ML20247D094

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-313/89-17 & 50-368/89-17 on 890417-21.No Violations or Deviations Noted.Timeliness Problem W/Implementation of New Corrective Action Program & Problems W/Completion of Controlling Procedures Noted
ML20247D094
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 05/15/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20247D097 List:
References
NUDOCS 8905250164
Download: ML20247D094 (2)


See also: IR 05000313/1989017

Text

_

_

,.

.

7,

, .

'

MAY I 51989

.-

'

4

ln' Reply Refer To:

1

Dockets: 50-313/89-17

50-368/89-17.

L

I

!

Arkansas Power & Light Company

ATTN: Mr. Gene Campbell

Vice President, Nuclear

Operations

P.O. Box 551

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted by Messrs. P. C. Wagner, L. D. Gilbert,

and M. E. Murphy of this effice during the period April 17-21, 1989, of

activities authorized by NRC Operating Licenses DRP-51 and NPF-6 for Arkansas

Nuclear One, Units 1 and 2.

Discussions of our findings were held with

Mr. J. Levine and other members of'your staff during and at the conclusion of

the inspection.

Areas examined during the inspection included the actions taken to implement an

integrated corrective cctico program and the response to the Unit 2 extraction

.

steam line break which occurred on April 18, 1989. Within these areas, the

inspection consisted of selective examination of procedures and representative

'

records, interviews with personnel, and observations by the NRC inspectors.

The inspection findings are documented in the enclosed inspection report.

On April 7, 1989, the NRC issued a Notice of Violation and Proposed Imposition

of Civil Penalties related to activities at your facility. One of the

violations addressed your failure to take prompt corrective action once

problems are identified. No violations or deviations are included in this

inspection report. However, the NRC inspectors determined that there was a

timeliness problem with the implementation of the new corrective action program

and noted problems with the completion of the controlling procedures. The NRC

inspectors also discussed the advisability of implementing an aggressive

trending program for identified problems and their resolution.

No separate

response is requested with respect to this inspection report because these

items should be encompassed in your response to .the previous Notice of

Violation and will be followed up in the NRC review of your response to the

previous Notice of Violation.

RIV:RI:PSS*

RI:MQPS*

RI:TPS*

C:M&QPS*

D:DRS*

D:DRP*

PCWagner/tw

LDGilbert

MEMurphy

IBarnes

JLMilhoan

LJCallan

/ /89

/ /89

/ /89

/ /89

/ /89

/ /89

  • previously concurred

-f30I

890525016,4 890515

1

PDR

ADOCK 05000313

Q

PDC

f

g

s

_ _ _ _ _

, _ _ _ _,__-_

. _ _ _ _ _ _ _ _ _

_ -

_-_

.c

g

y

-

,

.

.

.

,.

.

7 ; n y

l
  • <lAfkansasPower& Light. Company

-2-

'

.Should you'have any questions concerning this inspection, we will- be pleased to'

,

discuss them with you.

.

Sincerely.

Original Signed By

"-

. L. J. Callan

,

'

_

L. J. Callan,~ Director .

Division of Reactor Projects

'

' Enclosure:'

~ Appendix .NRC Inspection. Report

'

,

w/ Attachment

,,

i

50-313/89-17-

<

o

.

'

'

'

50-368/89-17.

.

Enc 1osure:

Arkansas Nuclear.Onel

ATTN:

~J..M. Levine, Executive

Director, Nuclear Operations-

,

J.P.O.-Box 608

Russellville, Arkansass 72801.

'

'

ArkansasRadiation.ControlProgramDifector

bec to'.DMB (IE01)

bec distrib. by RIV:

.

'*RRI -

.

  • R. D. Martin, RA

'

  • RPB-DRSS-
  • Section Chief.(DRP/A)

-

Lisa Shea, RM/ALF

  • RIV File-

~

~

  • DRP'
  • MIS' System
  • RSTS Operator
  • Project Engineer (DRP/A)'
  • DRS1

.

  • P. C. Wagner
  • L'.-D. Gilbert
  • M. E. Murphy
  • T. F. Stetka
  • I. Barnes '

-

  • C.Harbuck,NRRProjectManagerL(MS:

13-D-18)

  • C.Poslusny,NRRProjectManager(MS: ~13-D-18)

~

  • w/766.

!

n

i

v;

e

s,

'

...,c-.

,

c

Y _.- ----._. - . _ _ - . . ,

- _ .

_ . . - - .

-