Forwards Insp Repts 50-313/89-09 & 50-368/89-09 on 890307-10.No Violations or Deviations Noted
ML20247Q915
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 04/03/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20247Q919 List:
References
NUDOCS 8904070220
Download: ML20247Q915 (2)


See also: IR 05000313/1989009

Text

y

-.

..

1

c.

.

. . ..

APR 3 1989 ' l

!

In Reply Refer To: 4

Dockets: 50-313/89-09

50-368/89-09 ,

1

!

'

Arkansas Power & Light Company

ATTN: Mr.. Gene Campbell

Vice' President, Nuclear

Operations - -

P.O. Box 551 )

Little Rock, Arkansas _ 72203  :

Gentlemen: 1

This refers to the inspection conducted by Messrs. M.-E. Murphy and

~ C.. E. Johnson of this office and Mr. J. Rajan of the Office of Nuclear Reactor

Regulations (NRR) during the period March 7-10, 1989, of activities authorized

by NRC Operating Licenses DPR-51 and NPF-6 for the Arkansas Nuclear One

facility, and_ to the discussion of. our findings' with Mr. J. M. Levine and other

members of your staff at the conclusion of the inspection.

Areas examined during the inspection included Unit 1 decay heat removal. system

pipe supports and_ hanger damage, Unit 2 emergency diesel generator exhaust

manifold fires, and containment temperature profiles for both units. Within'these

areas, the inspection consisted of selective examination of- procedures and

representative records., interviews with personnel, and observations by the NRC:

inspectors. The inspection findings are documented in'.the enclosed inspection

report.

Within the scope of the . inspection. no violations or deviations were identified.

The deportability to the NRC of issues discussed in this report was not addressed

during this inspection. A management meeting will be scheduled in the near

future in Region IV where licensee reporting requirements will be discussed.

We have also examined actions you h' ave taken with regard to previously . -!

identified inspection _ findings. The status.of these items is identified in

paragraph 2 of the enclosed report.-

Should you have any. questions concerning;this inspection, we will be pleased to

discuss them with you.

Sincerely,

Oziginal Qad E .

14 L CaUau ]

L. J. Callan, Director 'l

Division of Reaucor Projects

Enclosure: (see next page)

RIV:RI*

MEMurphy/tw

RI*

CEJohnson

C:PSS*

TFStetka

C:TPS*

WCSeidle

D:DRS*

JLMilhoan

D:D k

,WCallan

]

/ /89 / /89 / /89 / /89 / /89 y/J/89 1

8904070220 090403

PDR

e

@

ADOCK C5000313

PDC

$W \ ( i

~

- _-

m

. . ..

. .

Arkansas Power & Light Company -2- ,

Enclosure:

Appendix - NRC Inspection Report

50-313/89-09

50-368/89-09 _

cc w/ enclosure:

Arkansas Nuclear One

' ATTN: J. M. Levine,-Executive

Director, Nuclear Operations

P.O. Box'608

Russellville, Arkansas 72801

Arkansas. Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

  • RRI *R. D. Martin, RA
  • RPB-DRSS *Section Chief (DRP/A)

Lisa Shea, RM/ALF *RIV File

  • DRP * MIS System
  • RSTS Operator * Project Engineer, DRP/A
  • DRS *C. Johnson
  • T. Stetka *W. Seidle
  • M. Murphy
  • C. Harbuck, NRR Project Manager (MS: 13-D-18)
  • C. Poslusny, NRR Project Manager (MS: 13-D-18)
  • w/766

l

A

1

. _ - - _ _ - _