ML20246H665

From kanterella
Jump to navigation Jump to search
Advises That SPDS Meets Util Commitments to NUREG-0737, Suppl 1 & Generic Ltr 89-06, Task Action Plan Item I.D.2, SPDS,10CFR50.54(f). Checklist,Supporting Documentation & SPDS Photographs Will Be Mantained at Plant
ML20246H665
Person / Time
Site: Callaway 
Issue date: 07/10/1989
From: Schnell D
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-0737, RTR-NUREG-0830, RTR-NUREG-1342, RTR-NUREG-737, RTR-NUREG-830, TASK-1.D.2, TASK-TM GL-89-06, GL-89-6, ULNRC-2034, NUDOCS 8907170162
Download: ML20246H665 (3)


Text

_- --

COL 1901 Gratiot Street.

y'

,, m.

, Post Othce Box 149

./

' St. Louis, Missouri 63166

[*

314-554-2650-4 ELECTRIC,

DonaldT.SchneII Semot Vwe President

nusea, b

July;10, 1989 m

U.S.. Nuclear Regulatory Commission LAttn:. Document Control Desk Mail Station P1-137 Washington, DC 20555 Gentlemen:

ULNRC-2034 DOCKET NO. 50-483 CALLAWAY PLANT TASK ACTION PLAN ITEM.I.D.2-SAFETY PARAMSTER DISPLAY SYSTEM-10CFR 50.54 (f)

References:

1).NRC Generic Letter No. 89-06, dated April 12, 1989 2)

NRC Inspection Report 50-483/88009, dated July 19, 1988 3)

T. W. Alexion ltr D. F. Schnell, dated August 3, 1987 4)

SLNRC 86-004, dated February 27, 1986 5)

SLNRC 84-0111, dated September 5, 1984 6)

SLNRC 84-003, dated January 13, 1984 7)

NRC Safety Evaluation Report for Callaway (NUREG-0830) and Supplements In response to Reference 1, I certify that the Callaway Plant Safety Parameter Display System (SPDS) meets the Union Electric commitments to NUREG-0737, supplement 1 as documented in References 2 through 7.

Compliance with those commitments was confirmed by completion of the generic letter checklist.

The completed checklist, supporting documentation, and SPDS photographs will be maintained at the plant.

The SPDS photographs are currently being developed and will be available within a few weeks.

If there are any questions concerning this letter, please contact me.

Very truly

ours, Donald F. Schnell WEK/plh doo3 8907170162 890710 g I PDR ADOCK 05000483 P-PDC

)

o STATE OF MISSOURI )

)

SS I

CITY OF ST. LOUIS )

Alan C.

Passwater, of lawful age, being first duly sworn upon oath says that he is Manager, Licensing and Fuels (Nuclear) for Union Electric Company; that he has read the foregoing document and knows the content thereof; that he has executed the same for and on behalf of said company with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.

By M

Alan C.

Passwater Manager, Licensing and Fuels Nuclear SUBSCRIBFr? and sworn to before me this /B @ day of

, 198f' M41.

.PTAY #v BARBARA NOIARY PUBitC. Sl ATE OF M!SSOURI MY COMMISSION EXPIRES APRIL 22, 1993

(

ST. LOUIS COUNTY.

1 4

1 i

J l

i l

l l

l l

1 l

o 64 s.

s cc:

Gerald Charnoff, Esq.

Shaw, Pittman, Potts & Trowbridge 2300 N. Street, N.W.

Washington, D.C.

20037 Dr. J. O. Cermak CFA, Inc.

4 Professional Drive (Suite 110)

Gaithersburg, MD 20879 R. C. Knop Chief, Reactor Project Branch 1 U.S.

Nuclear Regulatory Commission l

Region III L

799 Roosevelt Road l

Glen Ellyn, Illinois 60137 Bruce Little Callaway Resident Office i

l U.S. Nuclear Regulatory Commission l

RR#1 l

Steedman, Missouri 65077 l-Tom Alexion (2)

Office of Nuclear Reactor Regulation U.S.

Nuclear Regulatory Commission

)

1 White Flint, North, Mail Stop 13E21 l

11555 Rockville Pike l

Rockville, MD 20852 Manager, Electric Department Missouri Public Service Commission P.O. Box 360 Jefferson City, MO 65102 I

l

\\

- - _ _ _ - __