ML20248G914

From kanterella
Jump to navigation Jump to search
Requests Review & Comment on Allegation RIII-89-A-0037 Re Security Activities within 30 Days.Encl Withheld (Ref 10CFR2.790)
ML20248G914
Person / Time
Site: Clinton Constellation icon.png
Issue date: 03/30/1989
From: Jim Hickey
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
References
NUDOCS 8904130625
Download: ML20248G914 (2)


Text

-

l k?

6' v

u j t.,

(_

MAR 3 01989 a

Docket'No. 50-461 i

Illinois. Power Company ATTN: -Mr. W..C.<Gerstner

. Executive'Vice President

_500 South 27th Street-Decatur,.IL 62525 Gentlemen:

'The U.S. Nuclear Regulatory Commission recently received an allegation concerning security activities at the Clinton Power Station 4(RIII-89-A-0037).

Details of this allegation are enclosed for~your review and followup..

We request that the result's of your review and disposition of this~ matter be-submitted to Region III within 30 days of the date of.this'. letter. We' request

-thatlyour response contain no personal privacy,. proprietary,:or safeguards information so it can be released to the'public;and placed in the NRC Public Document Room.

If necessary, such information shall be contained in a separate attachment which will,be withheld from public disclosure,and the affidavit required by 10 CFR 2.790(b) must accompany your response.-

The enclosure to this. letter'should be controlled and distribution. limited to personnel with a "need to know" until your investigation of.the allegation has been completed and reviewed.by NRC_ Region III.

The enclosure to this letter is considered as. Exempt from Public Disclosure.in accordance with Title 10, Code of Federal Regulations, Part 2.790(a). However, in accordance with-10 CFR 2.790 of the Commission's regulations, a copy of this letter, excluding the enclosure, will be placed in the NrC Public Document. Room.

The response requested by this letter and the accompanying enclosure are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

Your cooperation with us is appreciated. We will gladly discuss any questions M

you may have concerning'this information.

, b Sincerely, L

88$

d L,@w@o

/.5/

tP I

John W. N. Hickey, Director I

in z

$8 Division of Radiation Safety

oc and Safeguards

$4

Enclosure:

Alle tion Details ENCLOSURE CONTAINS

~(10 CFR 2.790(gaa) INFORMATION) 10CFR2.790 INFORMATION

~ gg UPON SEPARATION THIS oso@:

.See Attached Distribution PAGE IS DECONTROLLED Jeil r

ius

{

bl3Nf\\.

k 3

'Y 9

.w

.n :

.g 7. -

a *.

p

~

" Illinois Power Company 2

MAR 3 01989

.i Distribution-

_cc w/ enclosure:,

+-

D. P. Hall, Vice President

.J. S. Perry',- Assistant Vice President R. D. Freeman, Manager, Nuclear Station

' Engineering Department

.NRR/DRIS/SGB NRR/DRIS/ SIB NRR/DLPQ/PEB cc w/ enclosure, w/o;10.CFR 2.790.

INFORMATION:

DCD/DCB (RIDS)

Licensing. Fee Management-Branch Resident Inspector, RIII n.

so.

Richard.Hubbard

'J..W.' McCaffrey, Chief, Public w

Utilities Division.

H. S. Taylor, Quality Assurance

' Di_vi si on, - Sargent ' & z Lundy i

Engineers:

David Rosenblatt, Governor's

'=

Office of Consumer Ser. vices SheldonZabel, Esquire, Schiff, Hardin, & Waite L..Larson, Project Manager,.

General Electric Company

' Chairman-of DeWitt. County Illinois Department of Nuclear Safety D.:Schopfer, Project Manager, Sargent & Lundy Engineers

.m Enclosure Contai.ns 30 CFR 2.790 INFORMKrl0N i: vn Saparation This cage is Decontrolled w__

=

. = _ _.

_