Forwards Insp Repts 50-321/89-06 & 50-366/89-06 on 890321-0421 & Notice of Violation.Violation 366/89-06-05 Re Pertinent Requirements & Elements to Be Included in Response
ML20246N863
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 05/08/1989
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20246N865 List:
References
NUDOCS 8905220019
Download: ML20246N863 (2)


See also: IR 05000321/1989006

Text

- _ -

/'

'

'

b'. l

' o

_

'

.

o

]

MAY 0 81993

Docket Nos. 50-321 and 50-366

License Nos. DPR-57 and NPF-5

Georgia Power Company

ATTN: Mr. W. G. Hairston 111

Senior Vice President-

Nuclear Operations

P.O. Box 1295

Birmingham, AL 35201

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT NOS. 50-321/89-06 AND 50-366/89-06)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

Messrs. J. E. Menning and R. A. Musser on March 21 - April 21,1989. The

inspection included a review of activities authorized for your Hatch facility.

At the conclusion of the inspection, the findings were discussed with those

members of your staff identified in the enclosed Inspection Report.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

The inspection findings indicate that certain activities appeared to violate

NRC requirements.

Violation 366/89-06-05, references to pertinent

requirements, and elements to be included in your response are presented in the

<

enclosed Notice of Violation.

Although this violation was identified by the

licensee, it is being cited because it could have been prevented by corrective

action for a previous violation.

The deficient procedure that caused the

violation had been upgraded as part of your Procedure Upgrade Program, and this

program was identified as a long-term corrective action for a previous

violation.

Additionally, because all of the criteria for categorization of

licensee-identified violations were met with regard to items 321/89-06-01,

321/89-06-02, 366/89-06-03, and 366/89-06-04, four other violations are not

being cited.

Therefore, no response to these four items is required.

The

details pertaining to these licensee-identified violations are described in the

enclosed Inspection Report.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosures

will be placed in the NRC Public Document Room.

The responses directed by this letter and its enclosures are not subject to the

clearance procedures of the Office of Mat.agement and Budget as required by the

Paperwork Reduction Act of 1980, Pub. L. No.96-511,

8905220019 890508

}

PDR

ADOCK 05000321

Q

PDC

l

(

IEof

-_

________________a

_ _ _

-

_ _ _

_ _ _ _ _ _ _

. _ _ _ _ _ _ _ _ _ _ - _ - _

'

.,

.

,,

.

Georgia Power Company

2

MAY 0 8 1989

l

l

Should you have any questions concerning this letter, please contact us.

L

'

Sincerely,

PI

Alan R. Herdt, Chief

Reactor Projects Branch 3

Division of Reactor Projects

Enclosures:

1.

Notice of Violation .

2.

.NRC Inspection Report

cc w/encls:

R. P. Mcdonald, Executive Vice President,

Nuclear Operations

J. T. Beckham, Vice President, Plant Hatch

H. C. Nix,' General Manager - Nuclear Plant

0. M. Fraser, Site Quality Assurance

Manager

1.. T. Gucwa, Manager, Nuclear Safety

and Licensing

S. B. Tipps, Manager of Nuclear

Safety and Compliance

State of Georgia

bcc w/encis:

E. Reis, 0GC

J. Hopkins, NRR

M. Sinkule, RII

NRC Resident Inspector

Document Control Desk