Forwards Notice of Application for & NRC Consideration of Issuance of Export License to GE
ML20246J853
Person / Time
Site: 05000563
Issue date: 05/11/1976
From: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
To:
NATIONAL ARCHIVES & RECORDS ADMINISTRATION
Shared Package
ML20246J751 List:
References
FOIA-89-330 NUDOCS 8909050281
Download: ML20246J853 (1)


Text

~ - - -

y

'7C* '

  • UNITED STATES kk.-1J ~

^

.. NUCLEAR REGULATORY COMMIS$10N

  • 5 '

WASHINGTON. D. c. 396SS Hay 11, 1976 i

CPrice OF THE SECRETARY ]

Director ,

office of the Federal Register .. 1 National Archives and Records Service Washington, D. C.. 20408 s

Dear Sir:

Enclosed for publication in the Federal Register are an original and two certified copies of a document entitled:

GENERAL ELECTRIC COMPANY AND GENERAL ELECTRIC TECHNICAL SERVICES.0PERATION, INC.

Docket No. 50-563 Notice of Application for and Noelear Regulatory Consnission Consideration of Issuance of Facility Export License Publication of the above document at the earliest possible date would be appreciated.

Sincerely, Samuel J. Chilk Secretary of the Commission

Enclosures:

Original and 2 certified ,

copies ]

- i

, bec:[ Central F41ee ,

. Information Services .

Legal Director ~'

j Office of Congressional Affairs OGC

% SECY Piles _

8909050281 890831 PDR FOIA l ig,p MOKDENA89-330 PDR

_m _ _ . _ ..

. g -.. .

  • W- . .

UNITED STATES FJCLEAR REGULATORY COMMISSION GENERAL' ELECTRIC COMPANY AND GENERAL ELECTRIC TECHNICAL SERVICES OPERATION, INC., (CETSCO)

DOCKET NO. 50-563 NOTICE OF APPLICATION FOR AND NUCLEAR REGULATORY FOMMISSION CONSIDER /sTION OF ISSUANCE OF FACILITY EXPORT LICENSE Pienea take notice that Jeneral Electric Company and GETSCO, Inc.

submitted to the Nuclear Regulatory Commission an application for a license to authorize the export of two boiling water reactors each with a power level 965.8 megawatts electrical to the Republic of South Africa and that the issuance of such license is under consideration by the Nuclear Regulatory Commission.

No license authorizing the proposed reactors' export will be issued until the Nuclear Regulatory Commission determines that such export is within the scope of and consistent with the terms of an applicable agreement for cooperation arranged pursuant to Section 123 of the Atomic Energy Act of 1954, as amended (Act), nor until the Nuclear Regulatory Commission has found that:

(a) The application complies with the requirements of the Act, and the Cocrnission's regulations set forth in 10 CFR, Chapter 1 l and (b) The reactors proposed to be exported are utilization facilities as defined in said Act and regulations.

)

s~ . ~. r

. . . . .m . - y. , w - - .. 7,,., _.,...,,_.,, . , , ,

I .

, 1' In its review of applications solely to authorize the export of l l production or utilization facilities, the Nuclear Regulatory Commission  !

i does not evaluate the health and safety characteristics of the facility to be exported. Consequently, there are no safety analysis report or ,

i Advisory Committee on Reactor Safeguards report.

l Unless within 15 days after the publication of this notice in the FEDERAL REGISTER, a request for a hearing is filed with the Nuclear Regulatory Commission by the applicant, or a petition for leave to intervene is filed by any person whose interest may be affected by the proceeding, the Director of the Office of Nuclear Material Safety and Safeguards may, upon the determinations pad findings noted above, cause i

to be issued to General Electric Company and GETSCO, Inc. a facility export license and may cause to be published in the FEDERAL REG 1 STER a notice of issuance of the license. If a request for a hearing or a l petition for leave to intervene is filed within the time prescribed in  ;

the notice, the Nuclear Regulatory Commission will issue a notice of .

hearing or an appropriate orde.r.

A copy of the application is on file in the Nuclear Regulatory Cocnnission's Public Document Room located at 1717 H Street, N.W.,

Washington, D.C.

FOR THE NUCLEAR REGULATORY COMMISSION b Af G. Way e Kerr Division of Fuel Cycle and Material Safety Dated at Bethesda, Maryland this // day of h WL _ ,1976 0