ML20248G350

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-302/89-03 on 890128-0224.No Violations or Deviations Noted
ML20248G350
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/24/1989
From: Wilson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Wilgus W
FLORIDA POWER CORP.
Shared Package
ML20248G351 List:
References
NUDOCS 8904130397
Download: ML20248G350 (2)


See also: IR 05000302/1989003

Text

_ __ ,

_ _ , _ , _ - - . . _ _ - - - .

_

'#_'

._

'

.

..

.

.

.

.

.

p

MAR 2 41989.

j.

-

h

Docket No. 50-302

License No. DPR-72

" Florida Power Corporation

Mr. W. S. Wilgus

..

.Vice President Nuclear Operations

ATTN: Manager, Nuclear Licensing

P.~0. Box 219

Crystal River, FL 32629

,

Gentlemen:

SUBJECT: NRC' INSPECTION. REPORT N0. 50-302/89-03

-This cefers to the Nuclear Regulatory Commission (NRC) inspection conducted

by P. Holmes-Ray on January 28

. February 24, 1989.

The inspection included

a. review of activities authorized for your Crystal River facility.

At the-

conclusion of the inspection, the findings were discussed with those members

,

of your staff identified in the enclosed inspection report.-

Areas examined during the' inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews ,with personnel, and observation of

activities in progress.

b

Within the scope 'of the inspection, no violations or deviations were identi-

. fied.s

4

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2

Title 10, Code of Federal Regulations, a copy of this letter and its enclosures

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

OriginalSigned By

BRUCE A'. WILSON

I

Bruce A. Wilson, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

(Seepage 2)

!

DESIGN TW ORIGINAL

,,

Co Lttet By

Ahl t44)

_

41QG h0b

2

1

.

-.

-

-

hen

o

.c

' .

,

0

.,

. , .

,

',

.

.

MAR 2 41939

Florida Power' Corporation

2

,

Enclosure:

NRC Inspection Report

cc w/ encl:

,

G. L. Boldt, Vice President,

'

Nuclear Prodt ' tion.

A. H. Stephens, General Counsel

R. C. Widell, Director, Nuclear

Operations Site Support

P. F. McKee, Director, Nuclear

Plant Operations-

State of Florida

bec w/ enc 1:

NRC Resident Inspector

DRS Technical Assistant

Document Control Desk

!

l

!

!

l

'

RII

RIE

a)

11)

WPoertner: ser

RC1

enjak

03/10/89

03

89

l

l

i