ML20247L153
| ML20247L153 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 09/07/1989 |
| From: | Milhoan J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Campbell G ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20247L158 | List: |
| References | |
| NUDOCS 8909220143 | |
| Download: ML20247L153 (2) | |
See also: IR 05000313/1989030
Text
,
,-
O
l
c .,
'N;
g
yg
'
,
f
h
[in Reply Refer To:
~
L
Dockets: 50-313/89-30
'
50-368/89-30
' Arkansas Power & Light Company
. ATTN: Mr. Gene Campbell
'
'Vice President, Nuclear
..
-Operations
P.O. Box,551-
Little Rock, Arkansas 72203
- Gentieman:
-This. refers to the inspection conducted by Massrs. W. D. Johnson and R. C. Haag'
{
- of this office during the period July 1 through August 15, 1989, of activities
E
' authorized by NRCl0perating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One,
,
Units 1 and 2, 'and to the discussion of our findings .with Mr. N. S. Carns, and
1
other members of your staff at' the conclusion of the inspection.
'
Areas examined during the inspection included followup of events, operational
' safety verification, surveillance, and maintenance. Within these areas,.the
inspection. consisted of selective examination of procedures and representative
(records, interviews with personnel, and observations by the inspectors. The
findings are documented in the enclosed inspection report.
During this inspection, it was found that certairi of your activities wert: in
violation of NRC requirements. Consequently, you are required to respond to
1
this violation, in writing, in accordance with the provisions of Section 2.201
-of the NRC's ," Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Your response should be based on the specifics contained in the
. Notice of Violation (Notice) enclosed with this letter,
t
We are also concerned about the apparent reluctance of plant maintenance
. personnel to obtain engineering support / involvement when discrepancies are
.. identified duri_ng the conduct of maintenance. Such support / involvement is
. essential, from a safety stand point, to assure plant configuration control.
- Two recent observations by our inspectors, documented in paragraph 7 of the
enclosed irispection report and in paragraph 3.a of NRC Inspection
Report 50-313; 368/89-28, indicate that engineering discrepancies are not
'being properly resolved. -Our concern relates to the potential for loss of
configuration control and the attendant potential for unauthorized changes to
plant safety systems and equipment by maintenance. Accordingly, we request
that you review these observations and the results of your own in-process
s
monitoring of maintenance activities by supervision and quality control / quality
j
assurance, to determine the reasons for the observed lack of. engineering
i
involvement and the scope of the observed condition. Your results should be
providad to this office, in writing, along with a description of those actions
!
you have taken, or planned, to improve this essential plant support interface.
l
SVb
56 6
\\
?
<
RIVfSRI $
C:0RP/A
'\\
Milhoan
i
CWarreni
DDChamberlain
-
q /( /89
1/6/89
}c)/7/89
l
i
8909220143 890907
j
DR
ADOCK 0500o313
FDC
j
^
0
__
.-
,
'
.
..
..
b
Arkansas' Power & Light Company
-2-
We have alsol examined actions you have taken with regard to previously
identified' inspection findings. The status of these items is identified in
paragraph 4 of the enclosed report.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
James L. Milhoan, Director
Division of Reactor Projects
Enclosure:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-313/89-30
50-368/89-30
cc w/ enclosures:-
Arkansas Nuclear One
ATTN:
N. S. Carns, Director
Nuclear Operations
P. O. Box 608
Russellville, Arkansas 72801
Arkansas Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
- RRI
- Robert D. Martin, RA
- RPB-DRSS
- SectionChief(DRP/A)
Lisa Shea, RM/ALF
- RIV File
- DRP
- MIS System
- RSTS Operator
- Project Engineer, DRP/A
- C. Harbuck, NRR Project Manager (MS: 13-D-18))
- C. Poslusny, NRR Project Manager (MS: 13-D-18
- DRS(2)
- w/760