ML20248E746
| ML20248E746 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 05/28/1998 |
| From: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Hagan J ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20248E749 | List: |
| References | |
| 50-416-98-05, 50-416-98-5, NUDOCS 9806030434 | |
| Download: ML20248E746 (5) | |
See also: IR 05000416/1998005
Text
_ _ _ - _ _ __
. . _ . . .
_ - - - _
- _ _ . _ _ . - _ _ _ _ - . . _ _ - - - - . _ _ _ _ .
. _ - ____ - __ - _ - - __ _ __ -. - -
-
8
t
g_
pm mecoq
U%ITED STAT ES
g. .
,Ig
NUCLEAR REGULATORY COMMISSION
h
,$
nEGION IV
0,% -
g
ARLINGTON, TEXAS 760118064
611 RYAN PLAZA DRIVE, SUITE 400
- ..+
May 28. 1998
Joseph J. Hagan, Vice President
Operations - Grand Gulf Nuclear Sfttion
Entergy Operations, Inc.
P.O. Box 756
Port Gibson, Mississippi 39150
SUBJECT: NRC INSPECTION REPORT 50-416/98-05 AND NOTICE OF VIOLATION
Dear Mr. Hagan:
From April 5 through May 16,1998, an NRC inspection was conducted at your Grand Gulf
Nuclear Station reactor facility. The enclosed report presents the scope and results of that
inspection.
During the 6-week period covered by this inspection, your conduct of activities at the Grand
Gulf facility was generally characterized by safety-conscious operations, sound engineering and
maintenance practices, and careful radiological work controls. However, the inspection
identified two violations consisting of the failure to follow the standby diesel generator system
operating procedure and failure to perform engineering evaluations prior to installing scaffolding
in close proximity to safety-related equipment. The second violation is of concern because it
indicated a breakdown in your scaffolding program with regards to the construction of
scaffolding in accordance with your procedure.
The violations are cited in the enclosed Notice of Violation (Notice) and the circumstances
surrounding the violations are described in detailin the enclosed report. Please note that you
are required to respond to this letter and should follow the instructions specified in the enclosed
i
Notice when preparing your response. The NRC will use your response, in part, to determine
{
whether further enforcement action is necessary to ensure compliance with regulatory
requirements.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
..
enclosures, and your response will be placed in the NRC Public Document Room.
f
)
_
9906030434 900528
ADOCK 05000416
G
e
,
!
(b
- _ - _ - - _ _ _ - _ _ _ _ _ - - _ _ _ - _ - _ _
__-
- _ _ _
s
w
Entergy Operations, Inc.
-2-
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
J
h'
Dennis F. Kirs , Chief, Project Branch F
i
Division of Reactor Projects
.
-
i
Docket No.:
50-416
/
License No.: NPF-29
Enclosures:
2. NRC Inspection Report
50-416/98-05
cc w/ enclosures:
Executive Vice Piesident
i
and Chief Operating Officer
{
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39206-1995
Wise, Carter, Child & Caraway
P.O. Box 651
i
l
Jackson, Mississippi 39205
1
Winston & Strawn
1400 L Street, N.W. - 12th Floor
Washington, D.C. 20005-3502
s
Sam Mabry, Director
Division of Solid Waste Management
I
Mississippi Department of Natural
Resources
P.O. Box 10385
Jeckson, Mississippi 39209
l
President
Claiborne County Board of Supervisors
Port Gibson, Mississippi 39150
-
L
- _ - _ _ - _ _ _ _ _ _ - . _ _ .
_ - _ _ _ _
_ _ _ _ _ _ _ _ _
. _ _ -
.
' Entergy Operations, Inc.
-3-
General Manager
Grand Gulf Nuclear Station .
Entergy Operations, Inc.
P.O. Box 756
Port Gibson, Mississippi 39150
The Honorable Richard Leyoub
Attorney General
Department of Justice
State of Louisiana
P.O. Box 94005
Baton Rouge, Louisiana 70804-9005
Office of the Governor
State of Mississippi
Jackson, Mississippi 39201
Mike Moore, Attorney General
Frank Spencer, Asst. Attorney General
State of Mississippi
P.O. Box 22947
Jackson, Mississippi 39225
. Dr. F. E. Tnompson, Jr.
State Health Officer
State Board of Health
k
P.O. Box 1700 ~
,!
Jackson, Mississippi 39205
e
'
' Robert W. Gaff, Director
State Liais;n Officer
Division of Radiation Health '
I
Mississippi Department of Health
P.O. Box 1700
Jackson, Mississippi 39215-1700
,
Vice President
Operations Support
- Entergy Operations, Inc.
. P.O. Box 31995
Jackson, Mississippi 39286-1995
'
,-
..
L
l
l
,
. _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ -
_
'
. $
. Entergy Operations, Inc.
-4-
' Director, Nuclear Safety
and Regulatory Affairs -
Entergy Operations, Inc.
P.O. Box 756
Port Gibson, Mississippi- 39100
!
i
Vice President, Operations
-
Grand Gulf Nuclear Station
Entergy Operations, Inc.
P,0. Box 756
Port Gi'oson, Mississippi 39150
l
i
1
1
u
1
)
l
. .
<
,
i
i
'
,
l
l
Entergy Operations, Inc.
-5-
!
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Cont'ai Desk (DOCDESK)
l
l
lbcc to DCD (IE01);
i
!
j
bec distrib. by RIV:
Regional Administrator
Senior Resident inspector (River Bend)
l'
DRP Director
DRS-PSB
Branch Chief (DRP/F)
MIS System
Project Engineer (DRP/F)
RIV File
Branch Chief (DRP/TSS)
Resident inspector
l
l
l
l
l
l
l
t
I
l
I
l
,
DOCUMENT NAME: R:\\_GG\\GG805RP.JLD
l:
To receive copy of document. indicate in box: "C" = Copy without enciosures "E" = Copy with enclosures "N" = No copy
RlV: SRI:DRP/F
RI:DRP/F
_,
C:DRF/F
_
_,
JLDixon-HprrilyP
KDWeave/Mh DFKirscM
05698 V
05g98f3uaL. 05ff98'
'
OFFiCIAT RECORD COPY
I
1
L