OPERATING DATA REPORT
' DOCKET NO 50-413 DATEMay 15. 1989
' OPERATING STATUS COMPLETED BY R.A. Williars TELEPHONE 704-373-5987
- 1. Unit Nase: Catauba 1
- 2. Reporting Period: April 1, 1989-April 30, 1929 4
.3. Licensed Thereal Poner.(MWt):
3411 4.' Naeeplate Rating (Gross MWe):
1305*
Notes
- Nameplate Rating 5.. Design Electrical Rating (Net MWels' 1145 (Gross MWe) calculated as
- 6. Maxinus Dependable Capacity (Bross MWe):
1192 1450.000 MVA x.90 power
- 7. Maxisue Dependable Capacity (Net MWe):
-1129 factor per Page iii,
- 8. If Changes Occur in Capacity Ratings (Itess Number 3 Through 7) Since Last NUREG-0020.
Report. Give Reascns:
9.. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, if any:
This Month Yr.-to-Date Cueulative
- 11. Hours In Reporting Period.
719.0 2879.0 336'48.0.
- 12. Number Of Hours Reactor Was Critical 649.5 1938.4 24122.2
- 13. Reactor Reserve Shutdown Hours
--0--
--0--
--0--
- 14. Hours Generator On-Line L22.3 1787.6 23391.7
- 15. Unit Reserve Shutdown Hours
--0--
--0--
--0--
- 16. Gross Thereal Energy Benerated (MWH) 2016902 5719100 74657486
- 17. Gross Electrical Energy Generated (MWH) 706383.
1971731 261663E2
- 18. Net Electrical Energy Generated (MWH) 663202 1831368 24466890
- 19. Unit Service Factor 86.6
'62.1 69.5
- 20. Unit Availability Factor 86.6 62.1 69.5
- 21. Unit Capacity Factor (Using MDC Net).
81.7 55.3 63.8
- 22. Unit Capacity Factor (Using CER Net) 80.6 55.6 63.5
- 23. Unit Forced Outage Rate 13.5 10.6 15.2 24.' Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Nnno
- 25. If Shut Dcwn At End Of Report Period. Estimated l' ate of Startup:
- 26. Units In Test Status (Frict to Coseercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL CPERATION l
l l
8905250188 890515
(
PDR ADOCK 05000413 R
t.
PDC lE__
OPERATING DATA REPORT DOCKET'N0' 50-413 UNIT Catawba 1 DATE May 15, 1989 COMPLETED LY R.A. Willians TELEPHONE 704-373-5987 j
1 MONTH A:ril,1989'
=
DE-AVEEASE DAILY POWER LEVEL 041 AVERACE DAILY IC"EK LGIL l
(MWe-Net)'
(MWe-;;et) 1 0
-17
!!30
.I 2'
87' 18.
1130 3
944 19 1126
_ 4..
1119 20 157
-)
~
i
- 5
'1118 '
21 0
6.-
'1126 22 0
7 1125 23 656 8
1127 24 1125 9
1126 25 1118 10 1135 26 1116 11
!!39 27
!!!9 12 1137 28 1124 13-1133 29 11i9 I
14 '
1119 30 1119 15 1114 j
f 16 1133
.. j
- A8M3 E
L N
R Ii 0
3B/
V E
O EE OT E
jtst -
1W5
.)
I C
R DR TN GE
- atrG 4A1J4 T
N T
NU CE NG reoE
- T/
0 C
E R
UO CI EU RK pheU 5C0J(
ROR DC A
EEN ir
(
O C
NE T
RS DLW b P yt
.EEYE CNE WHM T
IN I
O i
rne OMTBN OR OTE ER AI WBD hrtel NAA O
DI' D
T UA P
T xonvi NDDH NTT TFS DT EE TPU EfEEF
)
T EP ACN UOY S
RR NOH 4
E T TE A E H
S R
U AOS
(
K I EL E
E TN WM T S O
D O U PT U
R D IO OU E
ONE D
M A
C L BT O P IL m)
C L AA GR I
RTO an O RL NE T M OCR ri R EI IT C E TET mca T PT DS U TK CNN aSl N ON LO D SA ANO r
p O NE OO E YE EOC ccx C IV HB R SL RC(
SiEt(
S ll a aamr N
O T
duuoe I
N U
X U
R onnth
)
E R
X R
K haaut TC 9
5 N E T
P T
B tMMAO O D S
M S
T e-U 8
(
D 9
P O N
U N
K M1234
)
E 1
M C I
P I
C 3
R O
(
l C
R i
n E
r E
o W
p SM D
B H
B B
i
)
O A
4 YE O
W H
C C
t ST C
a P
(
n D
i N
m A
E a
S T
x S
N TR E
N E NO W
H C EP O
e
)
O T
I VE N
n s
D N
L ER i
n T
O a
e U
M l
c H
TN p
ni TD UW X x
oL S
T
)
R 3 EOF HO
/
1 1
E i
( t t&
T O
MH OSD R
(
I P
s c
ee ig N
E
)
U R
2 A
A A
A rt rn REASON u
ti
(
l r sn io eiv N
2 7
a Rai O
5 1
Fe r
c yTa IS TR 5
1 tngr AU 3
6 nanortrE RO enit oso UH mel atit D
- ptel anar ninuurire ouif gemeh
)
s q a e e pd
)
F F
F F
aEMRROAO 1
TYPE e-(
RABCDEFG
)
2 1
2 9
0
(
1 2
E 4
4 4
4 d
T e
A l
D 9
9 9
9 du 8
8 8
8 ed ce rh P
P oc FS NO.
6 9
0 7
FS 1
2
)
1 i
rI ll
[
DOCKET NO:
50-413 i
UNIT:
Catawba 1 DATE:
05/15/89 NARRATIVE
SUMMARY
Month:
April, 1989 Catawba Unit 1 began the month of April in an unplanned outage caused by inoperability of the Control Room Ventilation Sy: tem.
The unit returned to service at 1231 on 4/02, and following brief holds due to Condensate Booster Pump problems and Nuclear Instrumentation Calibration, reached 100% power at 1330 on 4/03. The unit then operated without any significant reductions until 4/19 at 2310, when the unit began a controlled shutdown to repair a Pressurizer l
Spray Valve and a Reactor Coolant System Pressure Instrument Tube leak. The i
unit was removed from service at 0914 on 4/20 for the above repairs, and 1
returned to service at 2224 on 4/22. The unit returned to 100% power at 0310 on 4/24, where it then operated for the remainder of the month, withcut any further significant reductions.
Prepared by:
J. J. Mead Telephone: 704-373-5762 l
s M(NIELY REFUELING INFORMATION REQUEST 1.
Facility name: Catawba, Unit 1 2.
Scheduled next refuelig shutdown: January, 1990
-s 3.
Scheduled restart following refueling: March 1990
'4.
Will'. refueling or resumption of operation thereafter require a technical specification change or other license amendnent? g If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety.
Review Ccmnittee regarding unreviewed safety questions? N/A 5.
Scheduled date(s) for subnitting proposed licensing action and. supporting information: N/A 6.
Important licensing mnsiderations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new cperating procedures).
7.
Number of fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 196 8.
Present licensed fuel pool capacity: 1418
' Size of requested or planned increase:
9.
Projected date of last refueling which can be accumulated by present licensed capacity: September, 2011 DUKE IONER CCMPANY DATE:
May 15, 1989 Name of
Contact:
J. A. Beavis Phone:
704-373-7567 i
.------_-a-__-----s
[
f V
OPERATING DATA REPORT DOCKET ND 50-414 DATEtv 15. 1989 OPEPAT!kG STATUS COMPLETED BY R.A. Williams TELEPHONE 704-373-5907
- 1. Unit Names Catawba 2
- 2. Reporting Period: April 1, 1989-April 30, 1959
- 3. Licensed Thermal Power (MWt):
3411
- 4. Nameplate Rating (Gross MWe):
130'd Notes # Nameplate Rating
- 5. Design Electrical Rating (Net MWe):
1145' (Bross MWel calculated as
- 6. Maximus Dependable Capacity (Gross MWe):
1192 1450.000 MVA x.90 power
- 7. Maxieus Dependable Capacity (Net MWe):
1129 facter per Page lii,
- 8. If Changes Occur in Capacity Ratings (Itess Number 3 Through 71 Sir.ce Last NURES-0020.
Report. Give Reasons:
- 9. Poner Level Tc Which Restricted, if Any (Net MWe):
- 10. Reason for Restrictions, If any:
This Month Yr.-to-Date Cumulative
- 11. Hours in Reperting Period 719.0 2879.0 23664.0
- 12. Number Of Hours Reacter Was Critical 0.0 1525.9 16628.3
- 13. Reacter Reserve Shutdown Hours
--0--
--0--
--0--
- 14. Hours Generator On-Line 0.0 1497.1 16147.7
- 15. Unit Reserve Shutdown Hours
--0--
--0--
--0--
- 16. Gross Thersal Energy Generated (MWH) 0 4613376 49177601
- 17. Gross Electrical Energy Generated (MWH) 0 1652091 17340212
- 18. Net Electrical Energy Generated (MWH)
-5061 1547032 16183964
- 19. Unit Service Factor 0.0 52.0 68.2
- 20. Unit Availability Factor 0.0 52.0 68.2
- 21. Unit Capacity Factor (Using MDC Net) 0.0 47.6 60.1
^ 22. Unit Capacity Facto.- (using DER Net) 0.0 46.9 59.7
- 23. Unit Forced Outage Rate 0.0 9.0 21.4
- 24. Shutdan Scheduled Over Nat 6 Months (Type, Date, and Duration of Eachlt Currently Refueling
- 25. If Shat Down At End Of Report Period. Estimated Date of Startup: May 16, 1989
- 26. Unit.s In Test Status (Prior to Cosmercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY CCMMERCIAL 0FERATION i
____L___-
~
+
j
^\\'
OPERATINS DATA REPORT l
s LOCKET NO
'50-414'-
UNIT Catawba 2 j
DATE May 15, 1989 1
COMPLETED BY R.A. Williams :
.)
- TELEPHONE 704-373-5907
]
'MDMTH April,1989
.E.
AVERASE DAILY POWER LEVEL DAY AVERASE DAILY POWER LEVEL
-(MWe-Net)
(NWe-Net).
-1 0-17 0
i 2
0 18 0
,j 3
0 19 0
4
-0 20 0
5 0
21 0
.6
-0 22 0
l 7-0 23 0
0 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13-0 29 0
14 0
30 0
' 15..
0 l
- 16 0
i i
.l l
l'
-i a_a____-________________
A8M3 E
E Ii 0
4B/
V E
U tst -
1W5
.)
I C
F atrG 4A1J4 T
N E
reoE T/
0 C
E R
GaepR 0A5 7
E R
ph e U 5C0J(
ROR L
teSRN RTU A
ir -
(
O C
M b P yt
.EEYE CNE R
i rne OMTBN OR O
hrtel NAA O
DI N
xonvi
- NDDH NTT EfEEF
)
4 E T TE A E
(
K I EL E
V E
C N LE S
E L
O U PT U
R C
D M
A P
Y O
C C
m)
C an F
ri O
mca aSl D
r p
N ccx E
SiEt(
S lla aamr N
O T
duuoe I
N X
onnth E
X haaut T
)
C 9
5 N E L
tMMAO U
8
(
O D E
e-M1234 D
9 P O U
)
E 1
M C F
3 R
O
(
l C
R i
n E
r E
o W
p SM D C
i
)
O A
4 YE O R
t ST C a
P
(
n D
i N
m A
E a
S T
x S
N TR E
N E NO W
H C EP O e
)
O T
I VE N n
s D
N L ER i
n T
O a
e U
M l
c H
TN p
ni TD UW X x
oL S
T
)
R 3 EOF HO /
1 E
i (t
t&
T O
MHO SD R
(
I P
s c 'g ee N
E i
)
U R
2 C
rt rn REASON u
ti
(
lr sn io eiv N
0 a
Rai O
0 Fe r
c yTa IS TR 9
tngr AU 1
nanortrE RO 7
enitoso(
UH melatit ptelanar D
ninuurire o uif g e m e s q a e e pd
)
1 TYPE S
aEMRROAO e-(
RABCDEFG
)
2 1
(
E 4
d T
e A
l D
9 du 8
ed ce rh oc FS NO 6
Fs
)
1 l
ll l
[
DOCKET NO:
50-414 UNIT:
Catawba'2 DATE:
05/15/89 NARRATIVE
SUMMARY
Month: April, 1989 Catawba Unit 2 was out of service for the entire month of April for its End of Cycle 2 Refueling Outage.
i Prepared by:
J. J. Mead Telephone:
704-373-5762 l
k
_j
4 MNIHLY REFUELING INFORMATION REQUEST 1.
Facility ninne: Catawba, Unit 2 2.
Sebaduled next refueling shutdown: Currently Refueling 3.
Sch@lM restart following refueling: May, 1989 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license anmak oil? No If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Comnittee regarding unreviewed safety questions? N/A 5.
Scheduled date(s) for subnitting proposed licensing action and supporting infonnation: N/A 6.
Inportant licensing considerations (new or different design or supplier, unreviewed design or perfonnance analysis nethods, significant changes in
& sign or new operating procedures).
7.
Number of fuel assemblies (a) in the core:
193 (b) in the spent fuel pool:
136 8.
Present licensed fuel pool capacity:
1418 Size of requested or planned increase:
i 9.
Projected date of last refueling which can be accamodated by present licensed capacity: January, 2013 DUKE POWER COMPANY DATE:
May 15, 1989 Nane of
Contact:
J. A. Reavis Phone:
704-373-7567 l
-.