ML20246H504
| ML20246H504 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 08/28/1989 |
| From: | Charemagne Grimes Office of Nuclear Reactor Regulation |
| To: | William Cahill TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20246H509 | List: |
| References | |
| NUDOCS 8909010273 | |
| Download: ML20246H504 (4) | |
See also: IR 05000445/1989057
Text
._.
_ __
--
v.
LN.
1
.
.
i
AUG 2 81989
i
l
F
In Reply Refer To:
Dockets:
50-445/89-57
50-446/89-57
Mr. W. J.
Cahill, Jr.
Executive Vice President
TU Electric
400 North Olive Street, Lock Box 81
Dallas, Texas
75201
Dear Mr. Cahill:
This refers to the team inspection of operations and maintenance
procedures conducted by Messrs. Burris, Bitter, Evans, Nelson, and
Vickrey during the period July 17 through July 28, 1989, of
activities authorized by NRC Construction Permits CPPR-126'and
CPPR 127 for the Comanche Peak Stemn Electric Station, Units 1 and
Unit 2 and to the discussion of our findings with you and other
L
members of your staff at the conclusion of' the inspection.
The inspection report identifies areas examined during the
inspection.
Within these areas, the inspection consisted of
selective examination of procedures and representative records,
interviews with personnel, and observation by the inspectors.
During this inspection, it was found that certain of your
activities were in violation of NRC requirements, as specified in
the enclosed Notice of Violation.
A written response to this
violation is required.
In addition, the inspection found a large number of deficiencies,
errors, and inconsistencies in the procedures that were reviewed
(see Appendix C).
Since the inspection included only a small
sample of procedures, action will be necessary to identify and
correct problems with these and other procedures.
Although your
actions to identify and correct the procedure problems were
described verbally in a meeting between Mr. Kelley and members of
his staff and Mr. Warnick and members of his staff on August 16,
1989, a written response is required.
This response should
describe the actions you are taking to identify and correct
problems with your procedures and should include the scope and
timing of your actions as well as identification of when any
necessary corrective actions are expected to be complete.
The
response is required to be submitted within 30 days of the date of
this letter.
By Telephen<gg
Rf00 Rv G
.
SRI:IP:CPPD:NRR
IP:CPPD:NRR
AD:IP:CPPD:NRR
D:CPPD:NRR
SBurris
JWiebe
RWarnick RFu)
CGrimes
8/19/,89
8/
/89
8/2f/89
8/27/89
SphfGP0
8909010273 890828
72 0
I
ADOCK 05000445
Q
f
g
- _
_ .
_
- . - -
--
-_ .
_ _ _ .
- _ .
__
- r. .
%'R
UNITED STATES
"
f
-
I
NUCLEAR REGULATORY COMMISSION
J,
- {
WASmNGTON, D. C. 20555 -
/
AE 2 81989
k
.In Reply-Refer'To:
'
Dockets:
50-445/89-57
4
50-446/89-57
1
'Mr. W. J..Cahill,.Jr.:
Executive Vice President
TU Electric-
L
'400 North Olive Street, Lock Box 81
Dallas,.TexasJ
75201
Dear Mr. Cahill:.
This refers to the team inspection of operations and maintenance
procedures conducted by Messrs. Burris, Bitter, Evans, Nelson, and
vickrey during the period' July 17 through July 28,'1989, of--
'
activities authorized by'NRC' Construction Permits CPPR-126 and
CPPR 127 for the Comanche Peak Steam Electric Station, Units 1 and
Unit 2 and to the discussion of our findings with you and other
members.of your staff at'the conclusion of the inspection.
'The inspection report identifies areas examined during the
inspection.
Within these areas, the inspection consisted of
l
selective examination of procedures and representative records,
'
interviews'with personnel, and observation by the inspectors.
!
During this inspection, it was found-that certain of your'
activities were-in violation of NRC requirements, as specified in
i
the enclosed Notice of' Violation.
A written response to this
!
violation is required.
j
In addition, the inspection found a large number of deficiencies,
errors, and-inconsistencies in the' procedures that were reviewed
(see' Appendix C).
Since the inspection included only a small
sample of procedures, action will be necessary to identify and
correct problems with these and other procedures. .Although your
,
actions to identify and correct the procedure problems were
1
described verbally in a meeting between Mr. Kelley and members of
'his staff and Mr. Warnick and members of his staff on August 16,
1989,'a written response is required.
This response should
describe the actions you are taking to identify and correct
problems with your procedures and should include the scope and
i
timing of your actions as well as identification of when any
'
necessary corrective actions are expected to be complete.
The
response is required to be submitted within 30 days of the date of
this' letter.
_ - - __ _- _ _ ___ _ _ -
-
_ _ _ _ . _
..O g.=
..
4._
W. J.
Cahill-
E 2 81989
In accordance with 10 CFR 2.790 of the Commission's regulations, a
copy of this letter, the enclosures, and your responses will be
placed in the NRC Public Document-Room.
The responses directed by this. letter and the accompanying Notice
are not' subject to the clearance procedures of the Office of
Management and Budget as required by the' Paperwork Reduction Act of
1980, PL 96-511.
Should you have any questions concerning this inspection, we will
l
be pleased.to discuss them with you.
Sincerely,
R FLUumkk frr
C.
I. Grimes,. Director
Comanche Peak Project Division
Office of Nuclear Reactor Regulation
Enclosures:
Appendix A - Notice of Violation
Appendix B - Inspection Report 50-445/89-57; 50-446/89-57
Appendix C - Listing'of NRC-Questions
Jcc w/ enclosures:
See next page
1
i
_
_
. . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
a
- .y
,
W. J. Cchill,-Jr.
AUG 2 81989
nec w/ enclosure:
1 Roger'D. Walker
TU Electric
,
Manager,. Nuclear Licensing
c/o Bethesda Licensing
MNJ Electric
3 Metro Center, Suite 610
Skyway Tower
Bethesda, Maryland
20814-
i
400 North Olive Street, L.B.
81
'
Dallas, TX
75201
E. F. Ottney
.
P. O. Box 1777
Juanita'Ellis
Glen Rose, Texas' 76043
President - CASE
1426 South Polk Street
Jack R. Newman
'
Dallas, TX '75224
'Newman & Holtzinger
1615 L Street, NW
LTexas Radiation Control
Suite 1000
' Program. Director
20036
g'
Texas Department of Health
'
1100 West 49th. Street
George R. Bynog
78756'
Program Mgr./ Chief Inspector
Texas Dept. of Labor & Standards
GDS Associates, Inc.
Boiler Division
'1850 Parkway Place, Suite 720
P.O. Box 12157, Capitol Station
Marietta, GA
30067-8237
78711
Honorable George Crump-
County Judge
Glen Rose, Texas
76043
Ms. Billie Pirner Garde, Esq.
Garde Law Office
104 East Wisconsin Avenue
-Appleton, WI
54911
Regional Administrator, Region IV
-U.S. Nuclear Regulatory Commission
611 Ryan Plaza Drive, Suite 1000
Arlington, Texas
76011
William A. Burchette, Esq.
Counsel for Tex-La Electric
Cooperative of Texas
Heron, Burchette, Ruckert & Rothwell
1025 Thomas Jefferson St., NW
20007
_ _ _ _ . - - _ _ _ _ _ _ _ _ . _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _