ML20246Q016
| ML20246Q016 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 05/09/1989 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20246Q022 | List: |
| References | |
| NUDOCS 8905220334 | |
| Download: ML20246Q016 (3) | |
See also: IR 05000498/1989008
Text
__
_
.__ -_ - . _ - _ _ _ _ _
_ _ _ _ _ _ _ _ _
___ _ _ _ _ _ _ _ _
__
_-_
__-_
___ ___
_
_- _
'
9"
- , . #g
'
t*
,
<;
. w
-
,
,
'
'
S 31, J:
.6
<
-
,:
1
-
t
< %.
4
,
.
,
MAY
9 999
'
,
'In' Reply _Rbfer-To:.
1
JDockets:50-498/89-08
- 50-499/89-08,
,
,.
,
'
-Houston Lighting-& Power Company.
'
-
ATTN:
J. H.DGoldberg,: Group Vice
,<
President,. Nuclear
. .
'1
.P.l0.' Box 1700
./
Houston, Texas 77001
,
' Gentlemen:
,
,
.This refers to the inspection conducted by Messrs
J. E. Bess, J.'I. Tapia,.
y R. !J. Evans,; D. L. Garrison, .and other merbers of this office during the. period
,
1 March 1-31,1989, of activities ' authorized oy.NRC Operating Licenses NPF-76 and{
. a j'
NPF-80, for the' South. Texas Project,. Units 1 and 2, and to the discussion of.our..
[',
findings with Mr.
W.' H. Kinsey' and other members of your staff at the conclusion - ~
j of the inspection!
~
>
Areas examined during the. inspection included plant status, engineered safety
feature-system walkdown,; operational. safety verification, monthly maintenance
observations, monthly surveillance observations,-startup testing, and approach
'
g~
_-to criticality. .Within these areas, the. inspection consisted of selective;
'
' examination of procedures and representative records, interviews with personnel,
~
..and observations by the NRC inspectors.
The inspection findings are documented
in the' enclosed inspection report.
During this inspection,'it was found that certain 'f your activities-were in
o
,
violation of.NRC requirements.
Conseq'uently, you.are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201<
of the NRC's " Rules of Practice," Part 2; Title 10' Code of Federal Regulations.
,
'Your. response should be based on the specifics contained in the Notice of
,
Violation enclosed with this letter. ~ Also during this inspection, a noncited
violation was identified.
Corrective actions.were, initiated prior to the
, completion of this inspection which satisfied the criter.ia specified in
iSection V.A. of the General-Statement of Policy and Procedure for NRC
Enforcement Actions.
Therefore,J rio written response to this~ violation will be
~
required.
We have.also examined actionEyou have taken with regard to"previously
J
identified inspection findings.' The status of these items'is identified in.
paragraph 3 of the enclosed, report.
<
The response requested by this letter and the accompanying Notice is not subject
to'the clearance procedures of the Office of Management and Budget as required
Lby the Paperwork Reduction Act.of.1980, PL 96-511.
, -
' ,7
..
,
RIV:SRIh
1RI
' DRP/D/d
C:DRP/D
D:
'
"
RI
RJEvkns DLGa rison
DMHunhitfutt
EJHoller
L allan
'
JEBess/1r)
JITap"a
- S ly /89
J'/t//89
3 / 9 189
5/Y /89
3 /9 /89
(/ /89
/f /89
&
/h
'
8905220334 890509
ADOCK 05000498
') L \\
{
O
l
-
.
,
r
,.
-
l
!'
Houston Lighting & Power Company
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
b (i
Onginal Signed By:
"
b
{
L J. CALLAN
'
a
L. J. Callan, Director
j
, . -
Division of Reactor Projects
,
s
4
,
,
"zEnclosures:
- o
,
c
1. . Appendix A - Notice of Violation
."
,<?
.'2.
Appendix B
.NRC Inspection Report
.
l i/
'
50-498/89-08
'
' 50-499/89-08
.*
.
- i
.
.
.
~
cc w/ enclosures:
.
,
7
Houston Lighting & Power Company
Central Power & Light Company J
ATTN:
M.
A'. McBurnett, Manager
.
ATTN:
R. L. Range /R. P. Verret
Operations Support Licensing
P.O. Box 2121
-
i
.
,
' ,P.O. Box 289
Corpus Christi, Texas. 78403-
'
Wadsworth, Texas 77483
[HoustonLighting&PowerCompany
City of Austin Electric. Utility
. ATTN:
Gerald E. Vaughn, Vice President
ATTN:
R. J. Miner, Chief.0perating
Nuclear Operations
Officer
-
P.O. Box 1700
.
721 Barton Springs Road
Houston, Texas 77001
Houston Lighting & Power Company
Newman & Holtzinger, P.C.
ATTN:
J. T. Westermeier, General Manager
ATTN:
J. R. Newman, Esquire
South Texas Project
1615 L Street, N.W.
P.O. Box 289
Washington, DC 20036
-Wadsworth, Texas 77483
Houston Lighting & Power Company
City Public Service Board
' ATTN:
S. L. Rosen, General Manager
ATTN:
R. J. Costello/M. T. Hardt
f
Operations Support
P.O. Box 1771
j
P.O.' Box 289
San Antonio, Texas .78296
!
Wadsworth, Texas 77483
'
Houston Lighting & Power Company
Licensing Representative
-
ATTN:
R. W. Chewning, Chairman
Houston Lighting & Power Company
}
Nuclear Safety Review Board
Suite 610
J
P.O. Box.289
Three Metro Center
Wadsworth, Texas 77483
Bethesda, Maryland 20814
l
l
Texas Radiation Control Program Director
{
bec:
(see next page)
l
_ _ ___ - - - _ _ _ - _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ - _
__- _ _ -_____-__ _
_
i
'
,p4
%
'
c
.
,
.
.
.
.
,
Houston Lighting & Power Company
-3-
bec to DMB (IE01)
bec.distrib. by RIV:
- DRP
- RRI-
- Section~ Chief (DRP/D)
- DRS
- MIS System
- RPB-DRSS
Lisf. Shea, RM/ALF
- RIV File
R. Bachmann, OGC
- RSTS Operator
- R. D.. Martin'
G. F. Sanborn, E0
- G. Dick, NRR Project Manager (MS:
13-0-18)
- w/766
i
M
'
r
4
9
A
't
9
+*
l
l
.
._
u.m
_____.-___mm___..-_u._
- - ___ _ _ _ .