ML20247C761
| ML20247C761 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 05/18/1989 |
| From: | Kane W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Creel G BALTIMORE GAS & ELECTRIC CO. |
| Shared Package | |
| ML20247C765 | List: |
| References | |
| EA-89-107, NUDOCS 8905250041 | |
| Download: ML20247C761 (3) | |
See also: IR 05000317/1989011
Text
.
-
-
.
_ _ _ - -
-
-
,
,
+
x
j
,
1..
1..
q
nE
MAY 181989
Docket / License Nos.:
50-317/DPR-53
I
l
50-318/DPR-69
EA No.:
EA 89-107
!
Baltimore Gas and Electric Company
i
ATTN: Mr. George C. Creel
i
Vice President, Nuclear Energy
!
Calvert Cliffs Nuclear Power Plant
.I
MD. Routes 2 & 4
!
Post Office Box 1535
i
'Lusby, Maryland 20657
Gentlemen:
,
. Subject:
NRC Region I Combined Special Inspection Report Nos. 50-31'7/89-11
'
and 50-318/89-11
!
The enclosed report transmits the findings of the April 17-27, 1989, . special
inspection' concerning two ' operational events and the installation of an unre-
viewed temporary modification at the. Calvert Cliffs facility.
These findings
<
were discussed with Mr. L. Russell and members of your staff.
On. April 17,.1989, core alterations were performed for approximately 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and
I
35. minutes without the appropriate level of containment integrity being - estab-
~11shed. Again on April 19, 1989, core alterations were performed for approxi-
mately 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> while the containment bounda y was breached. Technical Specifi-
cations (TS) impose special containment integrity requirements during core
alterations.
These . two operational events therefore represent an apparent
j
violation.-
'
On April 22, 1988, a temporary modification was installed on_the Unit 1 Refuel-
ing Machine which your staff subsequently, on April 20, 1989 determined consti-
l
tuted.an unreviewed safety question. This temporary modification was installed
l
without the TS required Plant Onsite Safety Committee review or an evaluation
!
performed as required by 10 CFR 50.59.
This constitutes two apparent
violations.
Of more significant concern to us are the broader implications of these
-events.
The NRC is concerned that a lack of control of operations and main-
. ,
tenance activities at Calvert Cliffs allowed these events to occur.
'g.
Accordingly, we have scheduled an Enforcement Conference on May 30,1989, to
!
discuss these events.with you in the NRC Region I Office in King of Prussia,
!
We will forward an appropriate notification of enforcement
i
action after the Enforcement Conference.
!
!
0[f
0FFICIAL RECORD COPY
IR CC 89-11 - 0001.0.0
(
05/18/89
8905250041 890518
ADOCK 05000317
7,
C
<
I l
o
I
1
,
_
._
___ __ _ _-__________
.-
..
MAY 181989
<
-
Balt'imore Gas and Electric Company
2
During the Enforcement Conference, please be prepared to address the following:
--
Safety significance of these events;
l
Root cause evaluations;
--
Factors that worsened or mitigated these events;
--
Broader implications of these events; and,
--
--
Actions to prevent recurrence.
Your cooperation with us is appreciated.
Sincerely,
,
Original Sbned By
,
William F. Kane, Director
Division of Reactor Projects
,
Enclosure:
NRC Region I Combined Special Inspection Report Nos. 50-317/89-11 and
50-318/89-11
cc w/ encl:
J. Lippold, General Supervisor, Technical Services Engineering
T. Magette, Administrator, Nuclear Evaluations
Public Document Room (LPDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Maryland (2)
0FFICIAL RECORD COPY
IR CC 89-11 - 0002.0.0
05/18/89
_ _ ____ _ _ __ ____
__ -
-
. _ , _
_ _ _ _ _ _ _ _ _ _ _ _ -
'
,-
.
.
' Bali.imore Gas and Electric Company
3
MAY 181989
bec w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
W. Russell, RA
J. Allan, DRA
D. Holody, E0
.
W. Kane, DRP
S. Collins, DRP
J. Wiggins, DRP
L. Tripp, DRP
D. Limroth, DRP
P. Wilson, DRP
R. Bores, DRSS
L. Chandler, OGC
J. Lieberman, OE
M. Callahan, OCA
J. Partlow, NRR
B. Capra, NRR
l
S. McNeil, NRR
'
R
P
R
P
RI:DRP
RC
7
on/mjd
p
Wiggins
W
'
e
e
SI[h/89
5//h/89
5/ /89
5/13/89
0FFICIAL RECORD COPY
IR CC 89-11 - 0005.0.0
05/18/89
f