ML20246H321
ML20246H321 | |
Person / Time | |
---|---|
Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
Issue date: | 05/04/1989 |
From: | Gallo R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
To: | Murphy W VERMONT YANKEE NUCLEAR POWER CORP. |
Shared Package | |
ML20246H326 | List: |
References | |
NUDOCS 8905160069 | |
Download: ML20246H321 (2) | |
Similar Documents at Vermont Yankee | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N3901999-10-25025 October 1999
[Table view]Advises That Info Provided in & Affidavit Re Holtec Position Paper WS-115,rev 1,repts HI-87113, Rev 0,HI-87114,rev 0,HI-87102 Rev 0 & HI-87112,rev 0,marked Proprietary,Will Be Withheld from Public Disclosure ML20217L8591999-10-21021 October 1999 Discusses 990921 Request for Approval to Perform Alternative Testing as Part of Vermont Yankee Nuclear Power Station IST Program.Informs That Submittal Reviewed Against ASME Code Section XI Requirements & Forwards Safety Evaluation ML20217M1181999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20217D9711999-10-13013 October 1999 Responds to Request That Information Titled Addl Info Re Cycle Specific SLMCPR for Vermont Yankee Cycle 21 Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20217F1261999-10-12012 October 1999 Forwards Update to Previously Submitted RELAP5 Analytical Assumptions for App R,Re RAI of 961104 BVY-99-130, Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station1999-10-0808 October 1999 Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station ML20217C1501999-10-0707 October 1999 Forwards Insp Rept 50-271/99-11 on 990809-27.No Violations Noted.Insp Focused on Effectiveness of Engineering Functions in Providing for Safe Operation of Plant BVY-99-128, Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl1999-10-0606 October 1999 Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl ML20212J7891999-10-0404 October 1999 Informs That Licensee 980804,0628,29 & 990921 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Consider Subj GL to Be Closed for Plant ML20212J6501999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of VYNPS on 990913. No New Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues & Insp Plan Through Mar 2000 Encl ML20216J3531999-09-29029 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-271/99-12 on 990628-0811.Corrective Actions:Based on RFO 20 Maint Rule Outage Performance Review,Task Was Generated to Clarify & Enhance SD Monitoring Process BVY-99-122, Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-171999-09-28028 September 1999 Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-17 BVY-99-116, Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested1999-09-21021 September 1999 Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested BVY-99-113, Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing1999-09-21021 September 1999 Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing BVY-99-114, Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 11999-09-21021 September 1999 Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 1 BVY-99-121, Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal1999-09-20020 September 1999 Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal ML20212C1621999-09-17017 September 1999 Forwards Amend 175 to License DPR-28 & Safety Evaluation. Amend Revises TSs to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to Standby Liquid Control System BVY-99-115, Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld1999-09-16016 September 1999 Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld BVY-99-118, Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions1999-09-16016 September 1999 Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20216F3171999-09-13013 September 1999 Forwards Insp Rept 50-271/99-06 on 990621-0801.One Violation Identified & Being Treated as Noncited Violation BVY-99-111, Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution1999-08-31031 August 1999 Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution BVY-99-110, Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp1999-08-31031 August 1999 Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp ML20211G4791999-08-27027 August 1999 Forwards Notice of Withdrawal of 990420 Amend Request Re TS on Reloading & Unloading Sequence of Fuel in Reactor Core When All Fuel Removed from Core BVY-99-107, Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies1999-08-26026 August 1999 Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies ML20211E8841999-08-25025 August 1999 Requests That Licensee Provide bldg-specific Justification for Use of Method A.1 at Locations Where Amplification Significantly Exceeds 1.5 Limit Above 8 Hz ML20211E1371999-08-20020 August 1999 Forwards from J Bean to H Miller & FEMA Final Exercise Rept for 990427-29 Plume Exposure & Ingestion Pathway Exercise for Vermont Yankee Nuclear Power Station.No Deficiencies Noted.Areas Requiring C/A Identified ML20211H0851999-08-19019 August 1999 Forwards Insp Rept 50-271/99-12 on 990628-0711 & Nov. Violation Re Failure to Monitor Unavailability of Specific Sys,Structures & Components During Refueling Outage Did Not Allow Adequate Assessment of Maint Effectiveness BVY-99-108, Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered1999-08-19019 August 1999 Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered BVY-99-103, Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-021999-08-18018 August 1999 Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-02 BVY-99-100, Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings1999-08-0202 August 1999 Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings ML20210M5791999-07-30030 July 1999 Responds to NRC 990726 Telcon Re Status of Resolution for USI A-46 Outliers.Written Summary,By Equipment Category, Listed ML20211E1701999-07-28028 July 1999 Forwards Copy of Final Exercise Rept for 990427-29,full- Participation Plume Exposure & Ingestion Pathway Exercise of Offsite Radiological Emergency Response Plans site-specific to VYNPS ML20210G4271999-07-27027 July 1999 Forwards Testing Data & Associated Results for Fitness for Duty Program at Plant for 990101-0630 ML20210G5041999-07-27027 July 1999 Responds to NRC 990301 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. Licensee Will Submit Info Re Proposed Sys Mod by 990916 ML20210J3031999-07-27027 July 1999 Submits Proposed Changes to Eals.Attachment 1 Provides Listing of Changes to EALs Along with Ref to Bases Documents Supporting Change ML20216D7321999-07-26026 July 1999 Forwards Insp Rept 50-271/99-05 on 990510-0620.Two Viiolations Being Treated as Noncited Violations ML20209J0601999-07-14014 July 1999 Forwards Rev 11 to Vols 1-10 of State of Nh Radiological Emergency Response Plan & Vols 11-50 to Town Radiological Emergency Response Plans,In Support of Vermont Yankee & Seabrook Station.Vols 17-19 of Were Not Included ML20209G2721999-07-14014 July 1999 Discusses Licensee Response to RAI Re GL 92-01,Rev 1,Suppl Suppl 1, Rv Structural Integrity, for Vermont Yankee Nuclear Power Station ML20209G6931999-07-14014 July 1999 Forwards Request for Addl Info Re Spent Fuel Storage Capacity Expansion ML20209G1531999-07-12012 July 1999 Discusses Util Setpoint Control Program Implementation Schedule,As Committed to in Licensee 990514 Response to Notice of Violation,Insp Rept 50-271/97-10 ML20196J2321999-06-30030 June 1999 Submits Input from Util Technical Staff Re Soil Disposal on-site Under 10CFR20.2002 & Expresses Interest in Pursuing Approval to Use Same Methodology (Implemented Through Util ODCM & Reported as Noted) If Possible ML20209B6111999-06-29029 June 1999 Resubmits Summary of Vynp Commitments Page to Replace Original Page Submitted with Responding to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20196J2431999-06-29029 June 1999 Informs That Author Received Call from NRR on Dirt Spreading Ltr & Questions Re Cover Ltr Statement Where Util Asks to Be Allowed to Dispose of Future Soil in Same Manner Provided Same Acceptance Criteria Met ML20196J7421999-06-29029 June 1999 Informs NRC That Vygs Has Implemented Severe Accident Management,As Committed to in Licensee to NRC ML20209B5861999-06-28028 June 1999 Provides Alternative Y2K Readiness Status Described in Supplement 1 to GL 98-01, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure Rept Encl ML20209C3751999-06-28028 June 1999 Forwards non-proprietary Rev 16 to EPIP OP 3524, Emergency Actions to Ensure Initial Accountability & Security Response & Proprietary Rev 12 to EPIP OP 3531, Emergency Call-In Method. Proprietary Encl Withheld ML20196G5241999-06-22022 June 1999 Responds to Re Changes to Vermont Yankee Guard Training & Qualification Plan,Rev 8,Errata A.No NRC Approval Is Required.Encl Will Be Withheld from Public Disclosure Per 10CFR73.21 BVY-99-084, Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.7901999-06-18018 June 1999 Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.790 ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed 1999-09-30 Category:NRC TO UTILITY MONTHYEARML20062F2731990-11-20020 November 1990
[Table view]Forwards Request for Response to Allegation NRR-90-A-0050. Encl Withheld (Ref 10CFR9.17 & 9.21) ML20062G6581990-11-20020 November 1990 Documents 901011 drop-in Meeting Re Refueling Outage Progress,Recent Allegations & NRC Insps ML20062F3681990-11-14014 November 1990 Forwards Safeguards Insp Rept 50-271/90-11 on 900829-31 & Notice of Violation ML20058F2601990-10-31031 October 1990 Forwards Ref Matl Requirements for Reactor Operator Licensing Exams Scheduled for Wk of 910211 ML20058E0791990-10-26026 October 1990 Advises That NRC Will Perform fitness-for-duty Program Insp. Util Written Policies & Procedures Requested ML20058D2651990-10-23023 October 1990 Forwards Insp Rept 50-271/90-80 on 900806-17 & Notice of Violation ML20058B5511990-10-18018 October 1990 Advises That 900922 Response to Generic Ltr 90-03, Relaxation of Staff Position in Generic Ltr 83-08,Item 2.2 Part 2, Vendor Interface for Safety-Related Components, Acceptable ML20062B6981990-10-12012 October 1990 Extends Invitation to Participate in 910220 Symposium & Workshop in King of Prussia,Pa Re Engineering Role in Plant Support ML20059N7121990-10-10010 October 1990 Responds to Util Re Discovery of Flaws in Feedwater Check Valves 27B & 96B.NRC Believes Valve 96B Should Be Reinspected at Next Reload Outage to Verify Util Fracture Mechanics Analyses ML20059N1351990-09-28028 September 1990 Forwards Safety Insp Rept 50-271/90-09 on 900703-0812 & Notice of Violation ML20059H0601990-09-0707 September 1990 Discusses Unescorted Access to Licensee Facilities & fitness-for-duty Program,Per .Nrc Regulations Do Not Prohibit Licensee from Accepting Access Authorization Program of Another Licensee,Contractor or Vendor ML20058M6221990-08-0606 August 1990 Discusses Licensee Engineering Initiatives.Encourages Initiation of Initiative Similar to Region V Licensees Establishment of Engineering Mgrs Forum to Foster Disciplined & Coordinated Approach to Initiatives ML20056A9311990-08-0202 August 1990 Forwards Safety Insp Rept 50-271/90-08 on 900716-20.No Violations Noted ML20056A4021990-07-25025 July 1990 Forwards Radiological Controls Insp Rept 50-271/90-06 on 900618-22 & Notice of Violation ML20055H0011990-07-17017 July 1990 Confirms 900703 Telcon W/J Pelletier & J Durr Announcing SSFI to Be Conducted at Facility During Wks of 900806 & 17. Requests Info Listed in Encl 1 Forwarded No Later than 900720 ML20044B1581990-07-0303 July 1990 Forwards Safety Insp Rept 50-271/90-05 on 900529-0601. Corrective Actions for One Violation & Four Unresolved Items Acceptable ML20044A5471990-06-26026 June 1990 Grants Temporary Waiver of Compliance from Tech Spec Table 3.2.6,Note 1,30-day Limiting Condition for Operation & Extends Out of Svc Time Until Forthcoming Planned Outage of Sept 1990 ML20044A6131990-06-18018 June 1990 Submits Invitation to Attend Power Reactor Operator Licensing Seminar on 900801 in King of Prussia,Pa to Discuss Changes to Format for Both Requalification Exams & Initial Exams.Seminar Agenda Encl ML20059M8731990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20043G7711990-06-13013 June 1990 Forwards Safety Insp Rept 50-271/90-02 on 900313-0507. Violation Noted But Not Cited Re Failure to Submit Exemption Request for Not Recording Data as Required During Containment Integrated Leak Rate Test ML20043G0881990-06-12012 June 1990 Forwards Safeguards Insp Rept 50-271/90-04 on 900521-25.No Violations Noted ML20043F8421990-06-11011 June 1990 Discusses Util 890628 Response to Generic Ltr 89-10, Safety-Related Motor Operated Valve (MOV) Testing & Surveillance. Util Requested to Address Exam of MOV Data on Periodic Basis to Determine Trends ML20043E2961990-06-0707 June 1990 Forwards Request for Addl Info on Use of RELAP5YA Program for Estimating LOCA Analyses,Per & 900507 Telcon. Concerns Re Application of Heat Transfer Correlations in App K Evaluation Model Should Be Addressed within 60 Days ML20043B9891990-05-22022 May 1990 Advises That Assessing Intakes of Radioactive Matl Using Bioassay Data Should Be Based on Best Data Available.Draft Notice Encl ML20055C6071990-05-21021 May 1990 Advises That Util 900427 Response to NRC Bulletin 90-002, Loss of Thermal Margin Caused by Box Bow Confirmed That Util Does Not Presently Use Channel Boxes in-core for Longer than One Bundle Lifetime.Action Complete ML20042G9301990-05-0404 May 1990 Proposes Workshop on 900620-21 in King of Prussia,Pa to Promote Better Understanding of NRC Insp Program.Proposed Agenda,W/Keynote Speakers & Outline for Breakout Sessions Encl ML20043A7361990-05-0202 May 1990 Forwards Agenda for NRC Region I Radiation Protection Managers Conference on 900523-24 in King of Prussia,Pa. Agenda Items Include,Exposure Controls,Radiological Consequences of Unexpected Crud Bursts & Prenatal Exposure ML20034B7631990-04-20020 April 1990 Forwards Resident Safety Insp Rept 50-271/90-01 on 900123-0312.No Violations Noted ML20012F3661990-04-0505 April 1990 Forwards Request for Addl Info Re Use of RELAP5YA.W/o Encl ML20033F8661990-03-21021 March 1990 Advises That Util 891024 Response to Generic Ltr 88-20, Individual Plant Exams, Acceptable ML20012F5981990-03-19019 March 1990 Advises That Radiation Protection Managers Conference Scheduled on 900523-24 in King of Prussia,Pa to Exchange Info on Issues of Mutual Interest Re Power Reactor Radiological Controls Program.Housing Info Encl ML20033F4651990-03-0909 March 1990 Forwards NRC Understanding of Current Status of All Unimplemented USIs for Plant,Based on 891122 Response to Generic Ltr 89-21,review of NRC Records & Discussions Between NRC Project Manager & Util ML20012C8991990-03-0909 March 1990 Requests Addl Info Re Use of FROSSTEY-2 Computer Code for LOCA Analysis,Per Util 871216 & s.Response Requested within 30 Days ML20033F3561990-03-0707 March 1990 Forwards Final SALP Board Rept 50-271/88-99 for Jul 1988 - Sept 1989.Commitments Contained in NRC-approved Physical Security Plan,Describing Protective Measures to Achieve NRC Security Performance Objective,Must Reflect Actual Plan ML20012C5041990-03-0707 March 1990 Forwards Fj Miraglia to BWR Owners Group & SER Denying BWR Owners Group Position on post-accident Neutron Flux Monitoring & Requests That Util Install Neutron Flux Monitoring Instrumentation Conforming to Reg Guide 1.97 ML20012B2351990-03-0505 March 1990 Advises That NRC Plans to Participate in Emergency Preparedness Exercise at Plant During Wk of 900715.Training Session Will Be Held at Region I Ofc 2 Wks Prior to Exercise.Sample Agenda Encl ML20006F8231990-02-21021 February 1990 Informs That NRC Received YAEC-1693,Rev 1 & That Util Should Proceed W/Reissuance of Both Topical Repts Using Ref to YAEC-1693,Rev 1,rather than to YAEC-1693 as Stated in NRC ML20033E3291990-02-21021 February 1990 Informs That Util 900122 Response Fulfills Requirements of Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety- Related Equipment ML20006E8501990-02-15015 February 1990 Forwards Safety Evaluation Inadvertently Omitted from Re Util Response to Generic Ltr 88-01 ML20011E7791990-02-14014 February 1990 Forwards Safety Evaluation Accepting Util 880727 & 890725 Responses to Generic Ltr 88-01 Re IGSCC in BWR Stainless Steel Piping,Except for Position Re Leakage Detection.W/O Encl ML20006E7431990-02-13013 February 1990 Forwards Safety Insp Rept 50-271/89-22 on 891212-900122.Ack Receipt of Util 891228 Response to NRC 891107 Request for Assessment Detailing Util Addl Corrective Actions Re Instances of Degraded High Radiation Area Doors ML19354E8931990-01-19019 January 1990 Ack Receipt of 891030 Response to Generic Ltr 89-16 Re Installation of Hardened Wetwell Vent.Use of Results of Individual Plant Exams to Develop Supplemented Criteria for Vent Mod Design Acceptable ML19354E0801990-01-0808 January 1990 Forwards SALP Rept 50-271/88-99 for Jul 1988 - Sept 1989 ML19354D8791990-01-0808 January 1990 Forwards Safety Insp Rept 50-271/89-21 on 891017-1211.No Violations Noted ML20006D6981990-01-0505 January 1990 Forwards Revised NRC Forms 396 & 398 Re Personal Qualifications Statement - Licensee & Certification of Medical Exam by Facility Licensee,Respectively.Applications for Licenses Should Be Submitted on Forms by 900201 ML20005H1961990-01-0505 January 1990 Forwards Combined Replacement Exams,Requalification Program Evaluation & BWR Power Oscillation Insp Rept 50-271/89-18OL During Wks 891023 & 1106,respectively.Applicants Passed Exam & Issued Operator Licenses ML20011D5921989-12-20020 December 1989 Forwards Radiological Safety Insp Rept 50-271/89-16 on 891030-1103.No Violations Noted ML19332E9201989-11-29029 November 1989 Advises That Rev 19 to QA Program,Transmitted by , Acceptable,Per 10CFR50.54 Review ML19332E5891989-11-21021 November 1989 Forwards Safeguards Insp Rept 50-271/89-20 on 890925-29. Violations Noted But Will Not Be Cited Since Violation Was of Minor Significance ML19325F3531989-11-0909 November 1989 Grants Waiver of Compliance from Tech Spec Section 3.5.A.4 Re Use of Maint Ties When Uniterruptible Power Sys Inoperable,Per Licensee 891109 Request 1990-09-07 Category:OUTGOING CORRESPONDENCE MONTHYEARML20217N3901999-10-25025 October 1999
[Table view]Advises That Info Provided in & Affidavit Re Holtec Position Paper WS-115,rev 1,repts HI-87113, Rev 0,HI-87114,rev 0,HI-87102 Rev 0 & HI-87112,rev 0,marked Proprietary,Will Be Withheld from Public Disclosure ML20217L8591999-10-21021 October 1999 Discusses 990921 Request for Approval to Perform Alternative Testing as Part of Vermont Yankee Nuclear Power Station IST Program.Informs That Submittal Reviewed Against ASME Code Section XI Requirements & Forwards Safety Evaluation ML20217M1181999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20217D9711999-10-13013 October 1999 Responds to Request That Information Titled Addl Info Re Cycle Specific SLMCPR for Vermont Yankee Cycle 21 Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20217C1501999-10-0707 October 1999 Forwards Insp Rept 50-271/99-11 on 990809-27.No Violations Noted.Insp Focused on Effectiveness of Engineering Functions in Providing for Safe Operation of Plant ML20212J7891999-10-0404 October 1999 Informs That Licensee 980804,0628,29 & 990921 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Consider Subj GL to Be Closed for Plant ML20212J6501999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of VYNPS on 990913. No New Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues & Insp Plan Through Mar 2000 Encl ML20212C1621999-09-17017 September 1999 Forwards Amend 175 to License DPR-28 & Safety Evaluation. Amend Revises TSs to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to Standby Liquid Control System ML20216F3171999-09-13013 September 1999 Forwards Insp Rept 50-271/99-06 on 990621-0801.One Violation Identified & Being Treated as Noncited Violation ML20211G4791999-08-27027 August 1999 Forwards Notice of Withdrawal of 990420 Amend Request Re TS on Reloading & Unloading Sequence of Fuel in Reactor Core When All Fuel Removed from Core ML20211E8841999-08-25025 August 1999 Requests That Licensee Provide bldg-specific Justification for Use of Method A.1 at Locations Where Amplification Significantly Exceeds 1.5 Limit Above 8 Hz ML20211E1371999-08-20020 August 1999 Forwards from J Bean to H Miller & FEMA Final Exercise Rept for 990427-29 Plume Exposure & Ingestion Pathway Exercise for Vermont Yankee Nuclear Power Station.No Deficiencies Noted.Areas Requiring C/A Identified ML20211H0851999-08-19019 August 1999 Forwards Insp Rept 50-271/99-12 on 990628-0711 & Nov. Violation Re Failure to Monitor Unavailability of Specific Sys,Structures & Components During Refueling Outage Did Not Allow Adequate Assessment of Maint Effectiveness ML20216D7321999-07-26026 July 1999 Forwards Insp Rept 50-271/99-05 on 990510-0620.Two Viiolations Being Treated as Noncited Violations ML20209G2721999-07-14014 July 1999 Discusses Licensee Response to RAI Re GL 92-01,Rev 1,Suppl Suppl 1, Rv Structural Integrity, for Vermont Yankee Nuclear Power Station ML20209G6931999-07-14014 July 1999 Forwards Request for Addl Info Re Spent Fuel Storage Capacity Expansion ML20196G5241999-06-22022 June 1999 Responds to Re Changes to Vermont Yankee Guard Training & Qualification Plan,Rev 8,Errata A.No NRC Approval Is Required.Encl Will Be Withheld from Public Disclosure Per 10CFR73.21 ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20195J7221999-06-14014 June 1999 Forwards Insp Rept 50-271/99-03 on 990329-0509.Two Severity Level IV Violations Identified & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20195E1441999-06-10010 June 1999 Ack Receipt of Correspondence to NRC Commissioners Re Vermont Yankee Nuclear Power Station.Correspondence Forwarded to Staff for Appropriate Action ML20196J3001999-06-0404 June 1999 Informs That NRR Reorganized,Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Was Created. Reorganization Chart Encl ML20207G0921999-06-0404 June 1999 Forwards Insp Rept 50-271/99-04 on 990426-28.No Violations Noted.Insp Evaluated Performance of Emergency Response Organization During 990427,Vermont Yankee Nuclear Power Station full-participation Exercise ML20207E6001999-05-28028 May 1999 Forwards Operator Licensing Exam Rept 50-271/99-302 on 990510-11.Exam Addressed Areas Important to Public Health & Safety.Exam Developed & Administered Using Guidelines of NUREG-1021,Interim Rev 8.Both Applicants Passed Exam ML20207B8201999-05-25025 May 1999 Informs Licensee of Individual Exam Results for Applicants on Initial & Retake Exams Conducted on 990510-11 at Licensee Facility.Without Encls ML20206K1481999-05-0606 May 1999 Forwards Insp Rept 50-271/99-02 on 990215-0328.Three Severity Level IV Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20206J9951999-05-0505 May 1999 Informs That Util Authorized to Administer Initial Written Exams to Applicants Listed on 990510.Region I Operator Licensing Staff Will Administer Operating Test ML20206G6391999-05-0404 May 1999 Informs That Version of Holtec Intl Rept HI-981932 Marked as Proprietary Submitted by Util Will Be Withheld from Pubic Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20206E8641999-04-29029 April 1999 Forwards SER Concluding That Flaw Evaluation Meets Rules of ASME Code Concerning Util 990329 Request to Extend Reinspection Period for Jet Pump Riser Circumferential Weld Flaws Discovered During 1998 Refueling Outage ML20206A6871999-04-22022 April 1999 Informs of Completion of Review of Re Nepco in Capacity as Minority Shareholder in Vermont Yankee Nuclear Power Corp,Yaec,Myap & Connecticut Yankee Atomic Power Co ML20205P1551999-04-0909 April 1999 Discusses 990225 PPR & Forwards Plant Issues Matrix & Insp Plan.Insp Program Subject to Rev ML20205K7461999-04-0808 April 1999 Advises That Info Contained in Holtec Intl Affidavit, Will Be Withheld from Public Disclosure,Per 10CFR2.790 ML20205K7531999-04-0707 April 1999 Discusses Alternative Proposal for Reexamination of Circumferential Welds in Plant Rpv.Nrc Has Determined That Alternative Proposal Meets Conditions in BWRVIP-05 Rept. Forwards Safety Evaluation ML20205J0331999-03-31031 March 1999 Informs That on 980423 NRC Oi,Region I Field Ofc,Initiated an Investigation to Determine Whether Williams Power Corp Employee,Working at Vynp,Had Been Threatened & Eventually Fired in April 1998 ML20204J4321999-03-19019 March 1999 Forwards from Ve Quinn to Cl Miller Forwarding IEAL-R/85-11, Vermont Yankee Nuclear Power Station Site- Specific Offsite Radiological Emergency Preparedness Alert & Notification Sys QA Verification, for Info ML20204D7481999-03-16016 March 1999 Forwards Insp Rept 50-271/99-01 on 990104-0214.No Violations Noted.Security Program Insp Found That Licensee Implementing Security Program That Effectively Protects Against Acts of Radiological Sabotage ML20207M7771999-03-12012 March 1999 Ack Receipt of Inputs & Comments Re Vermont Yankee Nuclear Power Plant,Provided by Electronic Mail on 990218 & 23 ML20207L5591999-03-0101 March 1999 Requests Addl Info in Response to Questions 6,7 & 11 of RAI Re GL 96-06 Program at Vermont Yankee Nuclear Power Station ML20207L5471999-02-26026 February 1999 Forwards Request for Addl Info for Ongoing Review of Vermont Yankee IPEEE Submittal Dtd 980630.RAI Related to Fire, Seismic,Internal Flooding & High Wind,Flood & Other External Event Areas ML20203H9791999-02-18018 February 1999 Forwards SER Accepting Licensee 970123 Info Supporting Util Determination That Exam Coverage Achieved During Reactor Pressure Vessel Shell Weld Insp Constitutes Alternative Which Provides Acceptable Level of Quality & Safety ML20203H7631999-02-12012 February 1999 Responds to 981120 Request for NRC Authorization to Perform Alternative Testing to That Specified by ASME BPV Code & Asme/Ansi, Code for Operation & Maint of Npps. Reviewed & Agreed That 990114 SER Needs Revision ML20203H8431999-02-11011 February 1999 Refers to 990201 Request for Withdrawal of 980501 Amend Request.Amend Request Superceded with Another Proposed Change to Ts.Informs That Commission Filed Encl Notice of Withdrawal of Application for Amend to FOL with Ofc of Fr ML20203D1691999-02-0505 February 1999 Acknowledges Inputs,Comments & Requests for Action Re Vermont Yankee Nuclear Power Plant,Provided by Electronic Mail Messages Dtd 990110-13 ML20202G2611999-01-28028 January 1999 Forwards Insp Rept 50-271/98-14 on 981122-990104.No Violations Noted.Nrc Initial Review of Scram Discharge Vol Drain Valve Failures Indicates That Licensee Design Change Process Was Not Effective ML20199K7081999-01-21021 January 1999 Forwards Corrected SE for Amend 163 Issued to FOL DPR-28 on 981228.Determined That Pages 2 & 3 of SE Required Clarification ML20199K6891999-01-20020 January 1999 Informs of Completion of Review of YAEC-1339 Re Allowing Use of FIBWR2 to Validate Reload Analyses Which Include New Fuel Rods & Varied Water Tube Designs.Forwards SE Concluding That Use of YAEC-1339 at Vermont Yankee NPP Acceptable ML20202C9551999-01-20020 January 1999 Informs That Licensee Has Been Authorized to Administer Initial Written Exam to Applicants as Listed on 990122. Operator Licensing Staff Will Administer Operating Test to Applicants ML20199L5901999-01-14014 January 1999 Forwards SER Accepting Util 981120 Request for Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maintenance of Nuclear Power Plants DD-98-13, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Directors Decision DD-98-13 Has Expired.Decision Became Final Agency Action on 990104. with Certificate of Svc.Served on 9901061999-01-0606 January 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Directors Decision DD-98-13 Has Expired.Decision Became Final Agency Action on 990104. with Certificate of Svc.Served on 990106 IR 05000271/19970131998-12-23023 December 1998 Forwards Insp Rept 50-271/97-13 on 981011-1121.No Violations Noted.Radioactive Liquid & Gaseous Effluent Control Programs Were Considered to Be Well Implemented ML20198S1661998-12-17017 December 1998 Final Response to FOIA Request for Documents.Records Encl & Identified in App C & D.App E Records Withheld in Part & App F Records Withheld in Entirety (Ref FOIA Exemption 5) & App G Records Withheld in Entirety (Ref FOIA Exemptions 4 & 5) 1999-09-30 |
See also: IR 05000271/1989005
Text
. _ _ , _
.
.
,
.
9
.
May 4, 1989
Docket No. 50-271
1
1
Vermont Yankee Nuclear Power Corporation
j
ATTN:
Mr. Warren P. Murphy
Vice President and Manager
-
of Operations
4
RD 5, Box 169
Ferry Road
Brattleboro, Vermont 05301
!
f
Gentlemen:
l
Subject:
Inspection No. 50-271/89-05
[
This refers to the routine safety inspection conducted by Mr, A. Finkel of
this office on April 4-7, 1989 at the Vermont Yankee Nuclear Power Station,
Vernon, Vermont of activities authorized by NRC DPR-28 and to the discussions
of our findings held by Mr. Finkel with Mr. J. Pelletier and other members of
your staff at the conclusion of the inspection.
Areas examined.during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no violations were observed.
4
Sincerely,
ROBEliT F1 GALLO
1
Robert M. Gallo, Chief
Operations Branch
Division of Reactor. Safety
Enclosure:
NRC Region I Inspection Report Number 50-271/89-05
,
tA
0FFICIAL RECORD COPY
IR VY 89-05 - 0001.0.0
05/02/89
8905160069 890504
ADOCK 05000271
O
- _ _ _ _ _ _ - _ _ _ _ _ -
-
__
-
-
.
.
.
-
.
Vermont Yankee Nuclear
2
Power Corporation
cc: w/ encl:
J. Weigand, President and Chief Executive Officer
J. Pelletier, Plant Manager
J. DeVincentis, Vice President, Yankee Atomic Electric Company
R. Capstick, Licensing Engineer, Yankee Atomic Electric Company
J. Gilroy, Director, Vermont Public Interest Research Group, Inc.
G. Sterzinger, Commissioner, Vermont Department of Public Service
P. Agnes, Assistant Secretary of Public Safety, Commonwealth of
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Hampshire
State of Vermont
Commonwealth of Massachusetts
bcc: w/ encl:
Region I Docket Room (with concurrences)
l
M. Perkins, Management Assistant, DRMA (w/o encl)
D. Haverkamp, Section Chief, DRP
R. Bores, Technical Assistant, DRSS
K. Abraham, PA0 (12) (SALP Reports Only)
J. Wiggins, DRP
l
l
4
l
l
Y
RI:DRS
RI: RS
RS
l
Finkel/pmb/Ja
B
rg
Ga lo
.
y
QtL.
- / /89
3 /89
,89
St
OFFICIAL RECORD COPY
IR VY 89-05 - 0002.0.0
04/25/89
)