Forwards Insp Repts 50-445/89-57 & 50-446/89-57 on 890717-28 & Notice of Violation
ML20246H504
Person / Time
Site: Comanche Peak  
Issue date: 08/28/1989
From: Charemagne Grimes
Office of Nuclear Reactor Regulation
To: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20246H509 List:
References
NUDOCS 8909010273
Download: ML20246H504 (4)


See also: IR 05000445/1989057

Text

._.

_ __

--

v.

LN.

1

.

.

i

AUG 2 81989

i

l

F

In Reply Refer To:

Dockets:

50-445/89-57

50-446/89-57

Mr. W. J.

Cahill, Jr.

Executive Vice President

TU Electric

400 North Olive Street, Lock Box 81

Dallas, Texas

75201

Dear Mr. Cahill:

This refers to the team inspection of operations and maintenance

procedures conducted by Messrs. Burris, Bitter, Evans, Nelson, and

Vickrey during the period July 17 through July 28, 1989, of

activities authorized by NRC Construction Permits CPPR-126'and

CPPR 127 for the Comanche Peak Stemn Electric Station, Units 1 and

Unit 2 and to the discussion of our findings with you and other

L

members of your staff at the conclusion of' the inspection.

The inspection report identifies areas examined during the

inspection.

Within these areas, the inspection consisted of

selective examination of procedures and representative records,

interviews with personnel, and observation by the inspectors.

During this inspection, it was found that certain of your

activities were in violation of NRC requirements, as specified in

the enclosed Notice of Violation.

A written response to this

violation is required.

In addition, the inspection found a large number of deficiencies,

errors, and inconsistencies in the procedures that were reviewed

(see Appendix C).

Since the inspection included only a small

sample of procedures, action will be necessary to identify and

correct problems with these and other procedures.

Although your

actions to identify and correct the procedure problems were

described verbally in a meeting between Mr. Kelley and members of

his staff and Mr. Warnick and members of his staff on August 16,

1989, a written response is required.

This response should

describe the actions you are taking to identify and correct

problems with your procedures and should include the scope and

timing of your actions as well as identification of when any

necessary corrective actions are expected to be complete.

The

response is required to be submitted within 30 days of the date of

this letter.

By Telephen<gg

Rf00 Rv G

.

SRI:IP:CPPD:NRR

IP:CPPD:NRR

AD:IP:CPPD:NRR

D:CPPD:NRR

SBurris

JWiebe

RWarnick RFu)

CGrimes

8/19/,89

8/

/89

8/2f/89

8/27/89

SphfGP0

8909010273 890828

72 0

I

PDR

ADOCK 05000445

Q

PDC

f

g

- _

_ .

_

- . - -

--

-_ .

_ _ _ .

- _ .

__

- r. .

%'R

UNITED STATES

"

f

-

I

NUCLEAR REGULATORY COMMISSION

J,

{

WASmNGTON, D. C. 20555 -

/

AE 2 81989

k

.In Reply-Refer'To:

'

Dockets:

50-445/89-57

4

50-446/89-57

1

'Mr. W. J..Cahill,.Jr.:

Executive Vice President

TU Electric-

L

'400 North Olive Street, Lock Box 81

Dallas,.TexasJ

75201

Dear Mr. Cahill:.

This refers to the team inspection of operations and maintenance

procedures conducted by Messrs. Burris, Bitter, Evans, Nelson, and

vickrey during the period' July 17 through July 28,'1989, of--

'

activities authorized by'NRC' Construction Permits CPPR-126 and

CPPR 127 for the Comanche Peak Steam Electric Station, Units 1 and

Unit 2 and to the discussion of our findings with you and other

members.of your staff at'the conclusion of the inspection.

'The inspection report identifies areas examined during the

inspection.

Within these areas, the inspection consisted of

l

selective examination of procedures and representative records,

'

interviews'with personnel, and observation by the inspectors.

!

During this inspection, it was found-that certain of your'

activities were-in violation of NRC requirements, as specified in

i

the enclosed Notice of' Violation.

A written response to this

!

violation is required.

j

In addition, the inspection found a large number of deficiencies,

errors, and-inconsistencies in the' procedures that were reviewed

(see' Appendix C).

Since the inspection included only a small

sample of procedures, action will be necessary to identify and

correct problems with these and other procedures. .Although your

,

actions to identify and correct the procedure problems were

1

described verbally in a meeting between Mr. Kelley and members of

'his staff and Mr. Warnick and members of his staff on August 16,

1989,'a written response is required.

This response should

describe the actions you are taking to identify and correct

problems with your procedures and should include the scope and

i

timing of your actions as well as identification of when any

'

necessary corrective actions are expected to be complete.

The

response is required to be submitted within 30 days of the date of

this' letter.

_ - - __ _- _ _ ___ _ _ -

-

_ _ _ _ . _

..O g.=

..

4._

W. J.

Cahill-

E 2 81989

In accordance with 10 CFR 2.790 of the Commission's regulations, a

copy of this letter, the enclosures, and your responses will be

placed in the NRC Public Document-Room.

The responses directed by this. letter and the accompanying Notice

are not' subject to the clearance procedures of the Office of

Management and Budget as required by the' Paperwork Reduction Act of

1980, PL 96-511.

Should you have any questions concerning this inspection, we will

l

be pleased.to discuss them with you.

Sincerely,

R FLUumkk frr

C.

I. Grimes,. Director

Comanche Peak Project Division

Office of Nuclear Reactor Regulation

Enclosures:

Appendix A - Notice of Violation

Appendix B - Inspection Report 50-445/89-57; 50-446/89-57

Appendix C - Listing'of NRC-Questions

Jcc w/ enclosures:

See next page

1

i

_

_

. . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

a

- .y

,

W. J. Cchill,-Jr.

AUG 2 81989

nec w/ enclosure:

1 Roger'D. Walker

TU Electric

,

Manager,. Nuclear Licensing

c/o Bethesda Licensing

MNJ Electric

3 Metro Center, Suite 610

Skyway Tower

Bethesda, Maryland

20814-

i

400 North Olive Street, L.B.

81

'

Dallas, TX

75201

E. F. Ottney

.

P. O. Box 1777

Juanita'Ellis

Glen Rose, Texas' 76043

President - CASE

1426 South Polk Street

Jack R. Newman

'

Dallas, TX '75224

'Newman & Holtzinger

1615 L Street, NW

LTexas Radiation Control

Suite 1000

' Program. Director

Washington, DC

20036

g'

Texas Department of Health

'

1100 West 49th. Street

George R. Bynog

Austin, Texas

78756'

Program Mgr./ Chief Inspector

Texas Dept. of Labor & Standards

GDS Associates, Inc.

Boiler Division

'1850 Parkway Place, Suite 720

P.O. Box 12157, Capitol Station

Marietta, GA

30067-8237

Austin, Texas

78711

Honorable George Crump-

County Judge

Glen Rose, Texas

76043

Ms. Billie Pirner Garde, Esq.

Garde Law Office

104 East Wisconsin Avenue

-Appleton, WI

54911

Regional Administrator, Region IV

-U.S. Nuclear Regulatory Commission

611 Ryan Plaza Drive, Suite 1000

Arlington, Texas

76011

William A. Burchette, Esq.

Counsel for Tex-La Electric

Cooperative of Texas

Heron, Burchette, Ruckert & Rothwell

1025 Thomas Jefferson St., NW

Washington, DC

20007

_ _ _ _ . - - _ _ _ _ _ _ _ _ . _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _