L 4 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES OPERATING LIMITING CONDITION FOR OPERATION
- 3. 8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE:
Two physically independent circuits between the offsite transmission a.
network and the onsite Class IE distribution system, and b.
Two separate and independent Emergency Diesel Generators (EDG), each with:
1.
A separate day fuel tank containing a minimum volume of 300 gallons of fuel, 2.
A separate fuel storage system containing a minimum volume of 42,500 gallons of fuel, and 3.
A separate fuel transfer pump.
APPLICABILITY: MODES 1, 2, 3 and 4.
ACTION:
With one offsite circuit of 3.8.1.1.a inoperable:
a.
1.
Demonstrate the OPERABILITY of the remaining offsite A.C.
sources by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, and 2,.
If either EDG has not been successfully tested within the past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, demonstrate its OPERABILITY by performing Surveillance Requirement 4.8.1.1.2.a.3 separately for each such EDG within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless the diesel is already operating, and 3.
Restore the offsite circuit to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b.
With one EDG of 3.8.1.1.b inoperable:
1.
Demonstrate the OPERABILITY of the A.C. offsite sources by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, and 2.
If the EDG became inoperable due to any cause other than preplanned preventive maintenance or testing, demonstrate the OPERABILITY of the remaining EDG by performing Surveillance Requirements 4.8.1.1.2.a.3 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> *, and
- This test is required to be completed regardless of when the inoperable EDG is restored to OPERABILITY.
SUMMER - UNIT 1 3/4 8-1 AMENDMENT NO. 77 090722029s 890712
~