Text
\\jf
6
- ;,- .
,
I
"
.
May 25, 1989
Docket No. 50-424
License No. NPF-68
Georgia Power Company
ATTN: Mr. W. G. Hairston, III
Senior Vice President -
Nuclear Operations
P. O. Box 1295
Birmingham, AL 35201
-q
Gentlemen:
!
SUBJECT:
(NRC INSPECTION REPORT N0. 50-424/89-13)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted
by B. Breslau on March 27-31, 1989.
The inspection included a review of
activities authorized for your Vogtle Unit I facility.
At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed Inspection Report.
3
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
The inspection findings indicate that certain activities appeared to violate
i
NRC requirements.
The violations, references to pertinent requirements, and
elements tu be included in your response are described in the enclosed Notice
of Violation.
We are particularly concerned about the adequacy of your corrective action
program.
Each example cited in the enclosed Notice of Violation had been
previously identified to you by the NRC as a violation or weakness.
In fact,
the violation pertaining to operator required reading was previously cited for
failure to take adequate corrective action.
Aggressive management attention
i
is needed to strengthen your corrective action program.
The responses directed by this letter and its enclosures are not subject to the
!
clearance procedures of the Office of Management and Budget as required by the
!
Paperwork Reduction Act of 1980, Pub. L. No.96-511.
l
1
0906020354 890515
'l
DR
ADOCK 050
4 4
J 'I
L__ _ -_- -_ -
1
_ _ _
.
.
,
.
,
.
'
Georgia Power Company
2-
May 15, 1989
Should you have any questions concerning this letter, please contact us.
Sincerely,
(Original' signed S. D. Ebneter) '
Stewart D. Ebneter
Regional Administrator
Enclosures:
1.
2.
NRC Inspection Report
cc w/encis:
R. P. Mcdonald, Executive Vice
President, Nuclear Operations
P. D. Rice, Vice President, Project
Director.
C. W. Hayes, Vogtle Quality
l
Assurance Manager
G. Bockhold, Jr. , General Manager,
Nuclear Operations
J. P. Kane, Manager Licensing
and Engineering
J. A. Bailey, Project Licensing
Manager
B. W. Churchill, Esq., Shaw,
Pittman, Potts and Trowbridge
D. Kirkland, III, Counsel,
Office of the Consumer's Utility
-Council
D. Feig, Georgians Against
Nuclear Energy
i
State of Georgia
bec w/encis:
E. Reis, OGC
J. Popkins, NRR
M. Sinkule, RII
NRC Resident Inspec. tor
Document Control Desk
.~
RI
RII
h
k
n)jff
RII
RII
RIT
e t'
/.$Breslau:ser[h/bPaulk
a
PKd
g
TP6bbles
pSinkule
04/fL/89
04// t/89
04/ W 89
04/[7/89
04/jf/89
I
RII
R
RII,
.
RII
6#
-
1AHerdt
L eyes
jhA
son
MErnst
l
'4/J 3/89
04/6/89
J'04/f/89
04/ /89
/
l;
,
1
'
_ _ . _ _ _ _ _ _ _ _ _ . _ _ _ _
______._______________o