Forwards Insp Repts 50-313/89-05 & 50-368/89-05 on 890201-28.Violations Noted.Continuing Problem W/Small Fires on Unit 2 Diesel Generator Exhaust Manifold Discussed in Rept
ML20248E306
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 03/31/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20248E308 List:
References
NUDOCS 8904120200
Download: ML20248E306 (2)


See also: IR 05000313/1989005

Text

.

.

.

'

MAR 3 ' 1989

'

In Reply Refer To:

Dockets: 50-313/89-05

50-368/89-05

Arkansas Power & Light Company

ATTN: Mr. Gene Campbell

Vice President, Nuclear

Operations

P.O. Box 551

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted by Messrs. R. C. Haag and R. V. Azua of

this office during the period February 1-28, 1989, of activities authorized by

NRC Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One, Units 1 and

2, and to the discussion of our findings with Mr. J. M. Levine and other

members of your staff at the conclusion of the inspection.

Areas examined during the inspection included maintenance, followup of events,

operational safety verification, surveillance, and allegation followup. Within

these areas, the inspection consisted of selective examination of procedures

and representative records, interviews with personnel, and observations by the

inspectors. The findings are documented in the enclosed inspection report.

During this inspection it was found that certain of your activities were in

violation of NRC requirements. Because one apparent violation was an example

of a previously cited violation in which your corrective action had not been

completed, you are not required to respond to this apparent violation. Also

because the second apparent violation satisfied the applicable criteria of

Appendix C,Section V, of the NRC's, " Rules of Practice," Part 2, Title 10

Code of Federal Regulations for no citation, you are not required to respond to

this apparent violation.

Pragraph 6 of this report discusses a continuing problem with small fires on a

Unit 2 diesel generator exhaust manifold. Your planned corrective actions and

schedule for this matter will be discussed along with other matters at a

management meeting in NRC Region IV. The time and agenda for this meeting will

be promulgated separately.

l

0:-

O(

,

  • RIV:RI
  • C:DRP/A

D:DR

RCHaag;1m

RVAzua

DDChamberlain

LJCal an

/ /89

/ /89

/ /89

3/g/89

j

  • Previously concurred

l

\\

j

{

890412O200 890345

k

l

PDR

ADOCK 05000313

Q

PDC

_ - - _ _ _

.

-

..

,;

.

.

,

..

/

f

i

j

.

I

Arkansas Power &. Light Company

' -2-

-

i

',

f

f' -

Should you have any questions concerning.this inspection, we wil1 be. pleased to

discuss them with you.

Sincerely,

ORIGINAL SIGNED BY:~

LJ. CALLAN

L. J. Callan, Director

l

Division of Reactor Projects

l

Enclosure:

Appendix - NRC Inspection Report

50-313/89-05

50-368/89-05

cc w/ enclosure:

Arkansas Nuclear One

- '

ATTN:

J. M. Levine, Execut've Director

'

i

Nuclear Operations

-

P.O. Box 608

. Russellville., Arkansas 72801

Arkansas Radiation Control Program r. rector

bcc to DMB (IE01)

bec distrib. by RIV:

  • RRI
  • Robert D. Martin, RA

'

  • RPB-DRSS
  • Section Chief (DRP/A)

Lisa Shea, RM/ALF-

  • RIV File
  • DRP
  • i1IS System
  • RSTS Operator
  • Project Engineer, DRP/A
  • C. Harbuck, NRR Project Manager (MS: 13-D-18)
  • C. Poslusny, NRR Project Manager (MS: 13-D-18)
  • DRS
  • w/766

(