ELV-00516, Revised Application to Amend Licenses NPF-68 & NPF-81, Changing Tech Specs Re Containment Hydrogen Monitors

From kanterella
(Redirected from ELV-00516)
Jump to navigation Jump to search
Revised Application to Amend Licenses NPF-68 & NPF-81, Changing Tech Specs Re Containment Hydrogen Monitors
ML20247D300
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/19/1989
From: Hairston W
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20247D302 List:
References
ELV-00516, ELV-516, NUDOCS 8905250314
Download: ML20247D300 (2)


Text

_ _ _ . -

c m ;a w ce m a

333 PermN An < 2

$3 :dk CtOT. >

,% Cnm a & 3'%

M31 rc Ajp..e

?$f'jl ? ~

  • i r > y , t j 'f'.'
w. c umc na ELV-00516
  1. May 19, 1989 1448n U. S. Nuclear Regulatory Commission ATTN: Document Control Desk i

Washington, D. C. 20555 PLANT V0GTLE - UNITS 1, 2 NRC DOCKETS 50-424, 50-425 OPERATING LICENSES NPF-68, NPF-81 REQUEST TO REVISE TECHNICAL SPECIFICATION 3.3.3.6 .

CONTAINMENT HYDR 0 GEN MONITORS_

Gentlemen:

By letters dated November 7,1988 (VL-76) and December 1,1988 (ELV-00041),

Georgia Power Company-(GPC) proposed to revise the Vogtle Unit 1 Tecnnical Specifications, Appendix A to Operating License nPF-68. Since the time of those submittals, Operating License NPF-68 has been amended t. replace the Unit 1 Technical Specifications with combined Unit 1 and Unit .: Technical Specifications. GPC hereby revises the referenced amendment requ st such that it applies to the combined Unit 1 and Unit 2 Technical Specifications, Appendix A to Operating Licenses NPF-68 and NPF-81.

The preposed amendment revises Specification 3.3.3.6, " Accident Monitoring Instrumentation", by extending the time limit for restoring an inonerable containment hydrogen monitor to operable status. The basis for tie change applies equally to Unit 1 and Unit 2. We have reviewed our 10 CFR 50.92 evaluation and have determined that it is valid for both Unit 1 and Unit 2 and that no significant hazards considerations would be involved. For these reascns, GPC requests that the proposed amendment be approved for the Unit 1 i and Unit 2 Technical Specifications. We have enclosed proposed Unit 1 and Unit 2 Technical Specification pages to replace the Unit 1 pages contained in our earlier submittals.

Please contact this office if you have any questions.

l Sincerely, l

[# C  ;

W. G. Hairston, III JH/gm

Enclosure:

00 Proposed Technical Specification Pages i(

\

xc (See next page) 8905250314 890519 PDR ADOCK 05000424

-P PDC ,

- - _ _ _ _ j

_G h zorgiti Power A p

U. S. Nuclear Regulatory Commission ELV-00516 Page Two c(w): Georgia Power Company Mr. P. D. Rice Mr. C. K. McCoy Mr. G. Bockhold, Jr.

Mr. M. Sheibeni Mr. J. P. Kane NORMS U. S. Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. J. B. Hopkins, Licensing Project Manager, NRR Mr. J. F. Rogge, Senior Resident Inspector, Vcgtle State of Georgia Mr. J. L. Ledbetter, Commissioner, Department of Natural Resources 1