._.

E ..

Oi y ,

c ,; '

+, . MAR 171989 Docket Nos. 50-317/318 Baltimore Gas?and Electric Company ATTN; 'Mr. George C. Creel' t '

7 Vice President-Nuclear Energy Calvert. Cliffs Nuclear Power Plant MD~Rts 2 and'4', P.O. Box 1535 Lusby, Maryland 20657 Gentlemen:

SUBJECT:

SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS In ca' telephone conversation between Mr. K. Nietmann, and Mr. B. Norris, Examiner, arrangements were - made for the administration of licensing examinations at the Calvert' Cliffs Nuclear Power Plant.

.The written , examinations is scheduled for . June 12, 1989. The operating-

. examinations are scheduled-for: June 13, 1989.

.To meet the above: schedule,. it: will be . necessary for you to furnish the reference material listed in Enclosure 1, " Reference Material Requirements for Reactor / Senior Reactor. Operator Licensing Examinations," by May.1, .1989. Any delay in . receiving approved, properly bound and indexed reference material, or the submittal of inadequate or incomplete reference material may result in the examination'being rescheduled. Mr. Nietmann has been advised of our reference material: requirements, and the address where each set is to be mailed.

You .are- responsible for providing adequate space and accommodations for administration of the written examinations. Enclosure 2, " Requirements for Administration of Written Examination," describes our requirements for conducting these examinations.

Enclosure 3 contains the Rules and Guidelines that will be in effect during the administration of the written examination. The facility management is

. responsible for ensuring that all applicants are aware of these rules.

The facility staff review of the written examination will be conducted in accordance with requirements specified in Enclosure 4, " Requirements for Facility Review of Written Examinations."

To better document simulator examinations, the Chief Examiner will have the simulator operator record predetermined plant conditions (i.e., , plant pressure, temperature, pressurizer level, etc.), for each simulator scenario.

The applicants will be responsible for providing this information, with any appeal of a simulator operating examination. Therefore, your training staff should retain the original simulator examination scenario information until all applicants who took examinations have either passed the operating examination, accepted the denial"of their license, or filed an appeal.

OFFICIAL RECORD COPY CC 90 DAY LETTER - 0001.0.0 i 03/16/89 k

8903300145 890317 9 (DR ADocg 0500033y g PNV y .)

All completed reactor operator and senior reactor operator license applications should be submitted at least 30 days before the first examination dates so that we will be able to review the training and experience of the candidates, process thc medical certifications, and prepare final examiner assignments after applicant eligibility has been determined. If the applications are not received at least 30 days before the examination dates, it is likely that a postponement will be necessary.

Mr. Nietmann has been informed of the above requirements.

This request is covered by Office of Management and Budget Clearance Number 3150-0101 which expires May 31, 1989. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, xeroxing and mailing the required material. Comments on the accuracy of this estimate and suggestions to reduce the burden may be dir:cted to the Office Of Management and Budget, Paperwork Reduction oject 3100-0101), Rooin 3208, New Executive Office Building, Washington L 1. 20503, and the U.S. Nuclear Regulatory Commission, Records and Reports Manas ament Branch, Office of Information Resources Management, Washington, D.C. 20555.

Thank you for your consideration in this matter. If you have any questions regarding the examination procedures and requirements, please contact me at (215) 337-5211.

Sincerely,

--j -

Peter W. Eselgroth, Chief Pressurized Water Reactor Section Operations Dranch, DRS

Enclosures:

1. Reference Material Requirements for Reactor / Senior Reactor Operator Licensing Examinations
2. Requirements for Administration of Written Examinations
3. NRC Rules and Guidelines for W",tten Examinations
4. Requirements for Facility Review of Written Examinations cc w/ enclosures:

J. Hill, Supervisor, Operations Training K. Nietmann, General Supervisor-Nuclear Taining W. J. Lippold, General Supervisor, Technical Services Engineering T. Magette, Administrator, Nuclear Evaluations Public Document Room (PDR) local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of Maryland (2)

bec w/ enclosures:

Region'I Docket Room (with concurrences)

Managcment AssisteoL, DRna (w/v c o w l -)

J. Wiggins, DRP L. Tripp, DRP D. Limroth, DRP P. Wilson, DRP R. Bores, DRSS S. McNeil, NRR f%0-(14) SALP Repu,La %

OL Facility Fi.le Project Manager, NRR I:DRS ley RI:DRS.7[

Norris RI:DRSff[

Eselgroth 1 3 /89 3//b/89 3//b/89 j I

, r (4 .

T

' ENCLOSURE 1

~

REFERENCE MATERIAL REQUIREMENTSLFOR REACTOR / SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS i

, 1. Ex1 sting learning objectives, Job Performance' Measures and : lesson plans L (including training manuals, plant' orientation manual, system . descrip '

tions, reactor theory, thermodynamics, etc.).

l A. copy of the' facility Job and Task Analysis (JTA), . specifying the knowledges and abilities required of an operator at - the facility. Each particular knowledge and/or ability will include an importance: rating correlating it to ensuring.the health and the safety of the. public. If.a JTA is not furnished, the Knowledges and Abilities Catalog for Nuclear Power Plant Operators, NUREG 1122 (1123) will- be used to establish content validity for the examination.

All: Job Performance Measures (JPMs) used to acertain the competence of

. the. operators in performing tasks within the control' room complex and, as identified in the facility JTAs, outside of the control room, i.e., local operations.

Training materials shall include all substantive -- written material used l for preparing- applicants for initial R0 and SRO. licensing. The written

! . material; shall include learning objectives and the details presented l

during ilectures, rather than outlines. Training materials shall be identified by ' plant - and unit, bound, tabbed, and indexed. FAILURE TO PROVIDE COMPLETE, PROPERLY BOUND AND INDEXED PLANT REFERENCE MATERIAL MAY

. RESULT IN THE RETURN OF THE MATERIAL TO THE PERSON WHO IS THE HIGHEST LEVEL OF. CORPORATE MANAGEMENT WHO IS RESPONSIBLE FOR PLANT OPERATIONS

-(E.G., VICE PRESIDENT OF NUCLEAR.0PERATIONS). ACCOMPANYING THE MATERIAL WILL ' BE A COVER LETTER EXPLAINING THE DEFICIENCIES IN THE REFERENCE MATERIAL AND THE FACT THAT THIS WAS THE- REASON THE EXAMINATIONS WERE CANCELLED OR POSTPONED. Training materials which include. the following -

shall be provided:

I i.

System descriptions including descriptions of all operationally L relevant flow paths, components, controls and instrumentation.

L' System training material should draw parallels to the actual procedures used for operating the applicable system.

Complete and operationally useful descriptions of all safety-system interactions and, where available, BOP system interactions under emergency and abnormal conditions, including consequences of anti-cipated operator error, maintenance error, and equipment failure.

Training material used to clarify and strengthen understanding of emergency operating procedures.

l

'h .

A -

Comprehensive theory material that includes- fundamentals in the area

.of7 theory. of; reactor. operation, thermodynamics, heat ' transfer and

' fluid - flow, as well as specific - application -to = actual in plant.

components. For example, mechanical theory material on pumps shall

~ include pump theory as well as .descr.iptions of how these principles actually apply'to-major plant pumps and the systems in which.they are-

!.. installed (i.e., Reactor Coolant' Pumps, all ECCS pumps, Recirculation pumps, Feedwater pumps and Emergency Feedwater. " pumps) . Reactor Theory material shall include descriptions that draw explicit ties between the fundamentals and the actual operating 1imits followed in the plant (i.e., reactor theory material ~ should contain explanations.

how principles relate to the actual curves used by operators 'to s verify shutdown margin or calculate an ECP).

2. , Complete Procedure.Index (including surveillance p'rocedures, etc.)
3. All- Administrative Procedures (as applicable to reactor operation . or safety)
4. All integrated plant procedures (normal or general operating procedures) i .5. :All emergency procedures . (emergency- instructions, abnormal or. 'special procedures)
6. Standing orders (important orders that- are safety related and may super-

.sede the regular procedures)

7. Surveillance . procedures - (procedures that are run frequently, i.e. weekly or that can be run on the simulator)

- 8. Fuel-handling and- core-loading procedures, (initial core-loading procedure,- when. appropriate) l

9. All annunciator / alarm procedures
10. Radiation protection manual (radiation control manual or procedures)
11. Emergency plan implementing procedures
12. Technical Specifications (and interpretations, if available) for all units for which licenses are sougnt.
13. System Operating Procedures l
14. Piping and Instrumentation diagrams, electrical single-line diagrams, or flow diagrams
15. . Technical Data Book, and/or Plant curve information as used by operators l and facility precautions, limitations, and set points (PLS) for the facility c.

. U L*

L I'

-16. Questions and answers. specific to the facility training program which may be used' in the written or. operating examinations (voluntary by ' facility licensee)

17. . The'following on the plant reference simulation facility
_ .a. List of all preprogrammed initial conditions
b. List of all preset malfunctions with a clear identification number.

l The' list shall include cause and effect information. Specifically, for each malfunction a concise description of the expected. result, or-range. of results, that will occur upon implementation shall be

~

provided. Additionally, ~ an indication of which annunciators are to be initially' expected should be given.

c. A description of simulator failure capabilities for valves, breakers, indicators and alarms.
d. Where~ the capability exists, an explanation of the ability to vary the severity of .a particular malfunction shall be provided, i.e.,

ability to vary the size of a given LOCA or_ steam leak, or the abil-ity to .cause a slow failure 'of a component such as a feed pump, tur-bine generator or major . valve. ( e . g .' , drifting shut of a main feedwater control valve)

e. An identification of modeling conditions / problems that may impact the examination.
f. Identification of any known performance test discrepancies not yet corrected,
g. Identification of differences between the simulator and the reference plant's control room
h. Copies of facility generated scenarios that expose the applicants to situations of degraded pressure control (PWR), degraded heat removal capability (PWR and BWR) and containment challenges (PWR and BWR) may be provided (voluntary by licensee)
1. Simulator instructors manual (voluntary by licensee).
j. Description of the scenarios used for the training class (voluntary by licensee).
18. Additional material required by the examiners to develop examinations that meet the requirements of these standards and the regulations.

The above reference material shall be approved, final issues and shall be so marked. If a plant has not finalized some of the material, the Chief Examiner shall verify with the facility that the most complete, up-to-date material is

. available and that agreement has been reached with the licensee for limiting changes before the administration of the examination. All procedures and reference material shall be bound with appropriate indices or tables of contents' so that they can be used efficiently. Failure to provide complete, properly bound and indexed plant reference material could result in cancellation or rescheduling of the examinations.

1 I

ENCLOSURE 2 REQUIREMENTS FOR ADMINISTRATION OF WRITTEN EXAMINATIONS l

1. A single room shall be provided for administration of the written examination. The location of this room and supporting restroom facilities shall be such as to prevent contact with all other facility and/or contractor personnel during the written examination. If necessary, the facility -should make arrangements for the use of a suitable room at a local school, motel, or other building. Obtaining this room is the responsibility of the licensee.
2. Minimum spacing is required to ensure examination integrity as determined by the Chief Examiner. Minimum spacing should be one applicant per table, with a three foot space between tables.
3. Suitable arrangements shall be made by the facility if the applicants are to have lunch, coffee, or other refreshments. These arrangements shall comply with Item 1 above and shall be reviewed by the examiner and/or proctor.
4. The facility licensee shall provide pads of 8-1/2 by 11 inch lined paper in unopened packages for each applicant's use in completing .the examination. The examiner shall distribute these pads to the applicants.
5. Applicants may bring pens, pencils, calculators or slide rules into the examination room. Only black ink or dark pencils should be used for writing answers to questions.
6. The licensee shall provide one set of steam tables for each applicant.

The examiner shall distribute the steam tables to the applicants. No wall charts, model3, and/or other training materials shall be present in the examination raom. No other equipment or reference material shall be allowed unless provided by the examiner.

I I

, ENCLOSURE 3 PROCEDURES FOR THE ADhlNISTRATION OF WRITTEN EXAMINATIONS l

1. Check identification badges.
2. Pass' out examinations and all handouts. Remind applicants not to. review examination until instructed to do so.

READ THE FOLLOWING INSTRUCTIONS VERBATIM:

During the administration'of this examination the following rules apply:

1. Cheating on the examination means an automatic denial of your application and could result in more severe penalties.
2. After the examination has been completed, you must sign the statement on the cover sheet indicating that the work is your own and you have not received or given assistance in completing the examination. This must be done after you complete the examination.

Pf50 THE FOLLOWING INSTRUCTIONS

1. Restroom trips are to be limited and only one applicant at a time may leave. You must avoid all contacts with anyone outside the examination room to avoid even the appearance or possibility of cheating.
2. Use black ink or dark pencil only to facilitate legible reproductions.
3. Print your name in the blank provided in the upper right-hand corner of the examination cover sheet.
4. Fill in the date on the cover sheet of the examination (if necessary).
5. You may write your answers on the examination question page or on a separate sheet of paper. USE ONLY THE PAPER PROVIDED AND DO NOT WRITE ON THE BACK SIDE OF THE PAGE.
6. If you write your answers on the examination question page and you need more space to answer a specific question, use a separate sheet of the paper provided and insert it directly after the specific question. DO NOT WRITE ON THE BACK SIDE OF THE EXAMINATION QUESTION PAGE.
7. Print your name in the upper right hand corner of the first page of each section of your answer sheets whether you use the examination question pages or separate sheets of paper. Initial each page.
8. Before you turn in your examination, consecutively number each answer sheet, including any additional pages inserted when writing your answers on the examination question page.
9. If you are using separate sheets, number each answer as-- to category and '

1.04, 6.10) and skip at least 3.. lines between answers to -

- humber (i .e.

~

allow space.for grading.

10. : Write "End of Category " at the end of your- answers to a category.
31. Start each category on a new page.
12. Write "Last Page" on the last answer sheet.
13. Use abbreviations only if they are commonly .used in facility literature.

Avoid using. symbols such as < or > ' signs to avoid a simple transposition error resulting in an incorrect answer. Write it out'.

14. The point value for each question is indicated in parentheses after the question. .The amount of blank space on an examination question page is NOT an indication of the depth of answer required.
15. Show all calculations, methods, or assumptions used to obtain an answer.

.16 . Partial credit may be given. Therefore, ANSWER ALL PARTS OF THE QUESTION:

AND DO NOT LEAVE ANY ANSWER BLANK.

17. Proportional grading will be applied. Any additional wrong information that is provided may count against you. For example, if a question is worth one. point and asks for four responses, each of which is worth 0.25 points, and you give five responses, each of your responses will be worth O'.20 points. If one of your five responses is incorrect, 0.20 will be

-deducted and your total credit for that question will- be 0.80 instead of 1.00 even though.you got the four correct answers.

18. If the intent of a question is unclear, ask questions of the examiner only.

l

19. When ' turning in your examination, assemble the completed examination with examination questions, examination aids and answer sheets. In addition, i turn in all scrap paper.
20. To pass the examination, you must achieve an overall grade of 80% or - .

greater and at least 70% in each category.

21. There is a time 11mit of (6) hours for completion of the examination.

(or some other time if less than the full examination is taken.)

22. When you are done and have turned in your examination, leave the examination area (DEFINE THE AREA). If you are found in this area while the examination is still in progress, your license may be denied or revoked.

L___-______-__________-_. ---- -_

l l

l l Enclosure 4 REQUIREMENTS FOR FACILITY REVIEW 0F WRITTEN EXAMINATIONS

1. At the option of the Chief Examiner, the facility may review the written examination up to two weeks prior to its administration. This review may take place at the facility or in the Regional office. The Chief Examiner will coordinate the details of the review with the facility. An NRC examiner will always be present during the review.

When this option of examination review is utilized, the facility reviewers will sign the following statement prior to being allowed access to the exami mtion. The examination or written notes will not be retained by tt.' 'acility.

a. Pre-Examination Security Agreement I agree that I will not- knowingly divulge any information concerning the replacement (or initial) examination scheduled for to any unauthorized persons. I understand that I am not to participate in any instruction involving those reactor operator or senior r.eactor operator applicants scheduled to be administered the above replacement (or initial) examination from now until after the examination has been administered. I understand that violation of this security agreement could result in the examination being voided.

Signature /Date In addition, the facility staff reviewers will sign the following statement after the written examination has been administered.

b. Post-Examination Security Agreement I did not, to the best of knowledge, divulge any information concerning the ' written examination administered on to any unauthorized persons. I did not participate in providing any instruction to those reactor operator and senior reactor operator applicants who were administered the examination from the time that I was allowed access to the examination.

Signature /Date

L ._ [ . :-

>a-w I

'2. (Regardless . of whether the above examination review option is exercised, immediately following the administration of the' written _ examination, .the facility staff shall be provided-'a marked up~ ' copy' of - the examination and the answer key. The copy of the written examination shall include pen L

and ink changes made to questions' during the examination administration.

If the facility did not review the' examination ' prior to its administration, they will have five.(5) working days from the day of the written examination to submit formal comments. If the~ facility reviewed the examination prior to its administration, any additional comments must be given to' an: examiner prior to his/her leaving the site at the end of the- week of the written examination administration. 'In either ' case, the-comments will be addressed to the - responsible Regional Office by ' the highest on site level of corporate n anagement for plant operations,' e.g.,

Vice' President for Nuclear Operatic 1s. A copy of the submittal will be-forwarded 'to the Chief Examiner, as appropriate, Comments not submitted within 'the required time frame will be considered for inclusion 'in the

. grading process on a case-by-case tesis by the Regional Office Section Chief. ' Should - the comment submittal. deadline not be met, a long delay in grading the examination may occur.

3. The following format . should be adhered to for submittal of specific -

comments:

a. Listing of.NRC Question, answer and reference
b. Facility comment / recommendation
c. Reference (to support facility comment)

NOTES: 1. No change to the examination will be made without submittai of of a' reference to support the facility comment. Any supporting; documen+atiun that was not previously supplied, should be provided.

2. Comments made without a concise facility recommendation will not be addressed.
4. A two hour post examination review may be held at the discretion of the Chief Examiner. If this review i.s held, the facility staff should be informed that only written comments that are properly supported will be considered in the grading of the examination.

_ _ = _ _ _ _ _ _ _ _ _ _ _ _ - . - 1