Requests Explanation as to How NRC Could Have Testified That Taunton Reception Ctr Viable & Ready to Perform Safety Function in Event of Nuclear Disaster & Why Emergency Planning Staff Did Not Rept Existing Conditions
ML20247D376
Person / Time
Site: Pilgrim
Issue date: 01/17/1989
From: Thompson A
PLYMOUTH, MA
To: Zech L
NRC COMMISSION (OCM)
Shared Package
ML20247D342 List:
References
NUDOCS 8903310058
Download: ML20247D376 (5)


Text

--- _ - - -

p .

^

TOWN OF PLYMOUTH g g s,,g omCE OF SELECTMEN

$'! THE SELECTMEN

"" EnMAS GEORGE W. CAMERON 11 Lincoln Street -

DAVID F. MALAGthi

^ WILLIAM R GRIFFIN od. Massadmseus OM60 ALBA'C. TiiOMPSON ChaPmart EXECLTTIVE SECRETARY (508)747-1620 January 17, 1989 Lando Zech, Chairman Nuclear Regulatory Commission 1 White Flint North 1155 Rockville Pike Rockville, MD 20852

Dear Mr. Zech:

At the December 9, 1988, hearing in Rockville, Maryland, the Commissioners listened to the testimony of the five  ;

communities in the emergency planning zone around the Pilgrim Nuclear Power Station. In every instance the communities testified that radiological emergency response planning, equipment, personnel, and training were incomplete and untested.

The Nuclear Regulatory Commissioners evidently did not believe the testimony of those who have the legal obligation for planning and execution. It chose to accept the testimony of its own staff although that staff had made exactly one visit to the Plymouth Civil Defense Df. rector in three years and that was made in November 1988 one month before the December hearing. The same staff never examined the drafts of any of the one hundred required implementing procedures required by the Town of Plymouth for its safety in the event of nuclear disaster.

Now it has been revealed that the Taunton reception center designated to accept thousands of evacuees from the Town of Plymouth is not prepared to do so. It lacks decontamination capability. Its lacks basic materials such as clothing changes. Indeed the very building (Cain) will not be .

renovated by Boston Edison, and another building will have to be built. When?

Please explain to us how your staff could have testified that this reception center was viable and was ready to perform its functions. Explain to us how our draft plans that give repeated instructions to proceed to the Taunton Reception Center can possibly be of value.

cM $gTI7 CORRESPONDENCE PNU

l s.

l .

'Lando Zech, Chairman Nuclear Regulatory Commission January 17, 1989 Page 2 The Bridgewater Reception Center is also lacking some capability.

Why didn't your emergency planning staff honestly report these conditions to you. These are shocking revelations, and we deserve an explanation.

Very truly yours, BOARD OF SELECTMEN Alba C.' Thompson Chairman ACT/1t cc Civil Defense Director EPZ Communities Peter Agnes, Assistant Secretary, Public Safety Congressman Gerry Studds Senator Edward Kennedy Senator John Kerry State Senator Edward Kirby State Representative Peter Forman State Representative Robert Kraus

r:.

  1. #Cg'?

,f ' UNITED STATES

-1

"~",;.8 al NUCi. EAR RE2ULATORY COMMISSION . .

]

. . . . 5' E' . WASHINGTON, D. C. 20656 - [ '

  • p, EDO Princioal' Correspondence Conti ci jFROM:. -DUE: 02/15/09 EDO CONTROL: 0004241'  !

DOC DT: 01/24/89 .1 FINAL. REPLY: ,

! -Albd C.LThompson, Chairman -l k Plymouth Selectmen .

t-TO Chairman;Zech ,

1 FOR' SIGNATURE-OF: ** PRI ** CRC.NO: 89-0093' q

-Chsirman DESC: ROUTING: ,

j PROTESTS THE' SUBMISSION OF A " PERIODIC STATUS Stello- ,

REPORT ON OFF-SITE EMERGENCY PLANNING"-BY Taylor -.

BOSTON EDISON" Thompson <

]

Blaha DATE: 02/07/89- Russell, RI- l Murray, OGC' j ASSIGNED:TO:: ' CONTACT:

NRR Murley l SPECIAL INSTRUCTIONS OR REMARKS:

l i

NRR RECEIVED: FEB.,7,zi989,.

DREPi.CO_NGE.L_M , o ACTION.n gg . - - - M,_'E.,. . - - . 1 NRR ROUTING: MURLEY/SNIEZEK MIRAGLIA "l YARGA- l CRUTCHFIELD GILLESPIE M0SSBURG 1

'l

.__.____.__m. _ _ _ _

  1. .  %, - UNITED STATES l

". ["5 g NUCLEAR RE::ULATORY COMMISSION WASHINGTON, D. C. 20655  ; 1 kt,

~ 2

% {DO Princioal Correspondence Control

.I FROM: DUE: 02/15/89 EDO CONTROL: 0004241 DOC DT 01/24/89 l FINAL REPLY:

Albn C. Thompson, Chr.irman ,

Plymouth Selectmen TO:

Chairman Zech .

1 FOR SIGNATURE OF ** PRI ** CRC NO: 89-0093 1

Chairman DESC: ROUTING:

. PROTESTS THE SUBMISSION OF A " PERIODIC STATUS Stello REPORT ON OFF-SITE EMERGENCY PLANNING" BY Taylor BOSTON ~ EDISON" Thompson Blaha DATE: 02/07/89 Russell, RI Murray, DGC ASSIGNED TO: CONTACT: . .

NRR Murley SPECIAL INSTRUCTIONS OR REMARKS:

I ,

5bN 3: ^

NRR ROUTING: MURLEY/SNIEZEK MIRAGLIA VARGA CRUTCHFIELD GILLESPIE HOSSBURG am-_ _ - - - - _ _ _ _ _ - . _ _ _ _ _ _ _ _ _ _ _

[ .

s.

i

~

OFFICE OF.THE SECRETARY CORRESPONDENCE CONTROL. TICKET

' PAPER NUMBER: -CRC-89-0093. LOGGING DATE:'Feb 6 89 l

ACTION OFFICE: EDO l l

A.C. Thompson l AUTHOR:

AFFILIATION: l NA (MASSACHUSETTS) l LETTER DATE: TA,J 12g9 Fe -- FILE CODE: ID&R-5 Pilgrim

SUBJECT:

Board of Selectmen protests the submission of a periodic status rpt on off-site emegency planning ACTION: Signature of Chairman DISTRIBUTION: RF, Cars, OGC SPECIAL HANDLING: None NOTES: i DATE DUE: Feb 17 89 SIGNATURE: . DATE SIGNED:

AFFILIATION:

i Md 011. 200

we .2-7 J 7 Time _ dNs.' .

80 -004241

- - _ _ _ - _ _ _ _ _ _ _ _ _