MAR 3 ' 1989
'
In Reply Refer To:
Dockets: 50-313/89-05
50-368/89-05
Arkansas Power & Light Company
ATTN: Mr. Gene Campbell
Vice President, Nuclear
Operations
P.O. Box 551
Little Rock, Arkansas 72203
Gentlemen:
This refers to the inspection conducted by Messrs. R. C. Haag and R. V. Azua of
this office during the period February 1-28, 1989, of activities authorized by
NRC Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One, Units 1 and
2, and to the discussion of our findings with Mr. J. M. Levine and other
members of your staff at the conclusion of the inspection.
Areas examined during the inspection included maintenance, followup of events,
operational safety verification, surveillance, and allegation followup. Within
these areas, the inspection consisted of selective examination of procedures
and representative records, interviews with personnel, and observations by the
inspectors. The findings are documented in the enclosed inspection report.
During this inspection it was found that certain of your activities were in
violation of NRC requirements. Because one apparent violation was an example
of a previously cited violation in which your corrective action had not been
completed, you are not required to respond to this apparent violation. Also
because the second apparent violation satisfied the applicable criteria of
Appendix C,Section V, of the NRC's, " Rules of Practice," Part 2, Title 10
Code of Federal Regulations for no citation, you are not required to respond to
this apparent violation.
Pragraph 6 of this report discusses a continuing problem with small fires on a
Unit 2 diesel generator exhaust manifold. Your planned corrective actions and
schedule for this matter will be discussed along with other matters at a
management meeting in NRC Region IV. The time and agenda for this meeting will
be promulgated separately.
l
0:-
O(
,
- RIV:RI
- C:DRP/A
D:DR
RCHaag;1m
RVAzua
DDChamberlain
LJCal an
/ /89
/ /89
/ /89
3/g/89
j
- Previously concurred
l
\\
j
{
890412O200 890345
k
l
ADOCK 05000313
Q
_ - - _ _ _
.
-
..
,;
.
.
,
..
/
f
i
j
.
I
Arkansas Power &. Light Company
' -2-
-
i
',
f
f' -
Should you have any questions concerning.this inspection, we wil1 be. pleased to
discuss them with you.
Sincerely,
ORIGINAL SIGNED BY:~
LJ. CALLAN
L. J. Callan, Director
l
Division of Reactor Projects
l
Enclosure:
Appendix - NRC Inspection Report
50-313/89-05
50-368/89-05
cc w/ enclosure:
Arkansas Nuclear One
- '
ATTN:
J. M. Levine, Execut've Director
'
i
Nuclear Operations
-
P.O. Box 608
. Russellville., Arkansas 72801
Arkansas Radiation Control Program r. rector
bcc to DMB (IE01)
bec distrib. by RIV:
- RRI
- Robert D. Martin, RA
'
- RPB-DRSS
- Section Chief (DRP/A)
Lisa Shea, RM/ALF-
- RIV File
- DRP
- i1IS System
- RSTS Operator
- Project Engineer, DRP/A
- C. Harbuck, NRR Project Manager (MS: 13-D-18)
- C. Poslusny, NRR Project Manager (MS: 13-D-18)
- DRS
- w/766
(
m._ _ _ _ _ . . . _ _ . _ ._
. _ _
_
_ . _ . _