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to moving the reactor mode switch from t
the Shutdown position, if not performed within the previous 7 days, and 2.
At least once per 31 days.
c.
Verifying, prior to wit rawal of control rods, that the SRM count rate is at least 3 cp ith the detector fully inserted.
"With IRM's on range 2 or below.
gw:de twc Tri=vrE =me ette aq[
W detectors may be excluded from CHANNEL CALIBRATION.
Q u n de a = :.: wp:
~ _ _ _ - -
l HOPE CREEK 3/4 3-88 l
- - _ _ - _ _ _ _ _ _ _ - _ _ _ _ _