Text
y
- .
..
.
c.
. . ..
APR
3 1989 '
l
4
In Reply Refer To:
Dockets: 50-313/89-09
50-368/89-09
,
1
Arkansas Power & Light Company
'
ATTN:
Mr.. Gene Campbell
Vice' President, Nuclear
Operations -
-
P.O. Box 551
)
Little Rock, Arkansas _ 72203
Gentlemen:
1
This refers to the inspection conducted by Messrs. M.-E. Murphy and
~ C.. E. Johnson of this office and Mr. J. Rajan of the Office of Nuclear Reactor
Regulations (NRR) during the period March 7-10, 1989, of activities authorized
by NRC Operating Licenses DPR-51 and NPF-6 for the Arkansas Nuclear One
facility, and_ to the discussion of. our findings' with Mr. J. M. Levine and other
members of your staff at the conclusion of the inspection.
Areas examined during the inspection included Unit 1 decay heat removal. system
pipe supports and_ hanger damage, Unit 2 emergency diesel generator exhaust
manifold fires, and containment temperature profiles for both units. Within'these
areas, the inspection consisted of selective examination of- procedures and
representative records., interviews with personnel, and observations by the NRC:
inspectors. The inspection findings are documented in'.the enclosed inspection
report.
Within the scope of the . inspection. no violations or deviations were identified.
The deportability to the NRC of issues discussed in this report was not addressed
during this inspection. A management meeting will be scheduled in the near
future in Region IV where licensee reporting requirements will be discussed.
We have also examined actions you h' ave taken with regard to previously .
-!
identified inspection _ findings. The status.of these items is identified in
paragraph 2 of the enclosed report.-
Should you have any. questions concerning;this inspection, we will be pleased to
discuss them with you.
Sincerely,
Oziginal Qad E
.
14 L CaUau
]
L. J. Callan, Director
'l
Division of Reaucor Projects
Enclosure:
(see next page)
D:D k
]
RIV:RI*
RI*
C:PSS*
C:TPS*
D:DRS*
MEMurphy/tw
CEJohnson
TFStetka
WCSeidle
JLMilhoan
,WCallan
/ /89
/ /89
/ /89
/ /89
/ /89
y/J/89
1
8904070220 090403
e
ADOCK C5000313
$
@
W
\\ (
i
~
- _-
m
.
.
.
..
.
Arkansas Power & Light Company
-2-
,
Enclosure:
Appendix - NRC Inspection Report
50-313/89-09
50-368/89-09
_
cc w/ enclosure:
Arkansas Nuclear One
' ATTN:
J. M. Levine,-Executive
Director, Nuclear Operations
P.O. Box'608
Russellville, Arkansas 72801
Arkansas. Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
- RRI
- R. D. Martin, RA
- RPB-DRSS
- Section Chief (DRP/A)
Lisa Shea, RM/ALF
- RIV File
- DRP
- MIS System
- RSTS Operator
- Project Engineer, DRP/A
- DRS
- C. Johnson
- T. Stetka
- W. Seidle
- M.
Murphy
- C. Harbuck, NRR Project Manager (MS:
13-D-18)
- C. Poslusny, NRR Project Manager (MS:
13-D-18)
- w/766