Proposed Tech Specs Re Composition of Safety Review Board
ML20248J067
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/05/1989
From:
GEORGIA POWER CO.
To:
Shared Package
ML20248J057 List:
References
NUDOCS 8904140306
Download: ML20248J067 (2)


Text

.

[

a ENCLOSURE 3 m.

PLANT V0GTLE - UNITS 1, 2 NRC DOCKETS 50=i,24, 50-425 OPERATING LICENSES NPF-68, NPF-81 REQUEST TO REVISE TECHNICAL SPECIFICATION 6.4.2.2 TO ALLOW A PLANT UNIQUE SAFETY REVIEW BOARD INSTRUCTIONS FOR INCORPORATION The proposed amendment to the Technical Specification. (Appendix A to Operating Licenses NPF-68' and NPF-81) would be incorporated as follows:

Remove Page Insert Page 6 6-10 l

l 8904140306 890405 ADoCK0500gg4 DR

  • C ADMINISTRATIVE CONTROLS FUNCTION (Continued) c.

Chemistry and radiochemistry, d.

Metallurgy, e.

Instrumentation and control, I

f.

Radiological safety, g.

Mechanical and electrical engineering, and h.

Quality assurance practices.

The SRB shall report to and advise the Vice President-Nuclear on those areas of responsibility specified in Specifications 6.4.2.7 and 6.4.2.8.

COMPOSITION

- 0. 0. 2. 0 The CO ch:11 be cr;;;rhed :: en: 50:rd fer-al' GPC ucc! ear power

-plants.

The SRB shall be composed of a minimum of five persons who, as a group, provide the expertise to review and audit the operation of a nuclear power plant.

The chairman and other members shall be appointed by the Vice President-Nuclear or other such person as he may designate.

The composition of the SRB shall meet the requirements of ANSI N18.7-1976.

ALTERNATES 6.4.2.3 All alternate members shall be appointed in writing by the SRB Chair-man to serve on a temporary basis; however, no more than a minority of alter-nates shall participate as voting members in SRB activities at any one time.

CONSULTANTS 6.4.2.4 Consultants shall be utilized as determined by the SRB chairman to provide expert advice to the SRB.

MEETING FREQUENCY 6.4.2.5 The SRB shall meet at least once per calendar quarter during the initial year of plant operation following fuel loading and at least once per 6 months thereafter.

QUORUM i

6.4.2.6 The quorum of the SRB necessary for the performance of the SRB review and audit functions of these Technical Specifications shall consist of the Chairman or his designated alter, ate and at least a majority of the SRB members including alternates. No more than a minority of the quorum shall have line responsibility for operation of the plant.