Forwards Insp Repts 50-317/89-15 & 50-318/89-16 on 890522-26 & 0609-16.Enforcement Conference Scheduled on 890720 Re Failure to Maintain &/Or Implement Effective Administrative Controls & QA Programs.Potential Violations Noted
ML20246H090
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 07/10/1989
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Creel G
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20246H094 List:
References
EA-89-141, NUDOCS 8907170015
Download: ML20246H090 (2)


See also: IR 05000317/1989015

Text

-. . . - - _ _ - - - - _ _ -

,

'.

. .e

. .

3 ,(

p

I'

-

.,-

3 05

JUL 101989

Docket Nos.-50-317

50-318

EA No.89-141

-

Baltimore Gas and Electric Company

ATTNi Mr George C. Creel

i

Vice President

Nuclear Energy-

Calvert Cliffs Nuclear Power Plant

MD Rts 2 & 4, Post Office Box 1535

,

.Lusby, Maryland 20657.

Gentlemen:

' Subject: NRC Region'1 Combined Inspection Report Nos. 50-317/89-15 and

50-318/89-16

'

The enclosed report transmits the findings of the May 22-26 and June 9-16, 1989

inspection

tion' ReportinNos.-

response .to unresolved items resulting from Special Team Inspec-'

50-317/89-200 and 50-318/89-200. These findings were - dis-

cussed with you and members of your staff.

Within the scope of. this inspection, 5 of 14 unresolved items identified during

Special Team Inspection 89-200 were inspected further. Of these, 4 were sub -

stantiated as potential violations. While no individual item in and of itself

may constitute a significant safety concern, in the' aggregate, it would appear.

that_ the common thread of failure to maintain and/or implement effective i

administrative controls and quality assurance programs exists.

Accordingly, an Enforcement Conference has been scheduled for July '20,1989, in

the Region I office, in order to discuss these issues with you. Following this

p.

meeting, we will forward the appropriate notification of enforcement action..

During the Enforcement Conference, please be prepared to discuss your assess-

1

'

ment of the current state of your administrative controls program, the broader

implications of deficiencies identified as a result of your assessment, and the

actions planned or taken to rectify the situation.

Your cooperation with us is appreciated.

o

Sincerely,

Odrh*l Simed By

William F. Kane, Director

Division of Reactor Projects

Enclosure:

HRC Region 1 Combined Inspection Report Nos. 50-317/89-15 and 50-317/89-16

gg

0FFICIAL RECORD COPY CIR CC 317/89-15 & 318/89-16 - 0001.0.0

07/07/89

,h

$"$$o$ 50

'Ct

pS7 I

_.

.

. .

. ,

'

l

Baltimore Gas and Electric Company 2

0M

cc w/ enc 1:

W. J. Lippold, General Supervisor, Technical Services Engineering

T. Magette, Administrator, Nuclear Evaluations

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NR'C Resident Inspector

State of Maryland (2)

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

W. Russell, RI

T. Martin, RI

W. Kane, RI

S. Collins, RI

J. Wiggins, RI

L. Tripp, RI

D. Limroth, RI

D. Holedy, RI.

G. Napuda, RI

J. Dyer, EDO

L. Slaggie, OGC

J. Lieberman, DE

M. Callahan, 0GC

J. Partlow, NRR

J. Cummins, NRR

J. Ball, NRR

'R. Capra, NRR

S. McNeil, NRR

(f:DR, ns:RP

, DaP de

Limroth/mjd LT ip JWiggins 11/ane.

'd

7/(/89 7/5/89 7/5 /89 7/l/89

0FFICIAL RECORD COPY CIR CC 317/89-15 & 318/89-16 - 0002.0.0

07/05/89

_ _ - - _ _ _ _ - _ _ _ _ _ _ _ _