ML20247E007
| ML20247E007 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 05/16/1989 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Corbin McNeil PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20247E013 | List: |
| References | |
| NUDOCS 8905260093 | |
| Download: ML20247E007 (2) | |
See also: IR 05000352/1989009
Text
.
_ _ _ - _ _ _ _ _ _ _ _ _ _ - _
w
f
,;
.s
1
..
, ;>
MAY 161999
Doc'et Nos. 50-352
)
k
'
50-353
Philadelphia Electric Company
l
! ..
ATTN: .Mr. C. A. McNeill
L
Executive Vice President-Nuclear
Correspondence Control Desk
!
P.O. Box 7520
)
Philadelphia, Pennsylvania 19101
'
Gentlemen:
Subject:
Inspection No. 50-352/89-09 and 50-353/89-15
This letter transmits the. routine-resident safety inspection-by Messrs.
~
T. Kenny, L. Scholl and R. Fuhrmeister from March 29 - Apr1123,1989 at the
Limerick Generating Station, Limerick, Pennsylvania.
The inspection consisted-
of document reviews, interviews, and observation of activities. The results
have been discussed with Messrs. Martin McCormick, .Jr. and W. T. Ullrich and
i
other members of your staff.
Based on our inspection, an apparent violation of failure to follow procedures
occurred during the. performance <of maintenance on the main steam safety relief
valves. 'This apparent violation has been categorized by severity level
-according to 10 CFR'Part 2, Appendix C (Enforcement Policy).
You are required
to' respond to this violation and in preparing your response you should follow
the instructions in Appendix A.
In accordance with 10 CFR.2.790(a), a copy of this letter and the enclosures
'
will be placed in the Public Document Room. The response directed by this
letter and the accompanying notice are not subject to the. clearance procedures
of the Office of Management and Budget as required by the Paperwork Reduction
Act of 1980, PL 96-511.
r
.Your cooperation is appreciated.
Sincerely, g gggg gy
Edward C. Wenzinger, Chief
,
Projects Branch No. 2
Division of Reactor Projects
Enclosures:
1. -Appendix A, Notice of Violation
2.
NRC Region I Inspection Report 50-352/89-09 and 50-353/89-15
0FFICIAL RECORD COPY
CIR LIM 89-09/15 - 0001.0.0
89'05260093 s90516
,
05/15/89
I \\
-ADOCK0500g2
7
.PDR
O
_ _ _ _
_
_ _ _ _ _ _
_.
,
1.
-'
t
b
i
'
Philadelphia Electric Company
2
.
-
,
,
MAY 161999
.
cc w/encls:
John S. Kemper, Sr., Senior Vice President-Nuclear Services
G. M. Leitch,- Vice President, Limerick Generating Station
Troy B. Conner, Jr. , Esquire
Eugene J. Bradley, Esquire, Assistant General Counsel
W. M. Alden, Director, Licensing Section
S. J. Kowalski, Vice President, Nuclear Engineering
W. T. Ullrich, Manager, Limerick Unit 2 Startup
J. W. Gallagher, Vice President-Nuclear Services
A. S. MacAinsh, Manager, Limerick Quality Division
Dave Honan, PEco Licensing
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bec w/encls:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
J. Linville, Section Chief, DRP
J. Durr, Branch Chief, DRS
B. Clayton, EDO Office
R. Clark, NRR Project Manager
T. Johnson, SRI, Peach Bottom
T. Kenny, SRI, Limerick
J. H. Williams, Project Engineer
E. Conner, Reactor Licensing / Risk Engineer
J
e
}
R :DRP
yRI:DRP
P
jdKenny
Linville
(Wenzi
er
5/11/89
g
,p
0FFICIAL RECORD COPY
CIR LIM 89-09/15 - 0002.0.0
05/15/89
i
i
)