7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION THE CLEVELAND ELECTRICAL ILLUMINATING COMPANY.ET AL.
DOCKET NO. 50-440 NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Comission (Commission) has issued Amendment No. 21 to Facility Operating License No. NPF-58, issued to The Cleveland Electric Illuminating Company, Duquesne Light Company, Ohio Edison Company, Pennsylvania Power Company and Toledo Edison Company (the licensees), which revised the Technical Specifications for operation of the Perry Nuclear Power Plant, Unit No.1, located in Lake
(
County, Ohio. The amendment was effective as of the date of issuance.
- he amendment modified the Technical Specifications to add two valve.? to Table 3.6.4-1, Containment Isolation Valves, and one valve contrcl switch to Table 3.3.7.4-1 Division 1 Remote Shutdown System Controls. This is as a result of a system modification adding two valves to the Suppression Pool Cleanup System to avoid making one leg of the Residual Heat Removal System inoperable while in suppression pool cleanup.
l The application for the amendment complies with the standards and requirementsoftheAtomicEnergyActof1954,asamended(theAct),
and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Co:nmission's rules and regulations in 10 CFR Cha p tr I, which are set forth in the license 8906010099 890523 PDR ADOCK 05000440 P
PDC l
. _ _ _ - _ _ _ _______-____ _ A
T-
,,ef g-t i
Notice of Consideration of Issuance of Amendment and Opportunity for Hearing in connection with this action was published in the FEDERAL REGISTER on March 20, 1989 (54 FR 11463).
No request for a hearing or petition fcr leave to intervene was filed following this notice.
The Comission has prepared an Environmental Assessiant related to the action and has determined not to prepare an environmental impact statement. Based upon the environmental assessment, the Commission has concluded that the issuance of this amendment will not have a significant effect on the quality of the human environment.
Forfurtherdetailswithrespecttotheactionsee(1)theapplication for amendment dated January 18,1989,(2) Amendment No. 21 to License
~
No. NPF-58, (3) the Comm,ssion's related Safety Evaluation dated May 23, 1989 and (4) the Environmental Assessment dated May 16, 1989 All of these items are available for public inspection at the Comission's Public Document Room, Gelman Building, 2120 L Street NW, and at the Perry Public Library, 3753 Main Street, Perry, Ohio 44081. A copy of items (2),(3)and(4)maybeobtaineduponrequestaddressedtothe U.S. Nuclear Regulatory Comission, Washington, D.C. 20555, Attention:
Director, Division of Reactor Projects III, IV, Y and Special Projects.
Dated at Rockville, Maryland this 23rd day of May 1989.
TOR THE NUCLEAR REGULATORY C0!EISSION ohn N. Hannon, Director I
Project Directorate III-3 Division of Reactor Projects - III, IV, Y and bpecial Projects Office of Nuclear Reactor Regulation j
l
-