.- _ _ _ _ -

l

. September 11, 1989  ;

Docket No. 50-302 MEMORANDUM FOR: Herbert N. Berkow, Director -l Project Directorate II-2 Division of Reactor Projects - 1/II FROM: Harley Silver, Senior Project Manager Project Directorate 11-2 Division of Reactor Projects - I/II

SUBJECT:

CRYSTAL RIVER UNIT 3 (CP.-3) - CONFIRMATION OF LICENSEE RESPONSE TO NRC BULLETIN 88-03 (TAC N0. 73869)

By letter dated June 15, 1988 Florida Power Corporation (the licensee) responded to NRC Bulletin 88-03. In its response, the licensee confirmed that activities required to address the issues discussed in the Bulletin have been performed, and it was concluded that Crystal River Unit 3 does not use the General Electric HFA latching relays in safety-related or non-safety service. Therefore, we consider this action complete, and TAC No. 73869 closed.

By copy of this remorandum, Region II is advised of the licensee's position on this matter.

Original signed by Harley Silver, Senior Project Manager Project Directorate 11-2 Division of Reactor Projects - I/II DISTRIBUTION Docket File-PD22 Rdg File G. Lainas 14/H/3 H. Silver G. Wunder D. Miller C.Y. Shiraki 14/E/21 M. Sinkule RII

[ BULLETIN 88-03/CR-3 ,T C 7.969]

LA:PDII-2 I-2 f P :)1ver:jd 0:P -2/

HS1 SCerk DMiller >&

09/ti/89 09/ f( /89 L9/D/89

\ 'O 1

8909150306 890911 E PDR ADOCK 05000302 O FDC iD