Forwards Insp Rept 50-424/89-13 on 890327-31 & Notice of Violation
ML20247M083
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 05/15/1989
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20247M088 List:
References
NUDOCS 8906020354
Download: ML20247M083 (2)


See also: IR 05000424/1989013

Text

  • ;,- .

,

\jf 6

I

"

.

May 25, 1989

Docket No. 50-424

License No. NPF-68

Georgia Power Company

ATTN: Mr. W. G. Hairston, III

Senior Vice President -

Nuclear Operations

P. O. Box 1295  ;

Birmingham, AL 35201 -q

Gentlemen:  !

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT N0. 50-424/89-13)  :

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted

by B. Breslau on March 27-31, 1989. The inspection included a review of

activities authorized for your Vogtle Unit I facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed Inspection Report. 3

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

The inspection findings indicate that certain activities appeared to violate i

NRC requirements. The violations, references to pertinent requirements, and

elements tu be included in your response are described in the enclosed Notice

of Violation.

We are particularly concerned about the adequacy of your corrective action

program. Each example cited in the enclosed Notice of Violation had been

previously identified to you by the NRC as a violation or weakness. In fact,

the violation pertaining to operator required reading was previously cited for

failure to take adequate corrective action. Aggressive management attention i

is needed to strengthen your corrective action program.  ;

The responses directed by this letter and its enclosures are not subject to the  !

clearance procedures of the Office of Management and Budget as required by the  !

Paperwork Reduction Act of 1980, Pub. L. No.96-511. l

1

0906020354 8905154 4 'l

DR ADOCK 050

L__ _ -_- -_ - J 'I 1

_ _ _

. .

,

, .

.

'

Georgia Power Company 2- May 15, 1989

Should you have any questions concerning this letter, please contact us.

Sincerely,

(Original' signed S. D. Ebneter) '

Stewart D. Ebneter

Regional Administrator

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

cc w/encis:

R. P. Mcdonald, Executive Vice

President, Nuclear Operations

P. D. Rice, Vice President, Project

Director.  ;

C. W. Hayes, Vogtle Quality l

Assurance Manager

G. Bockhold, Jr. , General Manager,

Nuclear Operations

J. P. Kane, Manager Licensing

and Engineering

J. A. Bailey, Project Licensing

Manager

B. W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

D. Kirkland, III, Counsel,

Office of the Consumer's Utility

-Council

D. Feig, Georgians Against

i

Nuclear Energy

State of Georgia

bec w/encis:

E. Reis, OGC

J. Popkins, NRR

M. Sinkule, RII

NRC Resident Inspec. tor

Document Control Desk

.~

RII RII RIT RI RII

h k n)jff e at'

/.$Breslau:ser PKd g TP6bbles pSinkule

04/fL/89 [h/bPaulk

04// t/89 04/ W 89 04/[7/89

04/jf/89

I

RII R RII, .

RII

6# -

1AHerdt L eyes jhA son MErnst

l '4/J 3/89 04/6/89 J'04/f/89

/ 04/ /89

l; ,

1

'

_ _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ ______._______________o