Advises That Util 890303 Proposed Alternate Schedule for Completing Item 1.b to NRC Bulletin 88-011 Not Approved.Nrc Expects That Efforts Will Be Accelerated to Meet Completion Dates as Committed to by Westinghouse Owners Group
ML20247D337
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/19/1989
From: Swenson W
Office of Nuclear Reactor Regulation
To: Fay C
WISCONSIN ELECTRIC POWER CO.
References
IEB-88-011, IEB-88-11, TAC-72155, TAC-72156, NUDOCS 8905250364
Download: ML20247D337 (3)


Text

.

May 19, 1989 D:cket Nos. 50-266 Distribution-and 50-301 Docket tile WSwenson l

HRC & Local PDRs UGC Mr. C. W. Fay, Vice President PDIII-3 r/f EJordan Nuclear Power Department GHolahan BGrimes Wisconsin Electric Power Company MVirgilio ACRS(10) 231 West Michigan Street, Room 308 PKreutzer Gray File Milwaukee, Wisconsin 53201

Dear Mr. Fay:

SUBJECT:

SCHEDULAR RELIEF REQUEST RELATED TO NRC BULLETIN 88-11

" PRESSURIZER SURGE LINE THERMAL STRATIFICATION", ITEM 1.b (TACNOS.72155AND72156)

The purpose of this letter is to inform you of the implementation schedule for Item 1.b of NRC Bulletin 88-11, " Pressurizer Surge Line Thermal Stratification" that was mutually agreed upon between the NRC staff and the 4 westinghouse Owners Group (WOG) during an April 11, 1989 meeting.

By letter dated March 3,1989, Wisconsin Electric Power Company proposed an alternate schedule for the completion of the bounding analysis required by Item 1.b of NRC Bulletin 88-11 regarding the design adequacy of the pressurizer surge line, takir.g into account the effects of thermal stratification. Your proposed schedule for completion of Item 1.b (2 years from the date of the Bulletin) was consistent with the alternate schedule proposed by the Westing-house Owners Group (WOG) program.

During an April 11, 1989 meeting between the staff and the WOG, the staff expressed that the alternate schedule as originally proposed by the WOG was unacceptable.

Based upon additional discussion, the WOG agreed to notify its membership that licensees of plants in operation over 10 years should, by the end of May 1989, complete and have available for NRC audit, their bounding analysis as related to Item 1.b of the Bulletin, and submit to the NRC, a Justification for Continued Operation (JCO) in the event the results of the bounding analysis do not confirm the adequacy of the pressurizer surge line for the design life of the plant.

Licensees of plants in operation less than 10 years would be notified that they were required to complete the required actions of Item 1.b within the originally-stated period (1 year from receipt oftheBulletin). The staff found these proposals to be acceptable.

analysis, to which your plant-specific variables (you with a " generic" bounding It is our understanding that the WOG will provide e.g., seismic and thermal loadings) will need to be added and incorporated.

Your analysis should assess all aspects of thermal stratification and thermal striping, including bounding evaluations on stresses and fatigue, based on currently available information.

9 I

8905250364 890519 PDR ADOCK 05000266 Q

PDC

^

,.;.e Mr. C. W. Fay 2

' Based upon your participation in the WOG program regarding this issue and absent any other justification, your proposed alternate schedule of. completing Item 1.b is not approved.

It is our expectation that your efforts will be accelerated to meet the completion date(s) as comitted to by the WOG.

Sincerely,

/s/

l Warren H. Swenson, Project Manager Project Directorate III-3 Division of. Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation cc: See next page i

)

[PZR Relief Letter]

ll-3 PDIII-3 T/PDIII-3 LA/PDI'ler Office:

PKr6bt Swenson/mr JHannon Surname:

y / g /89 STg/89 57J1/89 Date:

'5 A s.

'Mr. C. W.' Fay.

Point Beach Nuclear Plant Wisconsin Electric Power Company.

Units 1.and 2 cc:-

Mr. Bruce Churchill, _ Esq.

Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W.

Washington, DC 20037-Mr. James J. Zach, Manager-

-Point Beach Nuclear Plant Wisconsin Electric Power Company 6610 Nuclear Road' Two Rivers, Wisconsin 54241 Town Chairman Town of Two Creeks N'

Route 3 Two Rivers, Wisconsin 54241 Chairman Public Service Commission of Wisconsin Hills Farms State Office Building Madison, Wisconsin 53702 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Office of Executive Director for Operations _

.799 Roosevelt Road Glen Ellyn, Illinois 60137 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, Wisconsin 54241 L