ML20247L625
| ML20247L625 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 08/08/1989 |
| From: | Morris K OMAHA PUBLIC POWER DISTRICT |
| To: | Martin R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML20247L619 | List: |
| References | |
| LIC-89-758, NUDOCS 8909250031 | |
| Download: ML20247L625 (2) | |
Text
_ _ _ _ _ _
c L
l f
a.-%,,
f ji[$@g~~ ggK Omaha Public Power District
!l j5y
-.y 1623 Harney Omaha. Nebraska 68102 2247 is f.
402/536 4000 j\\
LN;AUGII1999)I!bf w
August 8, 1989 u
i LIC-89-758
~~~~ ^
Mr. Robert D. Martin Regional Administ!ator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011
References:
1.
Docket No. 50-285 Martin) dated July 27, 1989 (LIC-89-711) gion IV (R. D.
Letter from OPPD (K. J. Morris) to NRC Re 2.
3.
Letter from NRC (J. L. Milhoan) to OPPD (K. J. Morris) dated August 1, 1989 Gentlemen:
SUBJECT:
Methodology and Interim Milestones for Revising Safety-Related Procedures At a meeting held at the Reg (ion IV offices on July 28, 1989 between the NRC and Omaha Puplic Power District 0 PPD), and as identified in Reference 3, you requested that OPPD provide a priority description and interim milestones for revising the procedure categories noted in Reference 2.
The following is a response to that request.
Procedures are being reviewed and revised on a " system" basis within each procedure group, e.g. Operations, I&C, Electrical Maintenance, etc. Generally, system priority has been based on starting with the reactor vessel and reactor coolant system procedures and cioving outward from the reactor vessel to encompass all safety systems. This methodology should ensure the most important safety system procedures are revised first.
Using the above methodology, surveillance test procedures are being revised first to meet our commitments involving our current Surveillance Test Program
' Upgrade. Additionally as detailed in Reference 2, and our July 28, 1989 meeting, emphasis will be placed on verifying and validating safety-related s909250031 89o906 PDR ADOCK 05000285 Io
- %3 J P
PDC 45 Si24 t.mphument witti Equal Opponunity maled emale
___.______._______w
R.
k i
U. S. Nuclear Regulatory Commission LIC-89-758 Page 2 procedures, including those related to Operations and I&C, to be used during the 1990 refueling outage to ensure as many upgraded procedures as possible can l
be used.
1 As presented at the July 28, 1989 meeting, the'following is OPPD's schedule for completing the safety-related procedures identified in Safety Enhancement u
L Program (SEP) No. 48. All of the completion dates are interim milestones with I
the exception of December 31, 1990 which is the revised SEP #48 commitment date.
Procedure Tvoe ComDietion Date Chemistry Prior to 1990 Outage
- Electrical Maintenance Prior to 1990 Outage
- General Maintenance Prior to 1990 Outage
- Mechanical Maintenance Prior to 1990 Outage
- Pressure Equipment Prior to 1990 Outage
- Operations May 15, 1990 1&C December 31, 1990
- Planned start date for the 1990 refueling outage is February 15, 1990.
In summary, even though we have requested that the commitment date be changed from September 30, 1989 to December 31, 1990, we expect that the majority of these upgraded procedures will be in place before the start of the 1990 refueling outage.
If you have any questions on the subject, please contact me.
Sincerely, K
J. Morris Division Manager Nuclear Operations KJM/pjc c: LeBoeuf, Lamb, Leiby & MacRae T. E. Murley, NRC Director, NRR WJRtrMilhoanFNRCDirectoriiReactorProjectsl@gion21V F. J. Hebdon, NRC Project Director A. Bournia, NRC Project Manager P. H. Harrell, NRC Senior Resident Inspector Document Control Desk
- -.