m
' September 5,4 1989 IDocketNo.-50-346-DISTRIBUTION:
% D6Ctet THet > NRC & Local PDRs PDIII-37/f~ -HVirgilio Mr. Donald C.. Shelton.
JHannon TWambach Vice'Presidenti-Nuclear' PKreutzer EJordan-
-Toledo. Edison Company-BGrimes OGC-WF1 c un rb)o c
~PDIII-3 Gray Files:
ACRS(10 Edison Plaza
.Stop 712 300 Madison Avenue Toledo, Ohio. 43652 I A6ee -
Dear' Mr. Shelton:
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION AUDIT FOR VERIFICATION OF RESOLUTION OF IE BULLETIN 79-27 CONCERNS (TAC NO. 68102)
Enclosed is the Safety Evaluation (SE) of the staff's audit of your response to IE Bulletin 79-27, for Davis-Besse Nuclear Power Station. Based on the SE, the staff concludes that Toledo Edison Company has adequately resolved the concerns of the bulletin for Davis-Besse Nuclear Power Station in design and procedure.
However, during the audit, the staff was concerned that you had no procedures for testing the automatic bus-transfer switches. As discussed'in the exit 7
meeting, you committed to evaluate our position that periodic testing of the switches using an approved procedure is necessary to demonstrate'their reliability.: We request that you provide in writing the results of your evaluation and your plans for testing of these switches within 60 days of. the '
receipt of this letter.
The audit. team appreciated the outstanding support your staff provided during-the conduct of the audit. Those members of your staff who assisted in that effort are to be commended.
Please note that TAC No. 68102 will remain open until the entire series of audits of the Babcock and Wilcox Safety and Performance Improvement Program for Davis-Besse is completed. The reporting and/or recordkeeping requirements contained in the letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.
Sincerely,
/s/
Thomas V. Wambach, Sr. Project Manager Project Directorate III-3 Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation
Enclosure:
As stated cc:
See next page e
'/ k[
'y%
f [j{
Office:
LA/PDI
-3 PM'/P III-3 PDM9 3
\\
Surname: PK TWambach/tg JHannjo s
(1 g /89 y / f/89 9 / f/89 Date:
\\gd' 8909150352 890905 PDR ADOCK 05000346 O
i l
Mr. Donald C. Shelton Davis-Besse Nuclear Power Station J
. Toledo Edison Company
. Unit No. 1
.cc:
David E. Burke, Esq.
The Clevelano Electric Radiological Health Program-Illuminating Company Ohio Department of Health P. O. Box 5000 1224 Kinnear Road i
-Cleveland, Ohio 44101 Columbus, Ohio 43212 i
Mr. Robert W. Schrauder Attorney General Manager, Nuclear Licensing Department of Attorney Toledo Edison Company General Edison Plaza 30 East Broad Street v
300 Madison Avenue Columbus, Ohio 43215 Toledo, Ohio 43652 Mr. James W. Harris, Director Gerald Charnoff, Esq.
(Addressee Only) 4
-Shaw, Pittman, Potts Division of Power Generation and Trowbridge Ohio Department of Industrial Relations 2300 N Street N.W.
2323 West 5th Avenue
. Washington, D.C. 20037 P. O. Box 825 Columbus, Ohio 43216 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Ohio Environmental Protection Agency 799 Roosevelt Road 361 East Broad Street Glen Ellyn, Illinois Columbus, Ohio 43266-055B President, Board of Mr. Robert B. Borsum County Commissioners of Babcock & Wilcox Ottawa County Nuclear Power Generation Division Port Clinton, Ohio 43452 Suite 525, 1700 Rockville Pike Rockville, Maryland 20852 State of Ohio Public utilities Commission Resident Inspector 180 East Broad Street U.S. Nuclear Regulatory Commission Columbus, Ohio 43266-0573 5503 N. State Route 2 Oak Harbor, Ohio 43449 1
I l