Text
^
!
4
,.
,
91989
-
In-Reply Refer To:
Dockets: 50-313/89-02
a
50-368/89-02
)
4
Arkansas Power & Light Company
ATTN: Mr. Gene Campbell
Vice President, Nuclear
Operations
P.O. Box 551
Little Rock, Arkansas 72203
Gentlemen:
This refers to the inspection conducted by Messrs. W. D. Johnson, R. C. Haag,
and R. V. Azua of this office during the period January 1-31, 1989, of
1
activities authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas-
)
l
Nuclear One, Units 1 and 2, and to the discussion of our findings with
'
Mr. J. M. Levine, and other members of your staff at the conclusion of the
l
inspection.
Areas examined during the inspection included plant status, followup on
previously identified items, followup on licensee event reports,-followup of
i
events, operational safety verification, maintenance, and surveillance. Within
i
these areas, the inspection consisted of selective examination of procedures
)
and representative records, interviews with personnel, and observations by the
inspectors. The findings are documented in the enclosed inspection report.
l
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond. to
<
these violations, in writing, in accordance with the provisions-of '
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
l
Federal Regulations.
Your response should be based on the specifics contained
in the Notice of Violation (Notice) enclosed with this letter.
The response directed by this letter and the accompanying-Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
i
by the Paperwork Reduction Act of 1980. PL 96-511.
f
l
Regarding Violation A in the enclosed Notice, NRC. . licensees are required to
respond to Notices of Violation in the time allotted. The NRC staff understands
that, in'certain circumstances, the required dates may not be met and, in those
cases, the NRC staff would normally grant an extension if requested and
appropriate.
In the examples cited in the enclosed Notice of Violation, no
extensions were requested.
In the future, the NRC staff expects the Arkansas
Nuclear One staff to consider requests for ' extension in those unique
circumstances where the response deadlines cannot be satisfied.
g
&y
hk
KIT:S I
DRP/A
C:DRP/A
b
hDRP
DDChamberlain @N
_J
WDJohnson
ATHowell
3/s/89
3l
3/q/89
'3/F /89
3/[(/89
7 ocx cow
- g(\\
_
0
I
e
-
L
_ _ _ _ _ _ _ - _ _ _ _ _ - _
_
1
\\
.
.
l
.;
,
,
,
.
' Arkansas Power & Light Company
-2-
The NRC staff is also concerned with the number of AP&L's failures to report
events as required or report events within the times allotted by NRC-
i
requirements. The NRC staff does not, at this time, consider these failures to
be indicative of a significant breakdown in your program for satisfying NRC
_
.i
reporting requirements. However, increased management' attention is required _ in -
I
'
this area to assure future failures in your program do not recur. A management:
meeting to discuss these issues will be scheduled with the Region IV staff in
the near future.'
,
1
Should you have any questions concerning this inspection, we will be pleased to
J
discuss them with you.
)
1
Sincerely,
I
,
Onginal Siti7ed By:
A.B. BEACH
.
9
L. J. Callan, Director
j
Division of Reactor Projects
t
Enclosures:
1
1.
Appendix A - Notice of Violation
l
2.
Appendix B - NRC Inspection Report
j
50-313/89-02
50-368/89-02
cc w/ enclosures:
{
Arkansas Nuclear One
l
ATTN:
J. M. Levine, Executive Director
Nuclear Operations
P.O. Box 608
Russellville, Arkansas 72,801
Arkansas Radiation Control Program Director
bcc to DMB (IE01)
l
bec distrib'. by RIV:
- RRI
- Robert D. Martin, RA'
- RPB-DRSS
- SectionChief(DRP/A)
Lisa Shea, RM/ALF
- RIV File
- DRP
- MIS System.
- RSTS Operator
- Project Engineer, DRP/A
- C.Harbuck,NRRProjectManager(MS:
13-D-18)
- DL
- C
Poslusny, NRR Project Manager (MS:
13-D-18)
- w/766