ML20248J526
| ML20248J526 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 06/04/1998 |
| From: | Collins E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Hutchinson C ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20248J529 | List: |
| References | |
| 50-313-98-04, 50-313-98-4, 50-368-98-04, 50-368-98-4, NUDOCS 9806090181 | |
| Download: ML20248J526 (5) | |
See also: IR 05000313/1998004
Text
_ _ _ - - _ _ _ _ _ - _ _
. _ _ _ . - _ _ . _ _ - _ _ _ _ - _ - - _
-_
__ - __ _ _____ - __-_
_ _ _ _
_ _ _ _ _ _ _ _ _ _ _ - -
2
s-
g# 4% -
UNITED STATES
1
IS.
NUCLEAR REGULATORY COMMISSION
+
,,
.
{
y
REoloN IV
.
{+f**.
f
$11 RYAN PLAZA DRIVE, SUITE 400 -
/
i
..*
'
JUN -4 1998
C. Randy Hutchinson, Vice President
Operations
4
Arkansas Nuclear One
Entergy Operations, Inc.
1448 S.R. 333 -
Russellville, Arkansas 72801-0967
I
SUBJECT: NRC INSPECTION REPORT 50-313/98-04; 50-368/98-04 AND NOTICE OF
VIOLATION
l
Dear Mr. Hutchinson:
From March 29 through May 9,1998, a routine resident inspection was conducted at your
Arkansas Nuclear One, Units 1 and 2, reactor facilities. The enclosed report presents the scope
and results of that inspection.
During the 6-week period covered by this inspection, your conduct of activities at the
. ANO facility was generally characterized by safety-conscious operations, sound engineering and
maintenance practices, and appropriate radiological controls.- One violation of NRC
requirements was identified. The violation resulted ' rom the improper clearance of a hold card
on a circuit breaker which supplies power to the motor operator for a Unit 1 circulating water
pump discharge valve. Although no personnel were injured, this error created the potential for a
serious personnel injury. In January 1997, a similar near-miss accident occurred when the
~ improper clearance of a hold card resulted in the energization of a 480v bus that electricians
were working in at the time. Although your corrective actions for this previous NRC violation
appeared to be comprehensive, you continue to experience errors associated with the
implementation of your hold card program. Your attention is required to ensure that your
corrective actions are effective in addressing hold card errors.
The vio[ation is cited in the enclosed Notice of Violation (Notice) and the circumstances
surrounding this violation are described in detail in the enclosed report. Please note that you are
required to respond to this letter and should follow the instructions specified in the enclosed
Notice when preparing your response. The NRC will use your response, in part, to determine
whether further enforcement action is necessary to ensure compliance with regulatory
requirements.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosure (s), and your respon'se will be placd in the NRC Public Document Room (PDR).
\\a
9906090181 990604
ADOCK 05000313
.G
_--_-___--___ ____ _ _ _ _ _ _
_
i
.
Entergy Operations, Inc.
-2-
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
Elmo E. Co! lins, Chief
Project Branch C
Division of Reactor Projects
Docket Nos.: 50-313
50-368
License Nos.: DPR-51
NPF-6
Enclosures:
2. NRC Inspection Report
50-313/98-04; 50-368/98-04
cc w/ enclosures:
Executive Vice President
& Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
'
Jackson, Mississippi 39286-1995
Vice President
I
Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286
Manager, Washington Nuclear Operations
ABB Combustion Engineering Nuclear
Power
12300 Twinbrook Parkway, Suite 330
\\
Rockville, Maryland 20852
\\
County Judge of Pope County
Pope County Courthouse
Russellville, Arkansas 72801
l
-
-.
- _ - _ _ -
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _,
8
0
Entergy Operations, Inc.
-3-
Winston & Strawn
1400 L Street, N.W.
Washington, D.C. 20005-3502
David D. Snellings, Jr., Director
Division of Radiation Control and
Emergency Management
.
4815 West Markham Street, Mail Slot 30
Little Rock, Arkansas 72205-3867
Manager
Rockville Nuclear Licensing
Framatome Technologies
1700 Rockville Pike, Suite 525
Rockville, Maryland 20852
1
-_ _____
. - _ _ - . _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ -
<
-
,
Entergy Operations, Inc.
-4-
y q_
E-Mail repod to T. Frye (TJF) '
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT) .
bec to DCD (IE01)
-
bec distrib, by RIV:
Regional Administrator
Resident inspector
DRP Director
MIS System
Branch Chief (DRP/C)
RIV File
Project Engineer (DRP/C)
DRS-PSB
Branch Chief (DRP/TSS)
g
l
DOCUMENT NAME: . R:\\_ANOWN804RP.KMK
To seceive copy of document. Indicato in box:"C" = Copy withs
. closures "E" = Copy with enclosures "N" = No copy
RIV:RI
RIV:RI-
RIV: SRI J
C:DRS/PSm
C:DEP/Q
L
SCBurton
JFMelfi
KMKennedy
SMurray %)
EEfCplfns
5/22/98
5/22/98
5/22/98
3/k /98
(al U/98
OFFICIAL RECORD COPY '
~
Ls
.
.v
,
_ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _
-
.
g
.4
Entergy Operations, Inc.
-4-
_
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
MIS System
i
Branch Chief (DRP/C)
RIV File
Project Engineer (DRP/C)
DRS-PSB
Branch Chief (DRP/TSS)
DOCUMENT NAME: R:\\_ANO\\AN804RP.KMK
To receive copy of document, irdicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
RIV:RI
l
RIV:RI
RIV: SRI
C:DRS/PSs
C:DFFJ/C
SCBurton
JFMelfi
KMKennedy
J3Murray V)
EEdofffns
5/22/98
5/22/98
5/22/98
@/d( /98
- / ()/98
OFFICIAL RECORD COPY '
"
I
080053
,